ProjectCode | ProjectName | ProjectDescr | 12THPR | PRC 12th and Green Street | PRC 12th and Green Street |
1617COLB_IMP_WW | City of Long Beach IMP 2016-2017 Wet Weather | City of Long Beach Integrated Monitoring Program (IMP) 2016-2017 Wet Weather |
16PVPWMG-RWWet1 | PVPWMG Receiving Water Wet 2016-2017 Event 1 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Receiving Water Monitoring Wet Weather Event 1 (December 2016) |
1718COLB_IMP_DW | City of Long Beach IMP 2017-2018 Dry Weather | City of Long Beach Integrated Monitoring Program (IMP) 2017-2018 Dry Weather |
1718COLB_IMP_WW | City of Long Beach IMP 2017-2018 Wet Weather | City of Long Beach Integrated Monitoring Program (IMP) 2017-2018 Wet Weather |
1718PVPWMG-OFDry | PVPWMG Outfall Dry 2017-2018 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Outfall Monitoring Dry Weather Monthly Events (July 2017-June 2018) |
1718PVPWMG-OFWet1 | PVPWMG Outfall Wet 2017-2018 Event 1 | |
1718PVPWMG-OFWet2 | PVPWMG Outfall Wet 2017-2018 Event 2 | |
1718PVPWMG-OFWet3 | PVPWMG Outfall Wet 2017-2018 Event 3 | |
1718PVPWMG-OFWetSS | PVPWMG Outfall Wet 2017-2018 SS | |
1718PVPWMG-RWDry1 | PVPWMG Receiving Water Dry 2017-2018 Event 1 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Receiving Water Monitoring Dry Weather Event 1 (September 2017) |
1718PVPWMG-RWDry2 | PVPWMG Receiving Water Dry 2017-2018 Event 2 | |
1718PVPWMG-RWWet1 | PVPWMG Receiving Water Wet 2017-2018 Event 1 | |
1718PVPWMG-RWWet2 | PVPWMG Receiving Water Wet 2017-2018 Event 2 | |
1718PVPWMG-RWWet3 | PVPWMG Receiving Water Wet 2017-2018 Event 3 | |
17CLFall | Colorado Lagoon TMDL Monitoring (2017 Fall) | City of Long Beach Colorado Lagoon TMDL Monitoring (2017 Fall) |
17CLSmr | Colorado Lagoon TMDL Monitoring (2017 Summer) | City of Long Beach Colorado Lagoon TMDL Monitoring (2017 Summer) |
17GWMAFaWt | GWMA_2017_FallWet | |
17GWMASuDr | GWMA_2017_SmrDry | |
1819COLB_IMP_DW | City of Long Beach IMP 2018-2019 Dry Weather | City of Long Beach Integrated Monitoring Program (IMP) 2018-2019 Dry Weather |
1819COLB_IMP_WW | City of Long Beach IMP 2018-2019 Wet Weather | City of Long Beach Integrated Monitoring Program (IMP) 2018-2019 Wet Weather |
1819PVPWMG-OFDry | PVPWMG Outfall Dry 2018-2019 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Outfall Monitoring Dry Weather Monthly Events (July 2018-December 2018) |
1819PVPWMG-OFWet1 | PVPWMG Outfall Wet 2018-2019 Event 1 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Outfall Monitoring Wet Weather Event 1 (November 22, 2018) |
1819PVPWMG-OFWet2 | PVPWMG Outfall Wet 2018-2019 Event 2 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Outfall Monitoring Wet Weather Event 2 (November 29, 2018) |
1819PVPWMG-OFWet3 | PVPWMG Outfall Wet 2018-2019 Event 3 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Outfall Monitoring Wet Weather Event 3 (January 5, 2019) |
1819PVPWMG-OFWetSS | PVPWMG Outfall Wet 2018-2019 SS | |
1819PVPWMG-RWDry1 | PVPWMG Receiving Water Dry 2018-2019 Event 1 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Receiving Water Monitoring Dry Weather Event 1 (August 21, 2018) |
1819PVPWMG-RWDry2 | PVPWMG Receiving Water Dry 2018-2019 Event 2 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Receiving Water Monitoring Dry Weather Event 2 (June 19, 2019) |
1819PVPWMG-RWWet1 | PVPWMG Receiving Water Wet 2018-2019 Event 1 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Receiving Water Monitoring Wet Weather Event 1 (November 25, 2018) |
1819PVPWMG-RWWet2 | PVPWMG Receiving Water Wet 2018-2019 Event 2 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Receiving Water Monitoring Wet Weather Event 2 (December 3, 2018) |
1819PVPWMG-RWWet3 | PVPWMG Receiving Water Wet 2018-2019 Event 3 | Palos Verdes Peninsula CIMP Group (or PVP Watershed Management Group) Receiving Water Monitoring Wet Weather Event 3 (January 7, 2019) |
18CLSmr | Colorado Lagoon TMDL Monitoring (2018 Summer) | City of Long Beach Colorado Lagoon TMDL Monitoring (2018 Summer) |
18CLSpring | Colorado Lagoon TMDL Monitoring (2018 Spring) | City of Long Beach Colorado Lagoon TMDL Monitoring (2018 Spring) |
18CLWntr | Colorado Lagoon TMDL Monitoring (2018 Winter) | City of Long Beach Colorado Lagoon TMDL Monitoring (2018 Winter) |
18GWMAFawt | GWMA_2018_FallWet | |
18GWMAFish | GWMA_2018_Fish | |
18GWMASed | GWMA_2018_Sed | |
18GWMASuDr | GWMA_2018_SmrDry | |
18GWMAWiWt | GWMA_2018_WntrWet | |
1920COLB_IMP_DW | City of Long Beach IMP 2019-2020 Dry Weather | |
1920COLB_IMP_WW | City of Long Beach IMP 2019-2020 Wet Weather | |
1920PVPWMG-OFDry | PVPWMG Outfall Dry 2019-2020 | |
1920PVPWMG-OFWet1 | PVPWMG Outfall Wet 2019-2020 Event 1 | |
1920PVPWMG-OFWet2 | PVPWMG Outfall Wet 2019-2020 Event 2 | |
1920PVPWMG-RWDry1 | PVPWMG Receiving Water Dry 2019-2020 Event 1 | |
1920PVPWMG-RWWet1 | PVPWMG Receiving Water Wet 2019-2020 Event 1 | |
1920PVPWMG-RWWet2 | PVPWMG Receiving Water Wet 2019-2020 Event 2 | |
19CLSmr | City of Long Beach Colorado Lagoon TMDL Monitoring | |
19CLWntr | Colorado Lagoon TMDL Monitoring (2019 Winterl) | City of Long Beach Colorado Lagoon TMDL Monitoring (2019 Winter) |
19GWMAWiWt | GWMA_2019_WntrWet | |
20DRMP5CEC | 2020 Delta RMP Constituents of Emerging Concern | 2020 Delta Regional Monitoring Program Pilot Study of Constituents of Emerging Concern in the Sacramento-San Joaquin Delta |
20DRMP5CUP | 2020 Delta RMP Current Use Pesticides | 2020 Delta Regional Monitoring Program Current Use Pesticides Water Year 21 Sampling Dates Oct 2020-Sept 2021 |
21DRMP5CEC | 2021 Delta RMP Constituents of Emerging Concern | 2021 Delta Regional Monitoring Program Pilot Study of Constituents of Emerging Concern in the Sacramento-San Joaquin Delta |
22DRMP5CUP | 2022 Delta RMP Current Use Pesticides | 2022 Delta Regional Monitoring Program Current Use Pesticides Water Year 23 Sampling Dates Oct 2022-Sept 2023 |
23DRMP5CEC | 2023 Delta RMP Constituents of Emerging Concern | 2023 Delta Regional Monitoring Program Pilot Study of Constituents of Emerging Concern in the Sacramento-San Joaquin Delta |
23DRMP5CUP | 2023 Delta RMP Current Use Pesticides | 2023 Delta Regional Monitoring Program Current Use Pesticides Water Year 2024 Sampling Dates Oct 2023-Sept 2024 |
3CREEKS | Three Creeks Restoration | Three Creeks Restoration - various grant programs |
AB_LM | Ambient Bay and Lagoon Monitoring | Includes sediment triad approach (chemistry, toxicity, benthic community assessments) and water quality data for San Diego County lagoons and estuaries. One event per year. |
ACARM_2011 | Alameda Creek Aquatic Resource Monitoring 2011 | Alameda Creek Aquatic Resource Monitoring 2011 |
ACARM_2012 | Alameda Creek Aquatic Resource Monitoring 2012 | Alameda Creek Aquatic Resource Monitoring 2012 |
ACARM_2013 | Alameda Creek Aquatic Resource Monitoring 2013 | Alameda Creek Aquatic Resource Monitoring 2013 |
ACARM_2014 | Alameda Creek Aquatic Resource Monitoring 2014 | Alameda Creek Aquatic Resource Monitoring 2014 |
ACARM_2015 | Alameda Creek Aquatic Resource Monitoring 2015 | Alameda Creek Aquatic Resource Monitoring 2015 |
ACARM_2016 | Alameda Creek Aquatic Resource Monitoring 2016 | Alameda Creek Aquatic Resource Monitoring 2016 |
ACARM_2017 | Alameda Creek Aquatic Resource Monitoring 2017 | Alameda Creek Aquatic Resource Monitoring 2017 |
ACARM_2018 | Alameda Creek Aquatic Resource Monitoring 2018 | Alameda Creek Aquatic Resource Monitoring 2018 |
ACARM_2019 | Alameda Creek Aquatic Resource Monitoring 2019 | Alameda Creek Aquatic Resource Monitoring 2019 |
ACARM_2020 | Alameda Creek Aquatic Resource Monitoring 2020 | Alameda Creek Aquatic Resource Monitoring 2020 |
ACARM_2021 | Alameda Creek Aquatic Resource Monitoring 2021 | Alameda Creek Aquatic Resource Monitoring 2021 |
ACARM_2022 | Alameda Creek Aquatic Resource Monitoring 2022 | Alameda Creek Aquatic Resource Monitoring 2022 |
ACARM_2023 | Alameda Creek Aquatic Resource Monitoring 2023 | Alameda Creek Aquatic Resource Monitoring 2023 |
ACCWP_CSM_WY2016 | ACCWP Creek Status Monitoring in WY2016 | Alameda County Clean Water Program Creek Status Monitoring in WY2016 |
ACCWP_CSM_WY2017 | ACCWP Creek Status Monitoring in WY2017 | Alameda County Clean Water Program Creek Status Monitoring in WY2017 |
ACCWP_CSM_WY2018 | ACCWP Creek Status Monitoring in WY2018 | ACCWP Creek Status Monitoring in WY2018 |
ACCWP_CSM_WY2019 | ACCWP Creek Status Monitoring in WY2019 | ACCWP Creek Status Monitoring in WY2019 |
ACCWP_CSM_WY2020 | ACCWP Creek Status Monitoring in WY2020 | ACCWP Creek Status Monitoring in WY2020 |
ACCWP_CSM_WY2021 | ACCWP Creek Status Monitoring in WY2021 | ACCWP Creek Status Monitoring in WY2021 |
ACCWP_CSM_WY2022 | ACCWP Creek Status Monitoring in WY2022 | ACCWP Creek Status Monitoring in WY2022 |
ACCWP_CSM_WY2023 | ACCWP Creek Status Monitoring in WY2023 | ACCWP Creek Status Monitoring in WY2023 |
ACCWP_LID | ACCWP Low Impact Development Monitoring | |
ACCWP_LID_WY2024 | ACCWP Low Impact Development Monitoring in WY2024 | ACCWP Low Impact Development Monitoring in WY2024 |
ACCWP_LID_WY2025 | ACCWP Low Impact Development Monitoring in WY2025 | ACCWP Low Impact Development Monitoring in WY2025 |
ACCWP_P&T_WY2018 | ACCWP Pesticide and Toxicity Monitoring in WY18 | ACCWP Pesticide and Toxicity Monitoring in WY18 |
ACCWP_P&T_WY2023 | ACCWP Pesticides and Toxicity Monitoring in WY2023 | ACCWP Pesticides and Toxicity Monitoring in WY2023 |
ACCWP_P&T_WY2024 | ACCWP Pesticides and Toxicity Monitoring in WY2024 | |
ACCWP_POC_WY2017 | ACCWP Pollutants of Concern Monitoring in WY2017 | ACCWP Pollutants of Concern Monitoring in WY2017 |
ACCWP_POC_WY2018 | ACCWP Pollutants of Concern Monitoring in WY2018 | ACCWP Pollutants of Concern Monitoring in WY2018 |
ACCWP_POC_WY2019 | ACCWP Pollutants of Concern Monitoring in WY2019 | ACCWP Pollutants of Concern Monitoring in WY2019 |
ACCWP_POC_WY2020 | ACCWP Pollutant of Concern Monitoring in WY2020 | ACCWP Pollutant of Concern Monitoring in WY2020 |
ACCWP_POC_WY2021 | ACCWP Pollutants of Concern Monitoring in WY2021 | ACCWP Pollutants of Concern Monitoring in WY2021 |
ACCWP_POC_WY2022 | ACCWP Pollutant of Concern Monitoring in WY2022 | ACCWP Pollutants of Concern Monitoring in WY2022 |
ACCWP_POC_WY2023 | ACCWP Pollutant of Concern Monitoring in WY2023 | ACCWP Pollutant of Concern Monitoring in WY2023 |
ACCWP_POC_WY2024 | ACCWP Pollutant of Concern Monitoring in WY2024 | |
ACCWP_POCx_WY2020 | ACCWP POC Monitoring in Urban Soils in WY2020 | ACCWP Pollutant of Concern Monitoring in Urban Soils in WY2020 |
ACCWP_POCx_WY2021 | ACCWP POC Monitoring in Urban Soils in WY2021 | ACCWP Pollutants of Concern Monitoring in Urban Soils in WY2021 |
ACCWP_POCx_WY2022 | ACCWP POC Monitoring in Urban Soils in WY2022 | ACCWP Pollutants of Concern Monitoring in Urban Soils in WY2022 |
ACCWP_POCx_WY2023 | ACCWP POC Monitoring in Urban Soils in WY2023 | ACCWP Pollutants of Concern Monitoring in Urban Soils in WY2023 |
ACCWP_POCx_WY2024 | ACCWP POC Monitoring in Urban Soils in WY2024 | |
ACCWP_RWL | ACCWP Receiving Water Limitations | |
ACPWA_LIDDP_TC_FY2014 | ACPWA Low Impact Dev Demo Turner Court 2014 | ACPWA Low Impact Dev Demonstration Project, Turner Court Parking Lots 2014 |
ACPWA_LIDDP_TC_FY2015 | ACPWA Low Impact Dev Demo Turner Court Field 2015 | ACPWA Low Impact Device Demonstration Project, Turner Court Parking Lots, Field Year 2015 |
ACPWA_LIDDP_TC_FY2016 | ACPWA Low Impact Dev Demo Turner Court Year 2016 | ACPWA Low Impact Device Demonstration Project, Turner Court Parking Lots, Field Year 2016 |
ACPWA_LIDDP_TC_FY2019 | ACPWA LIDDP TC FY2019 | ACPWA Low Impact Dev Demonstration Project, Turner Court Parking Lots 2019 |
AdobeSprings_MRP | Adobe Springs Monitoring and Reporting Program | |
AGW_PhaseI | Ag Waiver Phase I Monitoring | Ag Waiver Phase I Monitoring |
AGW_PhaseII | Ag Waiver Phase II Monitoring | Ag Waiver Phase II Monitoring |
AGW_SplitSampling | Ag Waiver Split Sampling | Ag Waiver Split Sampling |
Alvarado_Creek_BA_2023 | Alvarado Creek Bioassessment Monitoring - 2023 | Alvarado Creek Bioassessment Monitoring - 2023 |
Alvarado_Creek_Bioassessment_2020 | Alvarado Creek Bioassessment Monitoring - 2020 | Alvarado Creek Bioassessment Monitoring - 2020 |
Alvarado_Creek_Bioassessment_2022 | Alvarado Creek Bioassessment Monitoring - 2022 | Alvarado Creek Bioassessment Monitoring - 2022 |
Alvarado_SI | Alvarado Creek Human Source Investigation | Alvarado Creek Human Source Investigation |
ARC_CRWQMP_2017 | ARC Cosumnes River WQ Monitoring Program 2017 | American River Conservancy Cosumnes River Water Quality Monitoring Program 2017 |
ARC_CRWQMP_2018 | ARC Cosumnes River WQ Monitoring Program 2018 | |
ARC_CRWQMP_2019 | ARC Cosumnes River WQ Monitoring Program 2019 | American River Conservancy Cosumnes River Water Quality Monitoring Program 2019 |
AWG_Ambient | Alpine Watershed Group Ambient Monitoring | Alpine Watershed Group Ambient Monitoring |
AWG_Bioassessment | Alpine Watershed Group Bioassessment Sampling | Alpine Watershed Group Bioassessment Sampling |
BacteriaTMDL_SDR | San Diego River Bacteria TMDL Monitoring Program | Bacteria TMDL Monitoring Program for Forester Creek, the Lower San Diego River, and the Pacific Ocean Shoreline at San Diego River mouth at Dog Beach. |
BacteriaTMDL_SDR_FollowUp | San Diego River Bacteria TMDL Follow-Up Monitoring | Dry weather follow-up monitoring for the Bacteria TMDL Monitoring Program in the San Diego River Watershed. |
BacteriaTMDL_SLR | San Luis River Bacteria TMDL Monitoring Program | Bacteria TMDL Monitoring Program for Pacific Ocean Shoreline at the San Luis Rey River Mouth. |
BACWA_SuBay_2011 | BACWA Suisun Bay Monitoring Project 2011 | Bay Area Clean Water Agencies Suisun Bay Monitoring Project 2011 |
BACWA_SuBay_2012 | BACWA Suisun Bay Monitoring Project 2012 | Bay Area Clean Water Agencies Suisun Bay Monitoring Project 2012 |
Bad Suisun_2013_Fall | Bad Suisun 2013 Fall sampling | Testing inhibition of phytoplankton growth in Suisun Bay and Sacramento - fall 2013 sampling |
Bad Suisun_2013_Summer | Bad Suisun 2013 Summer sampling | Testing inhibition of phytoplankton growth in Suisun Bay and Sacramento - summer 2013 sampling |
Bad Suisun_2014_Spring | Bad Suisun 2014 Spring sampling | Testing inhibition of phytoplankton growth in Suisun Bay and Sacramento - spring 2014 sampling |
Bad Suisun_2014_Winter | Bad Suisun 2014 Winter sampling | Testing inhibition of phytoplankton growth in Suisun Bay and Sacramento - winter 2014 sampling |
BASMAA_Historic_ACCWP | Historic BASMAA Monitoring- ACCWP | |
BASMAA_Historic_CCCWP | Historic BASMAA Monitoring- CCCWP | |
BASMAA_Historic_ICARE | Historic BASMAA Monitoring- ICARE | |
BASMAA_Historic_MCSTOPPP | Historic BASMAA Monitoring- MCSTOPPP | |
BASMAA_Historic_SCVURPPP | Historic BASMAA Monitoring- SCVURPPP | |
BASMAA_Historic_SEC | Historic BASMAA Monitoring- SEC | |
BASMAA_Historic_SMCWPPP | Historic BASMAA Monitoring- SMCWPPP | |
BASMAA_RMC_FY2012 | BASMAA Regional Monitoring Coalition FY 2011-2012 | Monitoring |
BASMAA_RMC_FY2014 | BASMAA Regional Monitoring Coalition FY 2014 | Monitoring |
BBM | Beach Bacteria Monitoring | Weekly monitoring of coliforms and enterococci of select beaches in Santa Cruz City |
BCA | Citizen's Water Monitoring | Water Quality Monitoring in upper Battle Creek watershed |
BeachWatch_OC | BeachWatch_Orange County | BeachWatch_Orange County |
Big_Dalton_Rehabilitation_2024 | Big Dalton Dam Sluiceway BA Monitoring - 2024 | Big Dalton Dam Sluiceway BA Monitoring - 2024 |
Bight08 | So. Ca. Bight 2008 | Using monitoring methods, gather and provide synoptic information about the ecological condition of reference areas and wastewater and stormwater discharge areas on the mainland shelf of bight 2008 |
Bight2013 | So. Ca. Bight 2013 | Using monitoring methods, gather and provide synoptic information about the ecological condition of reference areas and wastewater and stormwater discharge areas on the mainland shelf of bight 2013 |
Bight2018 | So. Ca. Bight 2018 | Using monitoring methods, gather and provide synoptic information about the ecological condition of reference areas and wastewater and stormwater discharge areas on the mainland shelf of Bight 2018 |
BVC_AY13_Q2 | BVC, Order R5-2008-0005, Sep 1st 2013, AY13, Q2 | Buena Vista Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2013 Submittal, Annual Year 2013, Quarter 2, Sampling Dates Apr-Jun 2013 |
BVC_AY13_Q3 | BVC, Order R5-2008-0005, Dec 1st 2013, AY13, Q3 | Buena Vista Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2013 Submittal, Annual Year 2013, Quarter 3, Sampling Dates Jul-Sep 2013 |
BVC_AY13_Q4 | BVC, Order R5-2008-0005, Mar 1st 2014, AY13, Q4 | Buena Vista Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2014 Submittal, Annual Year 2013, Quarter 4, Sampling Dates Oct-Dec 2013 |
BVC_AY14_Q1 | BVC, Order R5-2013-0120, Jun 1st 2014, AY14, Q1 | Buena Vista Coalition Monitoring Under ILRP Order R5-2013-0120, June1st 2014 Submittal, Annual Year 2014, Quarter 1, Sampling Dates Jan-Mar 2014 |
BVC_AY14_Q2 | BVC, Order R5-2013-0120, Sep 1st 2014, AY14, Q2 | Buena Vista Coalition Monitoring Under ILRP Order R5-2013-0120, September 1st 2014 Submittal, Annual Year 2014, Quarter 2, Sampling Dates Apr-Jun 2014 |
BVC_AY14_Q3 | BVC, Order R5-2013-0120, Dec 1st 2014, AY14, Q3 | Buena Vista Coalition Monitoring Under ILRP Order R5-2013-0120, December 1st 2014 Submittal, Annual Year 2014, Quarter 3, Sampling Dates Jul-Sep 2014 |
BVC_AY14_Q4 | BVC, Order R5-2013-0120, Mar 1st 2015, AY14, Q4 | Buena Vista Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2015 Submittal, Annual Year 2014, Quarter 4, Sampling Dates Oct-Dec 2014 |
BVC_AY15_Q1 | BVC, Order R5-2013-0120, Jun 1st 2015, AY15, Q1 | Buena Vista Coalition Monitoring Under ILRP Order R5-2013-0120, June1st 2015 Submittal, Annual Year 2015, Quarter 1, Sampling Dates Jan-Mar 2015 |
BVC_AY15_Q2 | BVC, Order R5-2013-0120, Sep 1st 2015, AY15, Q2 | Buena Vista Coalition Monitoring Under ILRP Order R5-2013-0120, September 1st 2015 Submittal, Annual Year 2015, Quarter 2, Sampling Dates Apr-Jun 2015 |
BVC_AY15_Q3 | BVC, Order R5-2013-0120, Dec 1st 2015, AY15, Q3 | Buena Vista Coalition Monitoring Under ILRP Order R5-2013-0120, December1st 2015 Submittal, Annual Year 2015, Quarter 3, Sampling Dates July-Sep 2015 |
BVC_AY15_Q4 | BVC, Order R5-2013-0120, Mar 1st 2016, AY15, Q4 | Buena Vista Coalition Monitoring Under ILRP Order R5-2013-0120, March 1st 2016 Submittal, Annual Year 2015 Quarter 4, Sampling Dates Oct-Dec 2015 |
BVC_AY16_Q1 | BVC, Order R5-2013-0120, Jun 1st 2016, AY16, Q1 | Buena Vista Coalition Monitoring Under ILRP Order R5-2013-0120, June 1st 2016 Submittal, Annual Year 2016, Quarter 1, Sampling Dates Jan-Mar 2016 |
BVC_AY16_Q2 | BVC, Order R5-2013-0120, Sep 1st 2016, AY16, Q2 | Buena Vista Coalition Monitoring Under ILRP Order R5-2013-0120, September 1st 2016 Submittal, Annual Year 2016, Quarter 2, Sampling Dates Apr-Jun 2016 |
CalPolySLO_FLOW | Cal Poly SLO Flow Monitoring | Instantaneous discharge measurements collected by California Polytechnic State University of San Luis Obispo. Data shared with the CCWC as part of CCWC_FLOW program. |
campus_lid_monitoring | Low-Impact Development BMP @CSUS Monitoring | Collection and analysis of stormwater samples and hydrologic data at several BMPs installed on the CSUS. The purpose of this effort is to evaluate the efficacy of these devices. |
CAW_AY14_Q1 | CAW, Order R5-2013-0120, Jun 1st 2014, AY14, Q1 | Cawelo Water District Monitoring Under ILRP Order R5-2013-0120, June 1st 2014 Submittal, Annual Year 2014, Quarter 1, Sampling Dates Jan-Mar 2014 |
CAW_AY14_Q2 | CAW, Order R5-2013-0120, Sep 1st 2014, AY14, Q2 | Cawelo Water District Monitoring Under ILRP Order R5-2013-0120, September 1st 2014 Submittal, Annual Year 2014, Quarter 2, Sampling Dates Apr-June 2014 |
CAW_AY14_Q3 | CAW, Order R5-2013-0120, Dec 1st 2014, AY14, Q3 | Cawelo Water District Monitoring Under ILRP Order R5-2013-0120, December 1st 2014 Submittal, Annual Year 2014, Quarter 3, Sampling Dates Jul-Sep 2014 |
CAW_AY14_Q4 | CAW, Order R5-2013-0120, Mar 1st 2015, AY14, Q4 | Cawelo Water District Monitoring Under ILRP Order R5-2013-0120, March 1st 2015 Submittal, Annual Year 2014, Quarter 4, Sampling Dates Oct-Dec 2014 |
CAW_AY15_Q1 | CAW, Order R5-2013-0120, Jun 1st 2015, AY15, Q1 | Cawelo Water District Monitoring Under ILRP Order R5-2013-0120, June 1st 2015 Submittal, Annual Year 2015, Quarter 1, Sampling Dates Jan-Mar 2015 |
CAW_AY15_Q2 | CAW, Order R5-2013-0120, Sep 1st 2015, AY15, Q2 | Cawelo Water District Monitoring Under ILRP Order R5-2013-0120, September 1st 2015 Submittal, Annual Year 2015, Quarter 2, Sampling Dates Apr-Jun 2015 |
CAW_AY15_Q3 | CAW, Order R5-2013-0120, Dec 1st 2015, AY15, Q3 | Cawelo Water District Monitoring Under ILRP Order R5-2013-0120, December 1st 2015 Submittal, Annual Year 2015, Quarter 3, Sampling Dates Jul-Sep 2015 |
CAW_AY15_Q4 | CAW, Order R5-2013-0120, Mar 1st 2016, AY15, Q4 | Cawelo Water District Monitoring Under ILRP Order R5-2013-0120, Mar 1st 2016 Submittal, Annual Year 2015, Quarter 4, Sampling Dates Oct-Dec 2015 |
CAW_AY16_Q1 | CAW, Order R5-2013-0120, Jun 1st 2016, AY16, Q1 | Cawelo Water District Monitoring Under ILRP Order R5-2013-0120, June 1st 2016 Submittal, Annual Year 2016, Quarter 1, Sampling Dates Jan-Mar 2016 |
CAW_AY16_Q2 | CAW, Order R5-2013-0120, Sep 1st 2016, AY16, Q2 | Cawelo Water District Monitoring Under ILRP Order R5-2013-0120, September 1st 2016 Submittal, Annual Year 2016, Quarter 2, Sampling Dates Apr-Jun 2016 |
CBI Monitoring Program | CBI Monitoring Program | Clean Beaches Initiative Monitoring Program |
CCCWP_ DO_MON_MC_WY2023 | CCCWP Pollutants of Concern Monitoring in WY2023 | |
CCCWP_CSM_WY2017 | CCCWP Creek Status Monitoring in WY2017 | Contra Costa County Clean Water Program Creek Status Monitoring in WY2017 |
CCCWP_CSM_WY2018 | CCCWP Creek Status Monitoring in WY2018 | Contra Costa County Clean Water Program Creek Status Monitoring in WY2018 |
CCCWP_CSM_WY2019 | CCCWP Creek Status Monitoring in WY2019 | Contra Costa County Clean Water Program Creek Status Monitoring in WY2019 |
CCCWP_CSM_WY2020 | CCCWP Creek Status Monitoring in WY2020 | Contra Costa County Clean Water Program Creek Status Monitoring in WY2020 |
CCCWP_CSM_WY2021 | CCCWP Creek Status Monitoring in WY2021 | Contra Costa County Clean Water Program Creek Status Monitoring in WY2021 |
CCCWP_CSM_WY2022 | CCCWP Creek Status Monitoring in WY2022 | Contra Costa County Clean Water Program Creek Status Monitoring in WY2022 |
CCCWP_CSM_WY2023 | CCCWP Creek Status Monitoring in WY2023 | Contra Costa County Clean Water Program Creek Status Monitoring in WY2023 |
CCCWP_LID | CCCWP Low Impact Development Monitoring | |
CCCWP_LID_WY2024 | CCCWP Low Impact Development Monitoring in WY2024 | CCCWP Low Impact Development Monitoring in WY2024 |
CCCWP_LID_WY2025 | CCCWP Low Impact Development Monitoring in WY2025 | CCCWP Low Impact Development Monitoring in WY2025 |
CCCWP_P&T_WY2022 | CCCWP Pesticides and Toxicity Monitoring WY2022 | CCCWP Pesticides and Toxicity Monitoring in WY2022 |
CCCWP_P&T_WY2023 | CCCWP Pesticides and Toxicity Monitoring in WY2023 | |
CCCWP_POC_COPNUT_WY2017 | CCCWP POC Copper and Nutrients Monitoring, WY 2017 | Contra Costa Clean Water Program Pollutants of Concern Monitoring, Copper and Nutrients, Water Year 2017 |
CCCWP_POC_COPNUT_WY2018 | CCCWP POC Copper and Nutrients Monitoring, WY 2018 | Contra Costa Clean Water Program Pollutants of Concern Monitoring, Copper and Nutrients, Water Year 2018 |
CCCWP_POC_HDS_WY2019 | CCCWP POC Hydrodynamic Separator, WY 2019 | Contra Costa Clean Water Program Pollutants of Concern Monitoring, Hydrodynamic Separator, Water Year 2019 |
CCCWP_POC_MeHgPH1_WY2017 | CCCWP POC Mercury Monitoring, Phase 1, WY 2017 | Contra Costa Clean Water Program Pollutants of Concern Monitoring, Mercury and Methyl Mercury, Phase 1, Marsh Creek Watershed Discharge, Water Year 2017 |
CCCWP_POC_PCBRECWAT_WY2018 | CCCWP POC PCBRECWAT WY 2018 | Contra Costa Clean Water Program Pollutants of Concern Monitoring, Mercury and PCBs in Receiving Waters, Water Year 2018 |
CCCWP_POC_SimsMtls_WY2020 | CCCWP POC PCB Monitoring, WY 2020 | Contra Costa Clean Water Program Pollutants of Concern Monitoring, PCBs, Water Year 2020 |
CCCWP_POC_TIER1_WY2019 | CCCWP POC Tier 1 Street Dirt Monitoring, WY 2019 | Contra Costa Clean Water Program Pollutants of Concern Monitoring, Tier 1 Street Dirt, Water Year 2019 |
CCCWP_PTM_WY2018 | CCCWP Pesticide and Toxicity Monitoring in WY2018 | Contra Costa County Clean Water Program Wet Weather Pesticide and Toxicity Monitoring in Water Year 2018 |
CCCWP_RWL | CCCWP Receiving Water Limitations | |
CCCWP_SSID_MC_WY2018 | CCCWP_SSID_MC_WY2018 | Contra Costa Clean Water Program Marsh Creek Stressor and Source Identification Study, Water Year 2018 |
CCCWP_SSID_MC_WY2019 | CCCWP_SSID_MC_WY2019 | Contra Costa Clean Water Program Marsh Creek Stressor and Source Identification Study, Water Year 2019 |
CCLEAN_2001_Dry | CCLEAN_2001_Dry | CCLEAN_2001_Dry |
CCLEAN_2001_Wet | CCLEAN_2001_Wet | CCLEAN_2001_Wet |
CCLEAN_2002_Dry | CCLEAN_2002_Dry | CCLEAN_2002_Dry |
CCLEAN_2002_Wet | CCLEAN_2002_Wet | CCLEAN_2002_Wet |
CCLEAN_2003_Dry | CCLEAN_2003_Dry | CCLEAN_2003_Dry |
CCLEAN_2003_Wet | CCLEAN_2003_Wet | CCLEAN_2003_Wet |
CCLEAN_2004_Dry | CCLEAN_2004_Dry | CCLEAN_2004_Dry |
CCLEAN_2004_Wet | CCLEAN_2004_Wet | CCLEAN_2004_Wet |
CCLEAN_2005_Dry | CCLEAN_2005_Dry | CCLEAN_2005_Dry |
CCLEAN_2005_Wet | CCLEAN_2005_Wet | CCLEAN_2005_Wet |
CCLEAN_2006_Dry | CCLEAN_2006_Dry | CCLEAN_2006_Dry |
CCLEAN_2006_Wet | CCLEAN_2006_Wet | CCLEAN_2006_Wet |
CCLEAN_2007_Dry | CCLEAN_2007_Dry | CCLEAN_2007_Dry |
CCLEAN_2007_Wet | CCLEAN_2007_Wet | CCLEAN_2007_Wet |
CCLEAN_2008_Dry | CCLEAN_2008_Dry | CCLEAN_2008_Dry |
CCLEAN_2008_Wet | CCLEAN_2008_Wet | CCLEAN_2008_Wet |
CCLEAN_2009_Dry | CCLEAN_2009_Dry | CCLEAN_2009_Dry |
CCLEAN_2009_Wet | CCLEAN_2009_Wet | CCLEAN_2009_Wet |
CCLEAN_2010_Dry | CCLEAN_2010_Dry | CCLEAN_2010_Dry |
CCLEAN_2010_Wet | CCLEAN_2010_Wet | CCLEAN_2010_Wet |
CCLEAN_2011_Dry | CCLEAN_2011_Dry | CCLEAN_2011_Dry |
CCLEAN_2011_Wet | CCLEAN_2011_Wet | CCLEAN_2011_Wet |
CCLEAN_2012_Dry | CCLEAN_2012_Dry | CCLEAN_2012_Dry |
CCLEAN_2012_Wet | CCLEAN_2012_Wet | CCLEAN_2012_Wet |
CCLEAN_2013_Dry | CCLEAN_2013_Dry | CCLEAN_2013_Dry |
CCLEAN_2013_Wet | CCLEAN_2013_Wet | CCLEAN_2013_Wet |
CCLEAN_2014_Dry | CCLEAN_2014_Dry | CCLEAN_2014_Dry |
CCLEAN_2014_Wet | CCLEAN_2014_Wet | CCLEAN_2014_Wet |
CCLEAN_2015 | CCLEAN_2015 | CCLEAN_2015 |
CCLEAN_2015_Dry | CCLEAN_2015_Dry | CCLEAN_2015_Dry |
CCLEAN_2015_Wet | CCLEAN_2015_Wet | CCLEAN_2015_Wet |
CCLEAN_2016_Dry | CCLEAN_2016_Dry | CCLEAN_2016_Dry |
CCLEAN_2016_Wet | CCLEAN_2016_Wet | CCLEAN_2016_Wet |
CCLEAN_2017_Dry | CCLEAN_2017_Dry | CCLEAN_2017_Dry |
CCLEAN_2017_Wet | CCLEAN_2017_Wet | CCLEAN_2017_Wet |
CCLEAN_2018_Dry | CCLEAN_2018_Dry | CCLEAN_2018_Dry |
CCLEAN_2018_Wet | CCLEAN_2018_Wet | CCLEAN_2018_Wet |
CCLEAN_2019_Dry | CCLEAN_2019_Dry | CCLEAN_2019_Dry |
CCLEAN_2019_Wet | CCLEAN_2019_Wet | CCLEAN_2019_Wet |
CCLEAN_2020_Dry | CCLEAN_2020_Dry | CCLEAN_2020_Dry |
CCLEAN_2020_Wet | CCLEAN_2020_Wet | CCLEAN_2020_Wet |
CCLEAN_2021_Dry | CCLEAN_2021_Dry | CCLEAN_2021_Dry |
CCLEAN_2021_Wet | CCLEAN_2021_Wet | CCLEAN_2021_Wet |
CCLEAN_2022_Dry | CCLEAN_2022_Dry | CCLEAN_2022_Dry |
CCLEAN_2022_Wet | CCLEAN_2022_Wet | CCLEAN_2022_Wet |
CCLEAN_2023_Dry | CCLEAN_2023_Dry | CCLEAN_2023_Dry |
CCLEAN_2023_Wet | CCLEAN_2023_Wet | CCLEAN_2023_Wet |
CCLEAN_2024_Wet | CCLEAN_2024_Wet | CCLEAN_2024_Wet |
CCMP | Camille Creek Monitoring Plan | Formerly the Implementation, Monitoring, and Adaptive Management Plan |
CCRS-REF | Central Coast Restoration Success Reference Sites | Central Coast Restoration Success Reference Sites |
CCRS-REST | Central Coast Restoration Success Restoration Site | Central Coast Restoration Success Restoration Sites |
CCSE_FLOW | CCSE Flow Monitoring | Instantaneous discharge measurements collected by the Central Coast Salmon Enhancement. Data collected under the umbrella of the CCWC_FLOW program. |
CCWG_MC_SAL | CCWG_Moro Cojo Salinity Transect | Monthly Water Quality sampling in Moro Cojo Slough between Hwy 1 and Castroville Blvd |
CCWG_MC_WQ_Grab | CCWG_Moro Cojo Slough Water Quality Grab Samples | Water Quality sampling in Moro Cojo Slough |
CCWG_MC_WQ_HWY1 | CCWG_Moro Cojo Slough Water Quality at Hwy 1 | Water Quality sampling in Moro Cojo Slough at Hwy 1 crossing |
CCWG_RipRAM | CCWG RipRAM Monitoring | CCWG RipRAM Monitoring |
CCWTWP_2005 | Calleguas Creek Watershed TMDL Monitoring Prg 2005 | Calleguas Creek Watershed TMDL Monitoring Prg 2005 |
CCWTWP_2006 | Calleguas Creek Watershed TMDL Monitoring Prg 2006 | Calleguas Creek Watershed TMDL Monitoring Prg 2006 |
CCWTWP_2007 | Calleguas Creek Watershed TMDL Monitoring Prg 2007 | Calleguas Creek Watershed TMDL Monitoring Prg 2007 |
CCWTWP_2008 | Calleguas Creek Watershed TMDL Monitoring Prg 2008 | Calleguas Creek Watershed TMDL Monitoring Prg 2008 |
CCWTWP_2009 | Calleguas Creek Watershed TMDL Monitoring Prg 2009 | Calleguas Creek Watershed TMDL Monitoring Prg 2009 |
CCWTWP_2010 | Calleguas Creek Watershed TMDL Monitoring Prg 2010 | Calleguas Creek Watershed TMDL Monitoring Prg 2010 |
CCWTWP_2011 | Calleguas Creek Watershed TMDL Monitoring Prg 2011 | Calleguas Creek Watershed TMDL Monitoring Prg 2011 |
CCWTWP_2012 | Calleguas Creek Watershed TMDL Monitoring Prg 2012 | Calleguas Creek Watershed TMDL Monitoring Prg 2012 |
CCWTWP_2013 | Calleguas Creek Watershed TMDL Monitoring Prg 2013 | Calleguas Creek Watershed TMDL Monitoring Prg 2013 |
CCWTWP_2014 | Calleguas Creek Watershed TMDL Monitoring Prg 2014 | Calleguas Creek Watershed TMDL Monitoring Prg 2014 |
CCWTWP_2015 | Calleguas Creek Watershed TMDL Monitoring Prg 2015 | Calleguas Creek Watershed TMDL Monitoring Prg 2015 |
CCWTWP_2016 | Calleguas Creek Watershed TMDL Monitoring Prg 2016 | Calleguas Creek Watershed TMDL Monitoring Prg 2016 |
CCWTWP_2017 | Calleguas Creek Watershed TMDL Monitoring Prg 2017 | Calleguas Creek Watershed TMDL Monitoring Prg 2017 |
CCWTWP_2018 | Calleguas Creek Watershed TMDL Monitoring Prg 2018 | Calleguas Creek Watershed TMDL Monitoring Prg 2018 |
CCWTWP_2019 | Calleguas Creek Watershed TMDL Monitoring Prg 2019 | Calleguas Creek Watershed TMDL Monitoring Prg 2019 |
CCWTWP_2020 | Calleguas Creek Watershed TMDL Monitoring Prg 2020 | Calleguas Creek Watershed TMDL Management Project for 2020-2021 |
CCWTWP_2021 | Calleguas Creek Watershed TMDL Monitoring Prg 2021 | Calleguas Creek Watershed TMDL Management Project for 2021-2022 |
CCWTWP_2022 | Calleguas Creek Watershed TMDL Monitoring Prg 2022 | Calleguas Creek Watershed TMDL Management Project for 2022-2023 |
CCWTWP_2023 | Calleguas Creek Watershed TMDL Monitoring Prg 2023 | Calleguas Creek Watershed TMDL Management Project for 2023-2024 |
CCWTWP_2024 | Calleguas Creek Watershed TMDL Monitoring Prg 2024 | Calleguas Creek Watershed TMDL Management Project for 2024-2025 |
Central_Coast_ASBS | ASBS Reg Ref Site Monitoring 2013 - AMS | AMS 2013 ASBS Regional Reference |
CFW_2017_BMI | Camp Far West FERC Relicensing | |
Chollas_BacteriaTMDL | Chollas Creek Bacteria TMDL | Chollas Creek Bacteria TMDL |
Chollas_MetalsTMDL | Chollas Creek Diazinon and Dissolved Metals TMDL | Chollas Creek Metals TMDL |
Chollas_SpecialStudy | Chollas Creek Jurisdictional Boundry SS | Chollas Creek Jurisdictional Boundary Special Study |
CitMon_MorroB | Citizen Monitoring - Morro Bay | Citizen Monitoring - Morro Bay |
CitMon_MorroB_2002 | Citizen Monitoring Morro Bay 2002 | Citizen Monitoring Morro Bay 2002 |
CitMon_MorroB_2003 | Citizen Monitoring Morro Bay 2003 | Citizen Monitoring Morro Bay 2003 |
CitMon_MorroB_2004 | Citizen Monitoring Morro Bay 2004 | Citizen Monitoring Morro Bay 2004 |
CitMon_MorroB_2005 | Citizen Monitoring Morro Bay 2005 | Citizen Monitoring Morro Bay 2005 |
CitMon_MorroB_2006 | Citizen Monitoring Morro Bay 2006 | Citizen Monitoring Morro Bay 2006 |
CitMon_MorroB_2007 | Citizen Monitoring Morro Bay 2007 | Citizen Monitoring Morro Bay 2007 |
CitMon_MorroB_2008 | Citizen Monitoring Morro Bay 2008 | Citizen Monitoring Morro Bay 2008 |
CitMon_MorroB_2009 | Citizen Monitoring Morro Bay 2009 | Citizen Monitoring Morro Bay 2009 |
CitMon_MorroB_2010 | Citizen Monitoring Morro Bay 2010 | Citizen Monitoring Morro Bay 2010 |
CitMon_MorroB_2011 | Citizen Monitoring Morro Bay 2011 | Citizen Monitoring Morro Bay 2011 |
CitMon_MorroB_2012 | Citizen Monitoring Morro Bay 2012 | Citizen Monitoring Morro Bay 2012 |
CitMon_MorroB_2013 | Citizen Monitoring Morro Bay 2013 | Citizen Monitoring Morro Bay 2013 |
CitMon_MorroB_2014 | Citizen Monitoring Morro Bay 2014 | Citizen Monitoring Morro Bay 2014 |
CitMon_MorroB_2015 | Citizen Monitoring Morro Bay 2015 | Citizen Monitoring Morro Bay 2015 |
CitMon_MorroB_2016 | MBNEP Monitoring Program 2016 | MB Watershed and Estuary Monitoring 2016 |
CitMon_MorroB_2017 | MBNEP Monitoring Program 2017 | MB Watershed and Estuary Monitoring 2017 |
CitMon_MorroB_2018 | MBNEP Monitoring Program 2018 | MB Watershed and Estuary Monitoring 2018 |
CitMon_MorroB_2019 | MBNEP Monitoring Program 2019 | MB Watershed and Estuary Monitoring 2019 |
CitMon_MorroB_2020 | MBNEP Monitoring Program 2020 | MB Watershed and Estuary Monitoring 2020 |
CitySD_BacteriaTMDL | City of San Diego Bacteria TMDL | City of San Diego Bacteria TMDL |
COMPTON_NPDES | City of Compton NPDES Program | City of Compton NPDES Monitoring |
Coronado_BeachWQSpecialStudy | Coronado Special Study Beach WQ Assessment | Coronado Special Study Beach Water Quality Assessment |
CoSD Non-Res Septic Study | CoSD Non-Residential Septic Study | Wet Weather Runoff Study from Non-Residential Parcels with Septic Systems |
CoSD SDR-098B 22-23 | CoSD SDR-098B Wet Weather MST Investigation 22-23 | Collection of FIB and HF183 at catch basin B in SDR-098 drainage area |
COSD_Selenium Study | COSD_Selenium Study | Collection of selenium results from multiple projects used for delisting assessmemnt from section 303(d) list |
CRC_AY09 | CRC, Order R5-2009-0809, Dec 31st 2009, AY09 | California Rice Commission Monitoring Under ILRP Order R5-2009-0809, December 31st 2009 Submittal, Annual Year 2009, Sampling Dates Apr-Sep 2009 |
CRC_AY10 | CRC, Order R5-2009-0809, Dec 31st 2010, AY10 | California Rice Commission Monitoring Under ILRP Order R5-2009-0809, December 31st 2010 Submittal, Annual Year 2010, Sampling Dates May-Aug 2010 |
CRC_AY11 | CRC, Order R5-2010-0805, Dec 31st 2011, AY11 | California Rice Commission Monitoring Under ILRP Order R5-2010-0805, December 31st 2011 Submittal, Annual Year 2011, Sampling Dates May-Aug 2011 |
CRC_AY12 | CRC, Order R5-2010-0805, Dec 31st 2012, AY12 | California Rice Commission Monitoring Under ILRP Order R5-2010-0805, December 31st 2012 Submittal, Annual Year 2012, Sampling Dates May-Sep 2012 |
CRC_AY13 | CRC, Order R5-2010-0805, Dec 31st 2013, AY13 | California Rice Commission Monitoring Under ILRP Order R5-2010-0805, December 31st 2013 Submittal, Annual Year 2013, Sampling Dates May-Aug 2013 |
CRC_AY14 | CRC, Order R5-2014-0032, Dec 31st 2014, AY14 | California Rice Commission Monitoring Under ILRP Order R5-2014-0032, December 31st 2014 Submittal, Annual Year 2014, Sampling Dates May- Aug 2014 |
CRC_AY15 | CRC, Order R5-2014-0032, Dec 31st 2015, AY15 | California Rice Commission Monitoring Under ILRP Order R5-2014-0032, December 31st 2015 Submittal, Annual Year 2015, Sampling Dates May- Aug 2015 |
CRC_AY16 | CRC, Order R5-2014-0032, Dec 31st 2016, AY16 | California Rice Commission Monitoring Under ILRP Order R5-2014-0032, December 31st 2016 Submittal, Annual Year 2016, Sampling Dates May- Aug 2016 |
CRC_AY17 | CRC, Order R5-2014-0032, Dec 31st 2017, AY17 | California Rice Commission Monitoring Under ILRP Order R5-2014-0032, December 31st 2017 Submittal, Annual Year 2017, Sampling Dates May- Aug 2017 |
CRC_Historical | CRC, Order R5-2003-0839, R5-2007-0835, 2003-2008 | California Rice Commission Monitoring Under ILRP Order R5-2003-0839, Order R5-2007-0835, Sampling Dates 2003-2008 |
Creekside_Park_Rst_CY2021 | Marsh Ck - Oakley Creekside Park Restoration | Bioassessment and WQ monitoring in Marsh Creek for Oakley Creekside Park Restoration Project |
Creekside_Park_Rst_CY2022 | Marsh Ck - Oakley Creekside Park Restoration 2022 | Bioassessment and WQ monitoring in Marsh Creek for Oakley Creekside Park Restoration Project 2022 |
Creekside_Park_Rst_CY2023 | Marsh Ck - Oakley Creekside Park Restoration 2023 | Bioassessment and WQ monitoring in Marsh Creek for Oakley Creekside Park Restoration Project 2023 |
CS_PEST_DS_2011-2012 | Cache Slough Pest Input for Delta Smelt 2011-12 | Weston, D. P.; Asbell, A. M.; Lesmeister, S. A.; Teh, S. J.; Lydy, M. J. Urban and Agricultural Pesticide Inputs to a Critical Habitat for the Threatened Delta Smelt (Hypomesus Transpacificus). Environmental Toxicology and Chemistry 2014, Vol. 33, No. 4, |
CS_PEST_TOX_2015-2016 | SFCWA CacheSlough Resistance ID PEST TOX 2015-16 | Weston, D. P.; Poynton, H. C.; Major, K; Wellborn, G. A.; Lydy, M. J.; Moschet, C.; Connon, R. E. Using Mutations for Pesticide Resistance to Identify the Cause of Toxicity in Environmental Samples. 2018; DOI: 10.1021/acs.est.7b05071. |
CSD_Purewater_NorthCity | City of San Diego Purewater Project North City | City of San Diego Purewater Project North City |
CSD_Regional_OM | San Diego Regional Ocean Monitoring | San Diego Regional Ocean Monitoring |
CSI_2018 | Cleanup and Site Investigation 2018 | Data collected for 2018 Cleanup and Site Investigation Projects |
CSLRCD_Ag_Monitor_2012 | Ag_WQ_Enhancement_Grant 2012 | AMBIENT_WQ_LOS_OSOS_VALLEY 2012 |
CSLRCD_Ag_Monitor_2013 | Ag_WQ_Enhancement_Grant 2013 | AMBIENT_WQ_LOS_OSOS_VALLEY 2013 |
CSLRCD_Ag_Monitor_2014 | Ag_WQ_Enhancement_Grant 2014 | AMBIENT_WQ_LOS_OSOS_VALLEY 2014 |
CSLRCD_Ag_Monitor_2015 | Ag_WQ_Enhancement_Grant 2015 | AMBIENT_WQ_LOS_OSOS_VALLEY 2015 |
CSRCS_2010 | City of Santee 2010 Rivers and Creeks Study | This study collected and analyzed water quality samples from 2010 in impaired water bodies with selenium impairment in order to assess whether their inclusion on the CWA 303(d) list is justified. |
CT_SD_FSI_Study | County of San Diego Flow Source Investigation | Flow source investigation (FSI) study to assess potential sources of flow to County of San Diego maintained MS4 outfalls. |
CTC_UTM_319 | Upper Truckee Marsh 319 Monitoring | Upper Truckee Marsh 319 Monitoring |
CVILC_SW_AY21_Q1 | CVILC, SW, R7-2020-0026, Apr 1st 2022, AY21, Q1 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2022 Annual Monitoring Report, Annual Year 2021, Quarter 1, Sampling Date March 2021 |
CVILC_SW_AY21_Q2 | CVILC, SW, R7-2020-0026, Apr 1st 2022, AY21, Q2 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2022 Annual Monitoring Report, Annual Year 2021, Quarter 2, Sampling Date May 2021 |
CVILC_SW_AY21_Q3 | CVILC, SW, R7-2020-0026, Apr 1st 2022, AY21, Q3 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2022 Annual Monitoring Report, Annual Year 2021, Quarter 3, Sampling Date August 2021 |
CVILC_SW_AY21_Q4 | CVILC, SW, R7-2020-0026, Apr 1st 2022, AY21, Q4 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2022 Annual Monitoring Report, Annual Year 2021, Quarter 4, Sampling Date October 2021 |
CVILC_SW_AY22_Q1 | CVILC, SW, R7-2020-0026, Apr 1st 2023, AY22, Q1 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2023 Annual Monitoring Report, Annual Year 2022, Quarter 1, Sampling Date March 2022 |
CVILC_SW_AY22_Q2 | CVILC, SW, R7-2020-0026, Apr 1st 2023, AY22, Q2 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2023 Annual Monitoring Report, Annual Year 2022, Quarter 2, Sampling Date May 2022 |
CVILC_SW_AY22_Q3 | CVILC, SW, R7-2020-0026, Apr 1st 2023, AY22, Q3 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2023 Annual Monitoring Report, Annual Year 2022, Quarter 3, Sampling Date August 2022 |
CVILC_SW_AY22_Q4 | CVILC, SW, R7-2020-0026, Apr 1st 2023, AY22, Q4 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2023 Annual Monitoring Report, Annual Year 2022, Quarter 4, Sampling Date October 2022 |
CVILC_SW_AY23_Q1 | CVILC, SW, R7-2020-0026, Apr 1st 2024, AY23, Q1 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2024 Annual Monitoring Report, Annual Year 2023, Quarter 1, Sampling Date March 2023 |
CVILC_SW_AY23_Q2 | CVILC, SW, R7-2020-0026, Apr 1st 2024, AY23, Q2 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2024 Annual Monitoring Report, Annual Year 2023, Quarter 2, Sampling Date May 2023 |
CVILC_SW_AY23_Q3 | CVILC, SW, R7-2020-0026, Apr 1st 2024, AY23, Q3 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2024 Annual Monitoring Report, Annual Year 2023, Quarter 3, Sampling Date August 2023 |
CVILC_SW_AY23_Q4 | CVILC, SW, R7-2020-0026, Apr 1st 2024, AY23, Q4 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2024 Annual Monitoring Report, Annual Year 2023, Quarter 4, Sampling Date October 2023 |
CVILC_SW_AY24_Q1 | CVILC, SW, R7-2020-0026, Apr 1st 2025, AY24, Q1 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2025 Annual Monitoring Report, Annual Year 2024, Quarter 1, Sampling Date March 2024 |
CVILC_SW_AY24_Q2 | CVILC, SW, R7-2020-0026, Apr 1st 2025, AY24, Q2 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2025 Annual Monitoring Report, Annual Year 2024, Quarter 2, Sampling Date May 2024 |
CVILC_SW_AY24_Q3 | CVILC, SW, R7-2020-0026, Apr 1st 2025, AY24, Q3 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2025 Annual Monitoring Report, Annual Year 2024, Quarter 3, Sampling Date August 2024 |
CVILC_SW_AY24_Q4 | CVILC, SW, R7-2020-0026, Apr 1st 2025, AY24, Q4 | Coachella Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2020-0026, April 1st 2025 Annual Monitoring Report, Annual Year 2024, Quarter 4, Sampling Date October 2024 |
CVILC_TI_AY22_Q4 | CVILC, TI, R7-2020-0026, Apr 1st 2023, AY22, Q4 | Coachella Valley Irrigated Lands Coalition tissue monitoring Under ILRP Order R7-2020-0026, April 1st 2023 Annual Monitoring Report, Annual Year 2022, Quarter 4, Sampling Date October 2022 |
CVILC_TI_AY23_Q4 | CVILC, TI, R7-2020-0026, Apr 1st 2024, AY23, Q4 | Coachella Valley Irrigated Lands Coalition tissue monitoring Under ILRP Order R7-2020-0026, April 1st 2024 Annual Monitoring Report, Annual Year 2023, Quarter 4, Sampling Date October 2023 |
CVILC_TI_AY24_Q4 | CVILC, TI, R7-2020-0026, Apr 1st 2025, AY24, Q4 | Coachella Valley Irrigated Lands Coalition tissue monitoring Under ILRP Order R7-2020-0026, April 1st 2025 Annual Monitoring Report, Annual Year 2024, Quarter 4, Sampling Date October 2024 |
CVSALTS_MUN_2012-2013 | CV-SALTS MUN Beneficial Use Project 2012-2013 | CV-SALTS Evaluation of Municipal and Domestic Supply (MUN) Beneficial Use in Agricultural Drains 2012-2013 |
CVSALTS_MUN_2014 | CV-SALTS MUN Beneficial Use Project 2014 | CV-SALTS Evaluation of Municipal and Domestic Supply (MUN) Beneficial Use in Agricultural Drains 2014 |
CVSALTS_MUN_2016 | CV-SALTS MUN Beneficial Use Project 2016 | CV-SALTS Evaluation of Municipal and Domestic Supply (MUN) Beneficial Use 2016 |
CWC_ALBA_2011 | Carneros Creek/ALBA 2011 | Carneros Creek/ALBA 2011 |
CWC_ALBA_2012 | Carneros Creek/ALBA 2012 | Carneros Creek/ALBA 2012 |
CWC_ALBA_2013 | Carneros Creek/ALBA 2013 | Carneros Creek/ALBA 2013 |
CWC_ALBA_2015 | Carneros Creek/ALBA 2015 | Carneros Creek/ALBA 2015 |
CWC_CAPFF_2011 | City of Capitola First Flush Program 2011 | City of Capitola First Flush Program 2011 |
CWC_CAPFF_2012 | City of Capitola First Flush Program 2012 | City of Capitola First Flush Program 2012 |
CWC_CAPFF_2013 | City of Capitola First Flush Program 2013 | City of Capitola First Flush Program 2013 |
CWC_CAPFF_2014 | City of Capitola First Flush Program 2014 | City of Capitola First Flush Program 2014 |
CWC_CAPFF_2015 | City of Capitola First Flush Program 2015 | City of Capitola First Flush Program 2015 |
CWC_CAPUW_2010 | City of Capitola Urban Watch Program 2010 | City of Capitola Urban Watch Program 2010 |
CWC_CAPUW_2011 | City of Capitola Urban Watch Program 2011 | City of Capitola Urban Watch Program 2011 |
CWC_CAPUW_2012 | City of Capitola Urban Watch Program 2012 | City of Capitola Urban Watch Program 2012 |
CWC_CAPUW_2013 | City of Capitola Urban Watch Program 2013 | City of Capitola Urban Watch Program 2013 |
CWC_CAPUW_2014 | City of Capitola Urban Watch Program 2014 | City of Capitola Urban Watch Program 2014 |
CWC_CAPUW_2015 | City of Capitola Urban Watch Program 2015 | City of Capitola Urban Watch Program 2015 |
CWC_L_and_L_ASBS_2012 | Livestock and Land ASBS Carmel River Monitoring | Livestock and Land ASBS Carmel River Monitoring |
CWC_SC_FF_2011 | City of Santa Cruz First Flush Program 2011 | City of Santa Cruz First Flush Program 2011 |
CWC_SC_FF_2012 | City of Santa Cruz First Flush Program 2012 | City of Santa Cruz First Flush Program 2012 |
CWC_SC_FF_2013 | City of Santa Cruz First Flush Program 2013 | City of Santa Cruz First Flush Program 2013 |
CWC_SC_FF_2014 | City of Santa Cruz First Flush Program 2014 | City of Santa Cruz First Flush Program 2014 |
CWC_SSD_2015 | Monterey Bay Regional Snapshot Day Event 2015 | Monterey Bay Regional Snapshot Day Event 2015 |
DFG_CritRiff_FLOW | DFG Critical Riffle Study Flow Monitoring | Instantaneous discharge measurements collected by California Department of Fish and Wildlife as part of a critical riffle study. Data shared with CCWC as part of CCWC_FLOW program. |
DIM_RB5 | Delta Island Monitoring Project RWQCB5 | Delta Island Monitoring Project Regional Water Quality Control Board Region 5 |
DOT_NPDES_MON_2014-2015 | CA Dept of Transit NPDES Monitoring 2014-2015 | Compliance with SWRCB Order No. 2012-0011-DWQ, California Department of Transportation Statewide NPDES Permit for the 2014-2015 storm season. |
DOT_NPDES_MON_2015-2016 | CA Dept of Transit NPDES Monitoring 2015-2016 | Compliance with SWRCB Order No. 2012-0011-DWQ, California Department of Transportation Statewide NPDES Permit for the 2015-2016 storm season. |
DOT_NPDES_MON_2016-2017 | CA Dept of Transit NPDES Monitoring 2016-2017 | Compliance with SWRCB Order No. 2012-0011-DWQ, California Department of Transportation Statewide NPDES Permit for the 2016-2017 storm season. |
DOT_NPDES_MON_2017-2018 | CA Dept of Transit NPDES Monitoring 2017-2018 | Compliance with SWRCB Order No. 2012-0011-DWQ, California Department of Transportation Statewide NPDES Permit for the 2017-2018 storm season. |
DOT_NPDES_MON_2018-2019 | DOT Statewide NPDES Permit, 2018-19 | NPDES Monitoring for the California Department of Transportation for the 2018-19 storm season |
DOT_NPDES_MON_2019-2020 | DOT Statewide NPDES Permit, 2019-20 | NPDES Monitoring for the California Department of Transportation for the 2019-20 storm season |
DOT_NPDES_MON_2022-2023 | DOT Statewide NPDES Permit, 2022-23 | NPDES Monitoring for the California Department of Transportation for the 2022-23 storm season |
DOT_NPDES_MON_2023-2024 | DOT Statewide NPDES Permit, 2023-24 | NPDES Monitoring for the California Department of Transportation for the 2023-24 storm season |
DPR_PGC_Study249-264-269_2008-2011 | DPR_PGC_Study249-264-269_2008-2011 | DPR Pleasant Grove Creek Apr 2008-June 2011.DPR Study 249. Monitoring Urban Pesticide Runoff in California 2008-2009; DPR Study 264: Urban pesticide monitoring in north California Oct2009-May2010; DPR Study 269.Characterization Of Sacramento, California A |
DPR_PGC_Study269_2011-2014 | DPR_PGC_Study269_2011-2014 | DPR Pleasant Grove Creek Aug 2011-June 2014.DPR Study 269. Further Characterization Of Sacramento, California Area Urban Neighborhoods. |
DPR_PGC_Study269_2014-2015 | DPR_PGC_Study269_2014-2015 | DPR Pleasant Grove Creek Aug 2014-June 2015.DPR Study 269. Further Characterization Of Sacramento, California Area Urban Neighborhoods FY2014-2015 |
DPR_PGC_Study299_2015-2016 | DPR_PGC_Study299_2015-2016 | DPR Pleasant Grove Creek Aug 2015-June 2016.DPR Study 299. Ambient and Mitigation Monitoring in Urban Areas in Northern California. FY 2015/2016. |
DPR_PGC_Study299_2016-2017 | DPR_PGC_Study299_2016-2017 | DPR Pleasant Grove Creek Aug 2016-June 2017.DPR Study 299. Ambient and Mitigation Monitoring in Urban Areas in Northern California. FY 2016/2017. |
EDTU_CRWQMP_2015 | EDTU Cosumnes River WQ Monitoring Program 2015 | El Dorado Trout Unlimited Cosumnes River Water Quality Monitoring Program 2015 |
EDTU_CRWQMP_2016 | EDTU Cosumnes River WQ Monitoring Program 2016 | El Dorado Trout Unlimited Cosumnes River Water Quality Monitoring Program 2016 |
EID_Project184_2016 | EID Project 184 2016 | El Dorado Irrigation District (EID) Project 184 2016 sampling |
EID_Project184_2017 | EID Project 184 2017 | El Dorado Irrigation District (EID) Project 184 2017 sampling |
EID_Project184_2022 | EID Project 184 2022 | El Dorado Irrigation District (EID) Project 184 2022 sampling |
EPA_DEP_CRAM_VAL_2014 | EPA 104b3 Depressional CRAM Validation | EPA 104b3 Depressional CRAM Validation 2014 |
ES_Special_Study | City of Escondido Dry Weather Special Study 2016 | City of Escondido Dry Weather Special Study 2016 |
ESAM_2012 | Eastern Sierra Ambient Monitoring Project 2012 | Eastern Sierra Ambient Monitoring Project 2012 |
ESAM_2013 | Eastern Sierra Ambient Monitoring Project 2013 | Eastern Sierra Ambient Monitoring Project 2013 |
ESAM_2014 | Eastern Sierra Aquatic Monitoring Program - 2014 | Monitoring program to describe concentrations of fecal indicator bacteria in streams |
ESAM_2015 | Eastern Sierra Aquatic Monitoring Program - 2015 | Monitoring program to describe concentrations of fecal indicator bacteria in streams |
ESJ_AY09 | ESJ, Order R5-2008-0005, Mar 1st 2010, AY09 | East San Joaquin Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2010 Submittal, Annual Year 2009, Sampling Dates Oct08-Dec09 |
ESJ_AY10 | ESJ, Order R5-2008-0005, Mar 1st 2011, AY10 | East San Joaquin Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2011 Submittal, Annual Year 2010, Sampling Dates Jan-Dec 2010 |
ESJ_AY11 | ESJ, Order R5-2008-0005, Mar 1st 2012, AY11 | East San Joaquin Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2012 Submittal, Annual Year 2011, Sampling Dates Jan-Dec 2011 |
ESJ_AY12 | ESJ, Order R5-2008-0005, Mar 1st 2013, AY12 | East San Joaquin Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2013 Submittal, Annual Year 2012, Sampling Dates Jan-Dec 2012 |
ESJ_Historical | ESJ, Order R5-2003-0105, R5-2005-0833, 2004-2008 | East San Joaquin Water Quality Coalition Monitoring Under ILRP Order R5-2003-0826, R5-2006-0053, Sampling Dates Jul04-Sep08 |
ESJ_WY13_Q2 | ESJ, Order R5-2012-0116, Mar 1st 2014, WY13, Q2 | East San Joaquin Water Quality Coalition Monitoring Under ILRP Order R5-2012-0116, September 1st 2013 Submittal, Water Year 2013, Quarter 2, Sampling Dates Jan-Mar 2013 |
ESJ_WY13_Q3 | ESJ, Order R5-2012-0116, Mar 1st 2014, WY13, Q3 | East San Joaquin Water Quality Coalition Monitoring Under ILRP Order R5-2012-0116, December 1st 2013 Submittal, Water Year 2013, Quarter 3, Sampling Dates Apr-Jun 2013 |
ESJ_WY13_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2014, WY13, Q4 | East San Joaquin Water Quality Coalition Monitoring Under ILRP Order R5-2012-0116, March 1st 2014 Submittal, Water Year 2013, Quarter 4, Sampling Dates Jul-Sep 2013 |
ESJ_WY14_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2014, WY14, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2014 Submittal, Water Year 2014, Quarter 1, Sampling Dates Oct-Dec 2013 |
ESJ_WY14_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2014, WY14, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2014 Submittal, Water Year 2014, Quarter 2, Sampling Dates Jan-Mar 2014 |
ESJ_WY14_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2014, WY14, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2014 Submittal, Water Year 2014, Quarter 3, Sampling Dates Apr- Jun 2014 |
ESJ_WY14_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2015, WY14, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2015 Submittal, Water Year 2014, Quarter 4, Sampling Dates Jul-Sep 2014 |
ESJ_WY15_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2015, WY15, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2015 Submittal, Water Year 2014, Quarter 1, Sampling Dates Oct-Dec 2014 |
ESJ_WY15_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2015, WY15, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2015 Submittal, Water Year 2015, Quarter 2, Sampling Dates Jan-Mar 2015 |
ESJ_WY15_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2015, WY15, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2015 Submittal, Water Year 2015, Quarter 3, Sampling Dates Apr- Jun 2015 |
ESJ_WY15_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2016, WY15, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2016 Submittal, Water Year 2015, Quarter 4, Sampling Dates Jul-Sep 2015 |
ESJ_WY16_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2016, WY16, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2016 Submittal, Water Year 2016, Quarter 1, Sampling Dates Oct-Dec 2015 |
ESJ_WY16_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2016, WY16, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2016 Submittal, Water Year 2016, Quarter 2, Sampling Dates Jan-Mar 2016 |
ESJ_WY16_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2016, WY16, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2016 Submittal, Water Year 2016, Quarter 3, Sampling Dates Apr-Jun 2016 |
ESJ_WY16_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2017, WY16, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2017 Submittal, Water Year 2016, Quarter 4, Sampling Dates Jul-Sep 2016 |
ESJ_WY17_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2017, WY17, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2017 Submittal, Water Year 2017, Quarter 1, Sampling Dates Oct-Dec 2016 |
ESJ_WY17_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2017, WY17, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2017 Submittal, Water Year 2017, Quarter 2, Sampling Dates Jan-Mar 2017 |
ESJ_WY17_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2017, WY17, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2017 Submittal, Water Year 2017, Quarter 3, Sampling Dates Apr-Jun 2017 |
ESJ_WY17_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2018, WY17, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2018 Submittal, Water Year 2017, Quarter 4, Sampling Dates Jul-Sep 2017 |
ESJ_WY18_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2018, WY18, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2018 Submittal, Water Year 2018, Quarter 1, Sampling Dates Oct-Dec 2017 |
ESJ_WY18_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2018, WY18, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2018 Submittal, Water Year 2018, Quarter 2, Sampling Dates Jan-Mar 2018 |
ESJ_WY18_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2018, WY18, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2018 Submittal, Water Year 2018, Quarter 3, Sampling Dates Apr-Jun 2018 |
ESJ_WY18_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2019, WY18, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2019 Submittal, Water Year 2018, Quarter 4, Sampling Dates Jul-Sep 2018 |
ESJ_WY19_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2019, WY19, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2019 Submittal, Water Year 2019, Quarter 1, Sampling Dates Oct-Dec 2018 |
ESJ_WY19_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2019, WY19, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2019 Submittal, Water Year 2019, Quarter 2, Sampling Dates Jan-Mar 2019 |
ESJ_WY19_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2019, WY19, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2019 Submittal, Water Year 2019, Quarter 3, Sampling Dates Apr-Jun 2019 |
ESJ_WY19_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2020, WY19, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2020 Submittal, Water Year 2019, Quarter 4, Sampling Dates Jul-Sep 2019 |
ESJ_WY20_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2020, WY20, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2020 Submittal, Water Year 2020, Quarter 1, Sampling Dates Oct-Dec 2019 |
ESJ_WY20_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2020, WY20, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2020 Submittal, Water Year 2020, Quarter 2, Sampling Dates Jan-Mar 2020 |
ESJ_WY20_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2020, WY20, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2020 Submittal, Water Year 2020, Quarter 3, Sampling Dates Apr-Jun 2020 |
ESJ_WY20_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2021, WY20, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2021 Submittal, Water Year 2020, Quarter 4, Sampling Dates Jul-Sep 2020 |
ESJ_WY21_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2021, WY21, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2021 Submittal, Water Year 2021, Quarter 1, Sampling Dates Oct-Dec 2020 |
ESJ_WY21_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2021, WY21, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2021 Submittal, Water Year 2021, Quarter 2, Sampling Dates Jan-Mar 2021 |
ESJ_WY21_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2021, WY21, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2021 Submittal, Water Year 2021, Quarter 3, Sampling Dates Apr-Jun 2021 |
ESJ_WY21_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2022, WY21, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2022 Submittal, Water Year 2021, Quarter 4, Sampling Dates Jul-Sep 2021 |
ESJ_WY22_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2022, WY22, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2022 Submittal, Water Year 2022, Quarter 1, Sampling Dates Oct-Dec 2021 |
ESJ_WY22_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2022, WY22, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2022 Submittal, Water Year 2022, Quarter 2, Sampling Dates Jan-Mar 2022 |
ESJ_WY22_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2022, WY22, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2022 Submittal, Water Year 2022, Quarter 3, Sampling Dates Apr-Jun 2022 |
ESJ_WY22_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2023, WY22, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2023 Submittal, Water Year 2022, Quarter 4, Sampling Dates Jul-Sep 2022 |
ESJ_WY23_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2023, WY23, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2023 Submittal, Water Year 2023, Quarter 1, Sampling Dates Oct-Dec 2022 |
ESJ_WY23_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2023, WY23, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2023 Submittal, Water Year 2023, Quarter 2, Sampling Dates Jan-Mar 2023 |
ESJ_WY23_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2023, WY23, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2023 Submittal, Water Year 2023, Quarter 3, Sampling Dates Apr-Jun 2023 |
ESJ_WY23_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2024, WY23, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2024 Submittal, Water Year 2023, Quarter 4, Sampling Dates Jul-Sep 2023 |
ESJ_WY24_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2024, WY24, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2024 Submittal, Water Year 2024, Quarter 1, Sampling Dates Oct-Dec 2023 |
ESJ_WY24_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2024, WY24, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2024 Submittal, Water Year 2024, Quarter 2, Sampling Dates Jan-Mar 2024 |
ESJ_WY24_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2024, WY24, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2024 Submittal, Water Year 2024, Quarter 3, Sampling Dates Apr-Jun 2024 |
ESJ_WY24_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2025, WY24, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2025 Submittal, Water Year 2024, Quarter 4, Sampling Dates Jul-Sep 2024 |
ESJ_WY25_Q1 | ESJ, Order R5-2012-0116, Jun 1st 2025, WY25, Q1 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, June 1st 2025 Submittal, Water Year 2025, Quarter 1, Sampling Dates Oct-Dec 2024 |
ESJ_WY25_Q2 | ESJ, Order R5-2012-0116, Sep 1st 2025, WY25, Q2 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, September 1st 2025 Submittal, Water Year 2025, Quarter 2, Sampling Dates Jan-Mar 2025 |
ESJ_WY25_Q3 | ESJ, Order R5-2012-0116, Dec 1st 2025, WY25, Q3 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, December 1st 2025 Submittal, Water Year 2025, Quarter 3, Sampling Dates Apr-Jun 2025 |
ESJ_WY25_Q4 | ESJ, Order R5-2012-0116, Mar 1st 2026, WY25, Q4 | East San Joaquin Water Quality Coalition monitoring Under ILRP Order R5-2012-0116, March 1st 2026 Submittal, Water Year 2025, Quarter 4, Sampling Dates Jul-Sep 2025 |
ESJWQC_BactSourceStudy | ESJWQC Special Study - Bacteria Sourcing | East San Joaquin Water Quality Coalition Special Study - Bacteria Sourcing |
ESNERR_VMP | ESNERR Volunteer Monitoring Program | Volunteer Monthly Water Quality Program |
ESNERR_Vol | ESNERR_Vol | ESNERR_Vol |
Eucalyptus_Hills_MST_Study | Eucalyptus Hills Septic Contribution Study | Microbial source tracking (MST) study to assess potential sources of human fecal pollution, including onsite wastewater treatment systems (septics), in the Eucalyptus Hills area. |
Famosa_Slough_Eutro_Mon | Famosa Slough Eutrophication Monitoring Alt TMDL | Water quality monitoring conducted in accordance with the approved total maximum daily load (TMDL) alternative for eutrophication in Famosa Slough |
FCMST_2018_2019 | 2018/2019 Forester Creek MS4 Investigation | 2018/2019 Forester Creek MS4 Investigation |
Fish_Tissue_Lake Clementine_2015 | Lake Clementine Fish Tissue Sampling Data 2015 | Lake Clementine Fish Tissue Sampling Data 2015 |
Fish_Tissue_Lake Combie_2015-2016 | Lake Combie Fish Tissue Sampling Data 2015-2016 | Lake Combie Fish Tissue Sampling Data 2015-2016 |
Fish_Tissue_Rollins Reservoir_2014-2015 | Rollins Reservoir Fish Tissue Sampling Data 2014-2 | Rollins Reservoir Fish Tissue Sampling Data 2014-2 |
Fish_Tissue_Scotts Flat_2016-2018 | Scotts Flat Fish Tissue Sampling Data 2016-2018 | Scotts Flat Fish Tissue Sampling Data 2016-2018 |
Fish_Tissue_South Yuba River_2016 | South Yuba River Fish Tissue Sampling Data 2016 | South Yuba River Fish Tissue Sampling Data 2016 |
FreeVern_PEST_2012-2013 | SFCWA FreeportVernalis PEST 2012-2013 | Dissolved Pesticide Concentrations Entering the SacramentoSan Joaquin Delta from the Sacramento and San Joaquin Rivers, California, 201213, Data Series 876, U.S. Depart of the Interior, USGS, Prepared in cooperation with SLDMWA |
FRWM_LCC_BA_2013 | FRWM Last Chance Creek BA June 2013 | Feather River Watershed Monitoring Program Last Chance Creek Bioassessment June 2013 |
FRWM_RCC_BA_2012 | FRWM Red Clover Confluence BA June-July 2012 | Feather River Watershed Monitoring Program Red Clover Confluence Bioassessment June-July 2012 |
FSURMP_CSM_WY2017 | FSURMP Creek Status Monitoring in WY2017 | Fairfield Suisun Creek Status Monitoring in WY2017 |
FSURMP_CSM_WY2019 | FSURMP Creek Status Monitoring in WY2019 | Fairfield Suisun Creek Status Monitoring in WY2019 |
FW 2012 | Fireworks 2012 | Fireworks Annual Sampling 2012 |
FW 2013 | Fireworks 2013 | Fireworks Annual Sampling 2013 |
FW 2014 | Fireworks 2014 | Fireworks Annual Sampling 2014 |
FW 2015 | Fireworks 2015 | Fireworks Annual Sampling 2015 |
FW 2016 | Fireworks 2016 | Fireworks Annual Sampling 2016 |
FW 2017 | Fireworks 2017 | Fireworks Annual Sampling 2017 |
FW 2018 | Fireworks 2018 | Fireworks Annual Sampling 2018 |
FW 2019 | Fireworks 2019 | Fireworks Annual Sampling 2019 |
GBP_USBR_Jan14-Jun14 | GBP,GBP 5-01-234, Jan 1st 2015, Jan14-Jun14 | Grassland Bypass Project Data, January 1st 2015 Submittal, Semi Annual, Sample Dates Jan14-Jun14 |
GBP_USBR_Jan15-Jun15 | GBP,GBP 5-01-234, Jan 1st 2016, Jan15-Jun15 | Grassland Bypass Project Data, January 1st 2016 Submittal, Semi Annual, Sample Dates Jan15-Jun15 |
GBP_USBR_Jan19-Jun19 | GBP, R5-2015-0094, Oct 30th 2019, Jan19-Jun19 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, October 30th 2019 Submittal, Semi Annual, Sample Dates Jan19-Jun19 |
GBP_USBR_Jan20-Jun20 | GBP, R5-2015-0094, Oct 30th 2020, Jan20-Jun20 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, October 30th 2020 Submittal, Semi Annual, Sample Dates Jan20-Jun20 |
GBP_USBR_Jan21-Jun21 | GBP, R5-2015-0094, Oct 30th 2021, Jan21-Jun21 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, October 30th 2021 Submittal, Semi Annual, Sample Dates Jan21-Jun21 |
GBP_USBR_Jan22-Jun22 | GBP, R5-2015-0094, Oct 30th 2022, Jan22-Jun22 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, October 30th 2022 Submittal, Semi Annual, Sample Dates Jan22-Jun22 |
GBP_USBR_Jan23-Jun23 | GBP, R5-2015-0094, Oct 30th 2023, Jan23-Jun23 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, October 30th 2023 Submittal, Semi Annual, Sample Dates Jan23-Jun23 |
GBP_USBR_Jan24-Jun24 | GBP, R5-2015-0094, Oct 30th 2024, Jan24-Jun24 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, October 30th 2024 Submittal, Semi Annual, Sample Dates Jan24-Jun24 |
GBP_USBR_Jul13-Dec13 | GBP,GBP 5-01-234, Jun 30th 2014, Jul13-Dec13 | Grassland Bypass Project Data, June 30th 2014 Submittal, Semi Annual, Sample Dates Jul13-Dec13 |
GBP_USBR_Jul14-Dec14 | GBP,GBP 5-01-234, Jun 30th 2015, Jul14-Dec14 | Grassland Bypass Project Data, June 30th 2015 Submittal, Semi Annual, Sample Dates Jul14-Dec14 |
GBP_USBR_Jul15-Dec15 | GBP, Order R5-2015-0094, Apr 30th 2016, Jul15-Dec1 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, April 30th 2016 Submittal, Semi Annual, Sample Dates Jul15-Dec15 |
GBP_USBR_Jul18-Dec18 | GBP, R5-2015-0094, Apr 30th 2019, Jul18-Dec18 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, April 30th 2019 Submittal, Semi Annual, Sample Dates Jul18-Dec18 |
GBP_USBR_Jul19-Dec19 | GBP, R5-2015-0094, Apr 30th 2020, Jul19-Dec19 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, April 30th 2020 Submittal, Semi Annual, Sample Dates Jul19-Dec19 |
GBP_USBR_Jul20-Dec20 | GBP, R5-2015-0094, Apr 30th 2021, Jul20-Dec20 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, April 30th 2021 Submittal, Semi Annual, Sample Dates Jul20-Dec20 |
GBP_USBR_Jul21-Dec21 | GBP, R5-2015-0094, Apr 30th 2022, Jul21-Dec21 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, April 30th 2022 Submittal, Semi Annual, Sample Dates Jul21-Dec21 |
GBP_USBR_Jul22-Dec22 | GBP, R5-2015-0094, Apr 30th 2023, Jul22-Dec22 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, April 30th 2023 Submittal, Semi Annual, Sample Dates Jul22-Dec22 |
GBP_USBR_Jul23-Dec23 | GBP, R5-2015-0094, Apr 30th 2024, Jul23-Dec23 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, April 30th 2024 Submittal, Semi Annual, Sample Dates Jul23-Dec23 |
GBP_USBR_Jul24-Dec24 | GBP, R5-2015-0094, Apr 30th 2025, Jul24-Dec24 | Grassland Bypass Project Monitoring Under ILRP Order R5-2015-0094, April 30th 2025 Submittal, Semi Annual, Sample Dates Jul24-Dec24 |
GLC_AY07 | GLC, Order 06-0053, Dec 1st 2007, AY07 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, December 31st 2007 Submittal, Annual Year 2007, Sampling Dates May-Jul 2007 |
GLC_AY08 | GLC, Order 06-0053, Dec 1st 2008, AY08 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, December 31st 2008 Submittal, Annual Year 2008, Sampling Dates Apr-Jul 2008 |
GLC_AY09_Q2 | GLC, Order 06-0053, Sep 1st 2009, AY09, Q2 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, September 1st 2009 Submittal, Annual Year 2009, Quarter 2, Sampling Dates Apr-Jun 2009 |
GLC_AY09_Q3 | GLC, Order 06-0053, Dec 1st 2009, AY09, Q3 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, December 1st 2009 Submittal, Annual Year 2009, Quarter 3, Sampling Dates Jul 2009 |
GLC_AY10_Q2 | GLC, Order 06-0053, Sep 1st 2010, AY10, Q2 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, September 1st 2010 Submittal, Annual Year 2010, Quarter 2, Sampling Dates Apr-Jun 2010 |
GLC_AY10_Q3 | GLC, Order 06-0053, Dec 1st 2010, AY10, Q3 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, December 1st 2010 Submittal, Annual Year 2010, Quarter 3, Sampling Dates Jul 2010 |
GLC_AY11_Q2 | GLC, Order 06-0053, Sep 1st 2011, AY11, Q2 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, September 1st 2011 Submittal, Annual Year 2011, Quarter 2, Sampling Dates Apr-Jun 2011 |
GLC_AY11_Q3 | GLC, Order 06-0053, Dec 1st 2011, AY11, Q3 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, December 1st 2011 Submittal, Annual Year 2011, Quarter 3, Sampling Dates Jul-Aug 2011 |
GLC_AY11_Q4 | GLC, Order 06-0053, Mar 1st 2012, AY11, Q4 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, March 1st 2012 Submittal, Annual Year 2011, Quarter 4, Sampling Dates Oct 2011 |
GLC_AY12 | GLC, Order 06-0053, Mar 1st 2013, AY12 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, March 1st 2013 Submittal, Annual Year 2012, Sampling Date Jul 2012 |
GLC_Historical | GLC, Order R5-2006-0053, 2007-2009 | Goose Lake Coalition Monitoring Under ILRP Order R5-2006-0053, Sampling Dates May 2007-Jul 2009 |
GoldKingMine_PhaseI_2016 | Gold King Mine Release Sampling Phase I - 2016 | Gold King Mine Release Sampling Phase I - 2016 |
HeavenlyValley_TMDL_2001 | HeavenlyValley_TMDL_2001 | Total Maximum Daily Load Heavenly Valley 2001 |
HeavenlyValley_TMDL_2002 | HeavenlyValley_TMDL_2002 | Total Maximum Daily Load Heavenly Valley 2002 |
HeavenlyValley_TMDL_2003 | HeavenlyValley_TMDL_2003 | Total Maximum Daily Load Heavenly Valley 2003 |
HeavenlyValley_TMDL_2006 | HeavenlyValley_TMDL_2006 | Total Maximum Daily Load Heavenly Valley 2006 |
HeavenlyValley_TMDL_2007 | HeavenlyValley_TMDL_2007 | Total Maximum Daily Load Heavenly Valley 2007 |
HeavenlyValley_TMDL_2010 | HeavenlyValley_TMDL_2010 | Total Maximum Daily Load Heavenly Valley 2010 |
HeavenlyValley_TMDL_2011 | HeavenlyValley_TMDL_2011 | Total Maximum Daily Load Heavenly Valley 2011 |
HeavenlyValley_TMDL_2012 | HeavenlyValley_TMDL_2012 | Total Maximum Daily Load Heavenly Valley 2012 |
HeavenlyValley_TMDL_2013 | HeavenlyValley_TMDL_2013 | Total Maximum Daily Load Heavenly Valley 2013 |
HeavenlyValley_TMDL_2014 | HeavenlyValley_TMDL_2014 | Total Maximum Daily Load Heavenly Valley 2014 |
HeavenlyValley_TMDL_2015 | HeavenlyValley_TMDL_2015 | Total Maximum Daily Load Heavenly Valley 2015 |
HeavenlyValley_TMDL_2016 | HeavenlyValley_TMDL_2016 | Total Maximum Daily Load Heavenly Valley 2016 |
HeavenlyValley_TMDL_2017 | HeavenlyValley_TMDL_2017 | Total Maximum Daily Load Heavenly Valley 2017 |
HeavenlyValley_TMDL_2018 | HeavenlyValley_TMDL_2018 | Total Maximum Daily Load Heavenly Valley 2018 |
HeavenlyValley_TMDL_2019 | HeavenlyValley_TMDL_2019 | Total Maximum Daily Load Heavenly Valley 2019 |
HeavenlyValley_TMDL_2020 | HeavenlyValley_TMDL_2020 | Total Maximum Daily Load Heavenly Valley 2020 |
HeavenlyValley_TMDL_2021 | HeavenlyValley_TMDL_2021 | Total Maximum Daily Load Heavenly Valley 2021 |
HeavenlyValley_TMDL_2022 | HeavenlyValley_TMDL_2022 | Total Maximum Daily Load Heavenly Valley 2022 |
HeavenlyValley_TMDL_2023 | HeavenlyValley_TMDL_2023 | Total Maximum Daily Load Heavenly Valley 2023 |
HeavenlyValley_TMDL_2024 | HeavenlyValley_TMDL_2024 | Total Maximum Daily Load Heavenly Valley 2024 |
HF183_Outfall_Screening | HF183 Outfall Screening | Screening of outfalls for HF183 |
HF183_Outfall_Screening_SDG_LP | HF183 Outfall Screening in SDG and LP WMAs (DW) | Dry weather screening for HF183 in major outfalls in the unincorporated County of San Diego jurisdictional area of San Dieguito River and Los Penasquitos Watershed Management Areas (WMAs). |
Hist FW 2008-2011 | Historical Fireworks Data 2008-2011 | Historical Fireworks Data 2008-2011 |
Hodges_SI | Lake Hodges Source Investigation | Lake Hodges Source Investigation |
Hood_Exsitu | Hood Ex Situ 2018-2019 | Two-week exposure tests with Rainbow Trout and Hyalella azteca to evaluate water quality of Sacramento River at Hood, conducted four times during the study period. |
ICARE_BMI_Survey_1999 | ICARE BMI Survey 1999 | |
ICARE_BMI_Survey_2000 | ICARE BMI Survey 2000 | |
ICARE_BMI_Survey_2001 | ICARE BMI Survey 2001 | |
ICARE_BMI_Survey_2002 | ICARE BMI Survey 2002 | |
ICARE_BMI_Survey_2003 | ICARE BMI Survey 2003 | |
ICARE_BMI_Survey_2004 | ICARE BMI Survey 2004 | |
ICARE_BMI_Survey_2006 | ICARE BMI Survey 2006 | |
IVILC_SW_AY23_Q1 | IVILC, SW, R7-2021-0050, July 1st 2024, AY23, Q1 | Imperial Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2021-0050, July 1st 2024 Annual Monitoring Report, Annual Year 2023, Quarter 1, Sampling Date January 2023 |
IVILC_SW_AY23_Q2 | IVILC, SW, R7-2021-0050, July 1st 2024, AY23, Q2 | Imperial Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2021-0050, July 1st 2024 Annual Monitoring Report, Annual Year 2023, Quarter 2, Sampling Date April 2023 |
IVILC_SW_AY23_Q3 | IVILC, SW, R7-2021-0050, July 1st 2024, AY23, Q3 | Imperial Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2021-0050, July 1st 2024 Annual Monitoring Report, Annual Year 2023, Quarter 3, Sampling Date July 2023 |
IVILC_SW_AY23_Q4 | IVILC, SW, R7-2021-0050, July 1st 2024, AY23, Q4 | Imperial Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2021-0050, July 1st 2024 Annual Monitoring Report, Annual Year 2023, Quarter 4, Sampling Date October 2023 |
IVILC_SW_AY24_Q1 | IVILC, SW, R7-2021-0050, July 1st 2025, AY24, Q1 | Imperial Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2021-0050, July 1st 2025 Annual Monitoring Report, Annual Year 2024, Quarter 1, Sampling Date January 2024 |
IVILC_SW_AY24_Q2 | IVILC, SW, R7-2021-0050, July 1st 2025, AY24, Q2 | Imperial Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2021-0050, July 1st 2025 Annual Monitoring Report, Annual Year 2024, Quarter 2, Sampling Date April 2024 |
IVILC_SW_AY24_Q3 | IVILC, SW, R7-2021-0050, July 1st 2025, AY24, Q3 | Imperial Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2021-0050, July 1st 2025 Annual Monitoring Report, Annual Year 2024, Quarter 3, Sampling Date July 2024 |
IVILC_SW_AY24_Q4 | IVILC, SW, R7-2021-0050, July 1st 2025, AY24, Q4 | Imperial Valley Irrigated Lands Coalition surface water monitoring Under ILRP Order R7-2021-0050, July 1st 2025 Annual Monitoring Report, Annual Year 2024, Quarter 4, Sampling Date October 2024 |
IVILC_TI_AY24_Q4 | IVILC, TI, R7-2021-0050, July 1st 2025, AY24, Q4 | Imperial Valley Irrigated Lands Coalition tissue monitoring Under ILRP Order R7-2021-0050, July 1st 2025 Annual Monitoring Report, Annual Year 2024, Quarter 4, Sampling Date October 2024 |
KAW_AY14_Q1 | KAW, Order R5-2013-0120, Jun 1st 2014, AY14, Q1 | Kaweah Basin Water Quality Association Monitoring Under ILRP Order R5-2013-0120, June 1st 2014 Submittal, Annual Year 2014, Quarter 1, Sampling Dates Jan-Mar 2014 |
KAW_AY14_Q2 | KAW, Order R5-2013-0120, Sep 1st 2014, AY14, Q2 | Kaweah Basin Water Quality Association Monitoring Under ILRP Order R5-2013-0120, September 1st 2014 Submittal, Annual Year 2014, Quarter 2, Sampling Dates Apr-June 2014 |
KAW_AY14_Q3 | KAW, Order R5-2013-0120, Dec 1st 2014, AY14, Q3 | Kaweah Basin Water Quality Association Monitoring Under ILRP Order R5-2013-0120, December 1st 2014 Submittal, Annual Year 2014, Quarter 3, Sampling Dates July-Sept 2014 |
KAW_AY14_Q4 | KAW, Order R5-2013-0120, Mar 1st 2015, AY14, Q4 | Kaweah Basin Water Quality Association Monitoring Under ILRP Order R5-2013-0120, March 1st 2015 Submittal, Annual Year 2014, Quarter 4, Sampling Dates Oct-Dec 2014 |
KAW_AY15_Q1 | KAW, Order R5-2013-0120, Jun 1st 2015, AY15, Q1 | Kaweah Basin Water Quality Association Monitoring Under ILRP Order R5-2013-0120, June 1st 2015 Submittal, Annual Year 2015, Quarter 1, Sampling Dates Jan-Mar 2015 |
KAW_AY15_Q2 | KAW, Order R5-2013-0120, Sep 1st 2015, AY15, Q2 | Kaweah Basin Water Quality Association Monitoring Under ILRP Order R5-2013-0120, September 1st 2015 Submittal, Annual Year 2015, Quarter 2, Sampling Dates Apr-Jun 2015 |
KAW_AY15_Q3 | KAW, Order R5-2013-0120, Dec 1st 2015, AY15, Q3 | Kaweah Basin Water Quality Association Monitoring Under ILRP Order R5-2013-0120, December 1st 2015 Submittal, Annual Year 2015, Quarter 3, Sampling Dates Jul-Sep 2015 |
KAW_AY15_Q4 | KAW, Order R5-2013-0120, Mar1st 2016, AY15, Q4 | Kaweah Basin Water Quality Association Monitoring Under ILRP Order R5-2013-0120, March 1st 2016 Submittal, Annual Year 2015, Quarter 4, Sampling Dates Oct-Dec 2015 |
KAW_AY16_Q1 | KAW, Order R5-2013-0120, Jun 1st 2016, AY16, Q1 | Kaweah Basin Water Quality Association Monitoring Under ILRP Order R5-2013-0120, June 1st 2016 Submittal, Annual Year 2016, Quarter 1, Sampling Dates Jan-Mar 2016 |
KAW_AY16_Q2 | KAW, Order R5-2013-0120, Sep 1st 2016, AY16, Q2 | Kaweah Basin Water Quality Association Monitoring Under ILRP Order R5-2013-0120, September 1st 2016 Submittal, Annual Year 2016, Quarter 2, Sampling Dates Apr-Jun 2016 |
KER_AY14_Q1 | KER, Order R5-2013-0120, Jun 1st 2014, AY14, Q1 | Kern River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2014 Submittal, Annual Year 2014, Quarter 1, Sampling Dates Jan-Mar 2014 |
KER_AY14_Q2 | KER, Order R5-2013-0120, Sep 1st 2014, AY14, Q2 | Kern River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2014 Submittal, Annual Year 2014, Quarter 2, Sampling Dates Apr-June 2014 |
KER_AY14_Q3 | KER, Order R5-2013-0120, Dec 1st 2014, AY14, Q3 | Kern River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2014 Submittal, Annual Year 2014, Quarter 3, Sampling Dates July-Sept 2014 |
KER_AY15_Q1 | KER, Order R5-2013-0120, Jun 1st 2015, AY15, Q1 | Kern River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2015 Submittal, Annual Year 2015, Quarter 1, Sampling Dates Jan-Mar 2015 |
KER_AY15_Q2 | KER, Order R5-2013-0120, Sep 1st 2015, AY15, Q2 | Kern River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2015 Submittal, Annual Year 2015, Quarter 2, Sampling Dates Apr-Jun 2015 |
KER_AY15_Q3 | KER, Order R5-2013-0120, Dec 1st 2015, AY15, Q3 | Kern River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2015 Submittal, Annual Year 2015, Quarter 3, Sampling Dates Jul-Sep 2015 |
KER_AY15_Q4 | KER, Order R5-2013-0120, Mar 1st 2015, AY14, Q4 | Kern River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2015 Submittal, Annual Year 2014, Quarter 4, Sampling Dates Oct-Dec 2014 |
KER_AY16_Q1 | KER, Order R5-2013-0120, Jun 1st 2016, AY16, Q1 | Kern River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2016 Submittal, Annual Year 2016, Quarter 1, Sampling Dates Jan-Mar 2016 |
KER_AY16_Q2 | KER, Order R5-2013-0120, Sep 1st 2016, AY16, Q2 | Kern River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2016 Submittal, Annual Year 2016, Quarter 2, Sampling Dates Apr-Jun 2016 |
KER_AY16_Q4 | KER, Order R5-2013-0120, Mar 1st 2016, AY15, Q4 | Kern River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2016 Submittal, Annual Year 2015, Quarter 4, Sampling Dates Oct-Dec 2015 |
KIN_AY14_Q1 | KIN, Order R5-2013-0120, Jun 1st 2014, AY14, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2014 Submittal, Annual Year 2014, Quarter 1, Sampling Dates Jan-Mar 2014 |
KIN_AY14_Q2 | KIN, Order R5-2013-0120, Sep 1st 2014, AY14, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2014 Submittal, Annual Year 2014, Quarter 2, Sampling Dates Apr-June 2014 |
KIN_AY14_Q3 | KIN, Order R5-2013-0120, Dec 1st 2014, AY14, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2014 Submittal, Annual Year 2014, Quarter 3, Sampling Dates July-Sept 2014 |
KIN_AY14_Q4 | KIN, Order R5-2013-0120, Mar 1st 2015, AY14, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2015 Submittal, Annual Year 2014, Quarter 4, Sampling Dates Oct-Dec 2014 |
KIN_AY15_Q1 | KIN, Order R5-2013-0120, Jun 1st 2015, AY15, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2015 Submittal, Annual Year 2015, Quarter 1, Sampling Dates Jan-Mar 2015 |
KIN_AY15_Q2 | KIN, Order R5-2013-0120, Sep 1st 2015, AY15, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2015 Submittal, Annual Year 2015, Quarter 2, Sampling Dates Apr-Jun 2015 |
KIN_AY15_Q3 | KIN, Order R5-2013-0120, Dec 1st 2015, AY15, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2015 Submittal, Annual Year 2015, Quarter 3, Sampling Dates Jul-Sep 2015 |
KIN_AY15_Q4 | KIN, Order R5-2013-0120, Mar 1st 2016, AY15, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2016 Submittal, Annual Year 2015, Quarter 4, Sampling Dates Oct-Dec 2015 |
KIN_AY16_Q1 | KIN, Order R5-2013-0120, Jun 1st 2016, AY16, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2016 Submittal, Annual Year 2016, Quarter 1, Sampling Dates Jan-Mar 2016 |
KIN_AY16_Q2 | KIN, Order R5-2013-0120, Sep 1st 2016, AY16, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2016 Submittal, Annual Year 2016, Quarter 2, Sampling Dates Apr-Jun 2016 |
KIN_AY16_Q3 | KIN, Order R5-2013-0120, Dec 1st 2016, AY16, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2016 Submittal, Annual Year 2016, Quarter 3, Sampling Dates Jul-Sep 2016 |
KIN_AY16_Q4 | KIN, Order R5-2013-0120, Mar 1st 2017, AY16, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2017 Submittal, Annual Year 2016, Quarter 4, Sampling Dates Oct-Dec 2016 |
KIN_AY17_Q1 | KIN, Order R5-2013-0120, Jun 1st 2017, AY17, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2017 Submittal, Annual Year 2017, Quarter 1, Sampling Dates Jan-Mar 2017 |
KIN_AY17_Q2 | KIN, Order R5-2013-0120, Sep 1st 2017, AY17, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2017 Submittal, Annual Year 2017, Quarter 2, Sampling Dates Apr-Jun 2017 |
KIN_AY17_Q3 | KIN, Order R5-2013-0120, Dec 1st 2017, AY17, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2017 Submittal, Annual Year 2017, Quarter 3, Sampling Dates Jul-Sep 2017 |
KIN_AY17_Q4 | KIN, Order R5-2013-0120, Mar 1st 2018, AY17, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2018 Submittal, Annual Year 2016, Quarter 4, Sampling Dates Oct-Dec 2016 |
KIN_AY18_Q1 | KIN, Order R5-2013-0120, Jun 1st 2018, AY18, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2018 Submittal, Annual Year 2018, Quarter 1, Sampling Dates Jan-Mar 2018 |
KIN_AY18_Q2 | KIN, Order R5-2013-0120, Sep 1st 2018, AY18, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2018 Submittal, Annual Year 2018, Quarter 2, Sampling Dates Apr-Jun 2018 |
KIN_AY18_Q3 | KIN, Order R5-2013-0120, Dec 1st 2018, AY18, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2018 Submittal, Annual Year 2018, Quarter 3, Sampling Dates Jul-Sep 2018 |
KIN_AY18_Q4 | KIN, Order R5-2013-0120, Mar 1st 2019, AY18, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2019 Submittal, Annual Year 2018, Quarter 4, Sampling Dates Oct-Dec 2018 |
KIN_AY19_Q1 | KIN, Order R5-2013-0120, Jun 1st 2019, AY19, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2019 Submittal, Annual Year 2019, Quarter 1, Sampling Dates Jan-Mar 2019 |
KIN_AY19_Q2 | KIN, Order R5-2013-0120, Sep 1st 2019, AY19, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2019 Submittal, Annual Year 2019, Quarter 2, Sampling Dates Apr-Jun 2019 |
KIN_AY19_Q3 | KIN, Order R5-2013-0120, Dec 1st 2019, AY19, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2019 Submittal, Annual Year 2019, Quarter 3, Sampling Dates Jul-Sep 2019 |
KIN_AY19_Q4 | KIN, Order R5-2013-0120, Mar 1st 2020, AY19, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2020 Submittal, Annual Year 2019, Quarter 4, Sampling Dates Oct-Dec 2019 |
KIN_AY20_Q1 | KIN, Order R5-2013-0120, Jun 1st 2020, AY20, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2020 Submittal, Annual Year 2020, Quarter 1, Sampling Dates Jan-Mar 2020 |
KIN_AY20_Q2 | KIN, Order R5-2013-0120, Sep 1st 2020, AY20, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2020 Submittal, Annual Year 2020, Quarter 2, Sampling Dates Apr-Jun 2020 |
KIN_AY20_Q3 | KIN, Order R5-2013-0120, Dec 1st 2020, AY20, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2020 Submittal, Annual Year 2020, Quarter 3, Sampling Dates Jul-Sep 2020 |
KIN_AY20_Q4 | KIN, Order R5-2013-0120, Mar 1st 2021, AY20, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2021 Submittal, Annual Year 2020, Quarter 4, Sampling Dates Oct-Dec 2020 |
KIN_AY21_Q1 | KIN, Order R5-2013-0120, Jun 1st 2021, AY21, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2021 Submittal, Annual Year 2021, Quarter 1, Sampling Dates Jan-Mar 2021 |
KIN_AY21_Q2 | KIN, Order R5-2013-0120, Sep 1st 2021, AY21, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2021 Submittal, Annual Year 2021, Quarter 2, Sampling Dates Apr-Jun 2021 |
KIN_AY21_Q3 | KIN, Order R5-2013-0120, Dec 1st 2021, AY21, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2021 Submittal, Annual Year 2021, Quarter 3, Sampling Dates Jul-Sep 2021 |
KIN_AY21_Q4 | KIN, Order R5-2013-0120, Mar 1st 2022, AY21, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2022 Submittal, Annual Year 2021, Quarter 4, Sampling Dates Oct-Dec 2021 |
KIN_AY22_Q1 | KIN, Order R5-2013-0120, Jun 1st 2022, AY22, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2022 Submittal, Annual Year 2022, Quarter 1, Sampling Dates Jan-Mar 2022 |
KIN_AY22_Q2 | KIN, Order R5-2013-0120, Sep 1st 2022, AY22, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2022 Submittal, Annual Year 2022, Quarter 2, Sampling Dates Apr-Jun 2022 |
KIN_AY22_Q3 | KIN, Order R5-2013-0120, Dec 1st 2022, AY22, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2022 Submittal, Annual Year 2022, Quarter 3, Sampling Dates Jul-Sep 2022 |
KIN_AY22_Q4 | KIN, Order R5-2013-0120, Mar 1st 2023, AY22, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2023 Submittal, Annual Year 2022, Quarter 4, Sampling Dates Oct-Dec 2022 |
KIN_AY23_Q1 | KIN, Order R5-2013-0120, Jun 1st 2023, AY23, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2023 Submittal, Annual Year 2023, Quarter 1, Sampling Dates Jan-Mar 2023 |
KIN_AY23_Q2 | KIN, Order R5-2013-0120, Sep 1st 2023, AY23, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2023 Submittal, Annual Year 2023, Quarter 2, Sampling Dates Apr-Jun 2023 |
KIN_AY23_Q3 | KIN, Order R5-2013-0120, Dec 1st 2023, AY23, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2023 Submittal, Annual Year 2023, Quarter 3, Sampling Dates Jul-Sep 2023 |
KIN_AY23_Q4 | KIN, Order R5-2013-0120, Mar 1st 2024, AY23, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2024 Submittal, Annual Year 2023, Quarter 4, Sampling Dates Oct-Dec 2023 |
KIN_AY24_Q1 | KIN, Order R5-2013-0120, Jun 1st 2024, AY24, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2024 Submittal, Annual Year 2024, Quarter 1, Sampling Dates Jan-Mar 2024 |
KIN_AY24_Q2 | KIN, Order R5-2013-0120, Sep 1st 2024, AY24, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2024 Submittal, Annual Year 2024, Quarter 2, Sampling Dates Apr-Jun 2024 |
KIN_AY24_Q3 | KIN, Order R5-2013-0120, Dec 1st 2024, AY24, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2024 Submittal, Annual Year 2024, Quarter 3, Sampling Dates Jul-Sep 2024 |
KIN_AY24_Q4 | KIN, Order R5-2013-0120, Mar 1st 2025, AY24, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2025 Submittal, Annual Year 2024, Quarter 4, Sampling Dates Oct-Dec 2024 |
KIN_AY25_Q1 | KIN, Order R5-2013-0120, Jun 1st 2025, AY25, Q1 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, June 1st 2025 Submittal, Annual Year 2025, Quarter 1, Sampling Dates Jan-Mar 2025 |
KIN_AY25_Q2 | KIN, Order R5-2013-0120, Sep 1st 2025, AY25, Q2 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, September 1st 2025 Submittal, Annual Year 2025, Quarter 2, Sampling Dates Apr-Jun 2025 |
KIN_AY25_Q3 | KIN, Order R5-2013-0120, Dec 1st 2025, AY25, Q3 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, December 1st 2025 Submittal, Annual Year 2025, Quarter 3, Sampling Dates Jul-Sep 2025 |
KIN_AY25_Q4 | KIN, Order R5-2013-0120, Mar 1st 2026, AY25, Q4 | Kings River Watershed Coalition Authority Monitoring Under ILRP Order R5-2013-0120, March 1st 2026 Submittal, Annual Year 2025, Quarter 4, Sampling Dates Oct-Dec 2025 |
LA_MST_2017 | Loma Alta Creek MST Study 2017 | Loma Alta Creek MST Study 2017 |
LBE_IMP | Long Beach Estuary IMP | City of Long Beach Integrated Monitoring Program, Lower Long Beach Estuaries and Coastal San Pedro Bay Beaches |
LCC_CIMP | Los Cerritos Channel CIMP | Los Cerritos Channel Coordinated Integrated Monitoring Program |
Lenwood_2006-2007 | Lenwood_2006-2007 | The Influence of Physical Habitat, Pyrethroids and Metals on Benthic Community Condition in an Urban and Residential Stream in California |
LHI_RSW | Lehigh Receiving Water Monitoring | Lehigh Receiving Water Monitoring in Permanente Creek Watershed |
LLAR-CIMP | LLAR-CIMP | Lower Los Angeles River CIMP |
LOFLSA | Little Oso Flaco Lake Sediment Assessment | Little Oso Flaco Lake Sediment Assessment |
Los_Coches_MST_Study | Los Coches Sources of Human Fecal Contamination | Microbial source tracking (MST) study to assess potential sources of human fecal contamination in Los Coches Creek during wet weather. |
LosPen_BacteriaTMDL | Los Penasquitos Bacteria TMDL | Los Penasquitos Bacteria TMDL |
LP_Sediment_TMDL | Los Penasquitos Sediment TMDL | Los Penasquitos Sediment TMDL Monitoring |
LRR_BA_2018 | Lake Ranch Reservoir Bioassessment - 2018 | |
LSGR-WQM | Lower San Gabriel River Water Quality Monitoring | Lower San Gabriel River Water Quality Monitoring |
LTMLAS_16 | Water Quality Monitoring at Loma Alta Slough 2016 | Long-Term Water Quality Monitoring at Loma Alta Slough - in compliance with SD-RWQCB Order No. R9-2014-0020 (2016 Annual Monitoring Data) |
LTMLAS_17 | Water Quality Monitoring at Loma Alta Slough 2017 | Long-Term Water Quality Monitoring at Loma Alta Slough - in compliance with SD-RWQCB Order No. R9-2014-0020 (2017 Annual Monitoring Data) |
LTNSHH_2018 | Lake Tahoe Nearshore Human Health | |
LTNSHH_2019 | Lake Tahoe Nearshore Human Health 2019 | |
MapleviewGreenSt_PostConst_Monitoring | Mapleview Green St Post-Construction Monitoring | Post-construction Water Quality Monitoring of BMP effectiveness by WSP for the County of San Diego |
MBC_FIB_Bishop | Fecal indicator bacteria study in Bishop area | The project will focus on measuring E.Coli along Bishop Creek, Horton Creek and Lower Pine Creek. |
MBNMS_DR | MBNMS_Dry_Run | MBNMS_Dry_Run |
MBNMS_FF | MBNMS_First_Flush | MBNMS_First_Flush |
MBNMS_LP_CBI | MBNMS Lovers Point CBI | MBNMS Monitoring storm drians within Lovers Point watershed |
MBNMS_Prop84_AZBR | Azevedo Bioreactor | Water quality improvements through the bioreactor |
MBNMS_Prop84_OMBR | Oceanmist Bioreactor | Water quality improvements through the bioreactor |
MBNMS_Prop84_PGEW | PG&E Treatment Wetland | Water quality improvements through the wetland |
MBNMS_Prop84_SVTS | Spence Vegetated Treatment System | Water quality improvements through the VTS |
MBNMS_SF | MBNMS_Second_Flush | MBNMS_Second_Flush |
MBNMS_SpR | MBNMS_Spring_Run | MBNMS_Spring_Run |
MBNMS_SR | MBNMS_Summer_Run | MBNMS_Summer_Run |
MBNMS_SRCM | Santa Rita Creek Monitoring | Monitoring is to determine if restoration and on-farm practices are improving water qualityt in Santa Rita Creek |
MBNMS_SSD | MBNMS_Snapshot_Day | MBNMS_Snapshot_Day |
MC_303d/TMDL | MC_303d/TMDL Water Quality Monitoring Program | This project is the County of Montery's response to the SWRCBs Phase II Small MS4 General Permit monitoring requirments, and aims to analyzes & assesses impacts from its MS4 discharges on waters of the U.S. that have been identified as being impaired. |
Meiners Oaks BMP | VC Meiners Oaks Evaluating Low Impact Development | Receive and treat stormwater and non-stormwater runoff from three hundred (300) acres of impervious surface using a vegetated swale. |
MERID_Historical | MERID, Order R5-2003-0827, 2004-2008 | Merced Irrigation District Monitoring Under ILRP Order R5-2003-0827, Sampling Dates Jul 2004-Sep 2008 |
MOD_Historical | MOD, Order R5-2003-0827, R5-2006-0054, 2004-2009 | Modesto Irrigation District Monitoring Under ILRP Order R5-2003-0827, R5-2006-0054, Sampling Dates 2004-2009 |
MOD_SW_16-17 | Modesto Stormwater FY 2016-2017 | City of Modesto Stormwater Monitoring Project FY 2016-2017 |
MOD_SW_17-18 | Modesto Stormwater FY 2017-2018 | City of Modesto Stormwater Monitoring Project FY 2017-2018 |
MOD_SW_18-19 | Modesto Stormwater FY 2018-2019 | City of Modesto Stormwater Monitoring Project FY 2018-2019 |
MOD_SW_19-20 | Modesto Stormwater FY 2019-2020 | City of Modesto Stormwater Monitoring Project FY 2019-2020 |
MOD_SW_20-21 | Modesto Stormwater FY 2020-2021 | City of Modesto Stormwater Monitoring Project FY 2020-2021 |
MOD_SW_21-22 | Modesto Stormwater FY 2021-2022 | City of Modesto Stormwater Monitoring Project FY 2021-2022 |
MOD_SW_22-23 | Modesto Stormwater FY 2022-2023 | City of Modesto Stormwater Monitoring Project FY 2022-2023 |
MOD_SW_23-24 | Modesto Stormwater FY 2023-2024 | City of Modesto Stormwater Monitoring Project FY 2023-2024 |
Moonlight_BacteriaTMDL | Moonlight Beach Bacterial TMDL | Moonlight Beach Bacterial TMDL |
MS4_DW_OFSM | Dry Weather MS4 Outfall FS & DM | Dry Weather MS4 Outfall Field Screening and Discharge Monitoring |
MS4_DW_SMR_LR | Lower Santa Margarita Subwatershed DW Vis Obs | Lower Santa Margarita Subwatershed Dry Weather Visual Observations |
MS4_WW_LP_SED | Los Penasquitos Lagoon Sediment TMDL Monitoring | City of Del Mar Compliance Monitoring for sediment TMDL study |
MS4_WW_OFM | Wet Weather MS4 Outfall Monitoring | Wet Weather MS4 Monitoring. Grab sampling. May include field and/or analytical data for SW discharge. 2013 NPDES permit. |
MS4_WW_OFM_T | Transitional Wet Weather MS4 Outfall Monitoring | Transitional Wet Weather MS4 Outfall Monitoring |
Murphy_SI | Murphy Canyon Human Source Investigation | Murphy Canyon Human Source Investigation |
Murray_SI | Murray Canyon Human Source Investigation | Murray Canyon Human Source Investigation |
NCBED_RB5 | Nutrient-Biological Effects Sac-SJ Delta 2010 | Foe, C., A. Ballard,, and S. Fong,. 2010. Nutrient Concentrations and Biological Effects in the Sacramento-San Joaquin Delta, Regional Board report (CVRWQCB), 87 p. |
Not Applicable | No project code exists; used for LABQA samples | No project code exists; used for LABQA samples |
NPDES_BA | NPDES Bioassessment | Dry weather rapid stream bioassessment. Includes macroinvertebrate community structure, attached algae community metrics, physical habitat assessment, and riparian condition assessment. |
NPDES_MS4_PhaseII_RWB6 | NPDES_Municipal Stormwater PhaseII Permit_RWB6 | Monitoring and Reporting requirements associated with the NPDES Municipal Stormwater PhaseII Permit |
NPDES_RWM | NPDES Receiving Water Monitoring | Receiving water monitoring during 2 wet and 2 dry weather events per year at mass loading stations and temporary watershed assessment stations. Includes field data, chemistry, toxicity, and bacteria analyses and trash assessments. |
NR_WQMP | Newhall Ranch Water Quality Monitoring Program | Newhall Ranch Water Quality Monitoring Program for Specific Plan Conditoins of Approval and Clean Water Act Section 401 Water Quality Certification and Waste Discharge Requirements |
NSDCWMP Monthly Monitoring | NSDCWMP Monthly Monitoring | |
OC_LA_PATA | La Pata Avenue Extension Monitoring | Effectiveness monitoring for La Pata Avenue Extension Project |
OC_SDR_ACRWM | SDR Ambient Coastal Receiving Water Monitoring | |
OC_SDR_ALC | Aliso Creek TMDL | |
OC_SDR_Bioassessment | OCPW San Diego Region Bioassessment | |
OC_SDR_DPHTMDL | Dana Point Harbor TMDL | Dana Point Harbor TMDL |
OC_SDR_LTME | OC SDR Long Term Mass Emissions Monitoring | Long term mass emissions monitoring for OC WQIP |
OC_SDR_MS4_OUTFALL | OC SDR MS4 Outfall Monitoring | MS4 outfall monitoring for OC WQIP |
OC_SDR_NALS | SDR Non-stormwater Action Levels | |
OC_SDR_OCFS | OCPW SDR Outfall Capture Feasibility Study | OCPW SDR Outfall Capture Feasibility Study |
OC_SDR_PHR | OCPW SDR Pathogen Health Risk | OCPW SDR Pathogen Health Risk |
OC_SDR_SALM | SDR Stormwater Action Limits | |
OC_SDR_SCCSTMDL | San Clemente Coastal Streams TMDL | |
OC_SDR_SJCTMDL | San Juan Creek TMDL | San Juan Creek TMDL |
OC_SDR_UNIFIED | OC SDR Unified Beach Water Quality Monitoring | Beach water quality monitoring for OC WQIP |
OID_Historical | OID, Order R5-2003-0827, R5-2006-0054, 2004 -2008 | Oakdale Irrigation District Monitoring Under ILRP Order R5-2003-0827, R5-2006-0054, Sampling Dates 2004-2008 |
Otay_River_Bioassessment_2017 | Otay River Bioassessment Monitoring - 2017 | Otay River Bioassessment Monitoring - 2017 |
Otay_River_Bioassessment_2020 | Otay River Bioassessment Monitoring - 2020 | Otay River Bioassessment Monitoring - 2020 |
Otay_River_Bioassessment_2022 | Otay River Bioassessment Monitoring - 2022 | Otay River Bioassessment Monitoring - 2022 |
Otay_River_Bioassessment_2024 | Otay River Bioassessment Monitoring - 2024 | Otay River Bioassessment Monitoring - 2024 |
OxMountain_NPDES_2017 | Ox Mountain Sanitary Landfill NPDES Mon 2017 | NPDES bioassessment monitoring for Ox Mountain Sanitary Landfill conducted in 2017 |
OxMountain_NPDES_2023 | Ox Mountain Sanitary Landfill NPDES Mon 2023 | NPDES bioassessment monitoring for Ox Mountain Sanitary Landfill conducted in 2023 |
Palomar_2019 | Palomar Airport BMP 2018-2019 | 2018-2019 Monitoring for Long Term Effectiveness at the County of San Diego McClellan Palomar Airport Water Quality Treatment Facility |
Parking Lot BMP | VC Government Center Parking Lot Green Streets | Receive, store, treat, and infiltrate one hundred percent (100%) of the first flush stormwater and non-stormwater runoff from thirty-nine (39) acres of impervious surface using pervious gutters, infiltration basins, dry wells, and permeable pavement. |
PC_SLRP_2016 | Pleasants Creek Sediment Load Reduction Project 16 | Pleasants Creek Sediment Load Reduction Project Jan-March 2016 |
PGE_Project137_2020 | PGE Project 137 2020 | PGE Mokelumne River Project 137 sampling |
PGE_Project1962_2017 | PGE Project 1962 2017 | PGE Rock Creek-Cresta Project 1962 sampling |
PGE_Project1962_2018 | PGE Project 1962 2018 | PGE Rock Creek-Cresta Project 1962 sampling |
PGE_Project1962_2019 | PGE Project 1962 2019 | PGE Rock Creek-Cresta Project 1962 sampling |
PintoLake_TMDL | Pinto Lake TMDL | The Pinto Lake TMDL Plannin and Assessment Project |
PiruCreek_2018_BMI | South SWP FERC Relicensing | |
PL_Microcystins_Monitoring | PL_Microcystins_Monitoring | PL_Microcystins_Monitoring |
PL_Treatment_Monitoring | PL_Treatment_Monitoring | PL_Treatment_Monitoring |
PLOO | Point Loma Ocean Outfall Monitoring | Water Quality Monitoring of receiving waters by the City of San Diego Point Loma |
POSD_SwimWaters | Port of San Diego Swimmable Waters | San Diego Bay WQIP highest priority condition monitoring, NPDES Permit |
PRISM_UCD_ZALOM | PRISMGrantProjectUCD-Frank Zalom, Michael Johnson | Pesticide Reduction and Investigation of Source Mitigation (PRISM) project; Frank Zalom, Mike Johnson UCD |
Prop50_SJCDWQC | Proposition 50 Grant for SJCDWQC | Evaluation of specific management practices on field water quality. |
Prop50_UCD_SUTTER | Proposition 50 Grant for Sutter County | Monitoring was conducted by the University of California Davis Aquatic Ecosystems Analysis Laboratory at two sites in Sutter County. Monitoring was primarily for organophosphate pesticides. |
Prop50_VCWPD_SW_SACGRRP | Proposition 50 Grant for VCWPD Giant Reed Removal | Surface Water Monitoring for Arundo donax removal in San Antonio Creek watershed |
Prop84_CS_IISIC_PS | Installation of Infiltration Strips In Concrete-PS | Installation of Infiltration Strips In Concrete-Pilot Study; funded by Prop 84 |
Prop84_CURES_STS | Prop 84 CURES Sediment Transport Study 2013 | Proposition 84 Grant for the Coalition for Urban/Rural Environmental Stewardship Sediment Transport Study 2013 |
Prop84_CWE_MGS | Milton Green Street | Milton Green Street, Mountains Recreation and Conservation Authority |
Prop84_ORBMBEP | Prop84 LACFCD Oxford Ret Basin Multibenefit Enh Pr | Characterization at Oxford Retention Basin in Marina Del Rey Harbor Watershed |
Prop84_UniversityAve_LM | Prop84_UniversityAve_LaMesa | Prop 84 University Avenue Median Water Quality Improvement Project BMP Effectiveness Monitoring |
Prop84_Visalia_Greening_Post_2017 | Prop84 Greening Visalia Public Parking Post 2017 | Prop84 Greening Downtown Visalia Public Parking Post-Construction |
Prop84_Visalia_Greening_Pre_2015 | Prop84 Greening Visalia Public Parking Pre 2015 | Prop84 Greening Downtown Visalia Public Parking Pre-Construction |
PSSPM | Post-Storm Sediment Pyrethroid Monitoring | Monitoring for pyrethroid pesticides in sediments from each mass loading station and temporary watershed assessment station after the first wet weather event of the monitoring season. |
PWTRP_2019 | Pajaro Watershed Toxicity Reduction Project | Monitoring of a bioreactor with an installation of granulated activated carbon at the outflow in order to assess the reduction of toxicity associated with agricultural runoff in the Pajaro Watershed |
QMRA_TecoloteCreek | QMRA Tecolote Creek Study | QMRA Tecolote Creek Study |
QVIR_GWQM_2011-2012 | QVIR Ground Water Quality Monitoring 2011-2012 | Ongoing Ground Water Quality Monitoring in Quartz Valley |
QVIR_SRCM_2011-2012 | QVIR Scott River Continuous Monitoring 2011-2012 | QVIR Scott River Continuous Water Quality Monitoring 2011-2012 |
QVIR_SWQM_2011-2012 | OVIR Surface Water Quality Monitoring 2011-2012 | Ongoing Surface Water Quality Monitoring in Scott Valley |
QVIR_SWTM_2011-2012 | QVIR Surface Water Temperature Monitoring 2011-201 | Ongoing Temperature Water Quality Monitoring in Scott Valley |
R8-PradoDam-2017 | Reg8-Prado Dam SAR3 2017 | Region 8 Prado Dam Santa Ana River Reach 3 Compliance Monitoring 2017 |
R9-2017-0083 | Area of Investigation Under IO Number R9-2017-0083 | Area of Investigation Under IO Number R9-2017-0083 |
RBN_MST_COSD | MST Monitoring Rainbow Creek Subwatershed | MST Monitoring in Rainbow Creek Subwatershed |
RCD_FLOW | CSL and USLT RCD Flow Monitoring | Instantaneous discharge measurements collected by the Upper Salinas-Las Tablas or the Coastoal San Luis Resource Conservation District, or both. Data shared with the CCWC as part of CCWC_FLOW program. |
RCDMC_SR_IPCP | Salinas River Invasive Plant Control Program | Water quailty monitoring for NPDES compliance for RCDMC's Salinas River Invasive Plant Control Program |
RCN_MS4_COSD | MS4 Outfall Monitoring Rainbow Creek Subwatershed | MS4 monitoring in Rainbow Creek Subwatershed to provide data to address Permit Attachment E.3 compliance options of the Nutrient TMDL related to MS4 discharges. |
RCN_TMDL_COSD | Nutrient TMDL for Santa Margarita Watershed | Nutrient TMDL for Santa Margarita Watershed |
RMC_P&T_WY2018 | RMC Pesticide and Toxicity Monitoring in WY18 | RMC Pesticide and Toxicity Monitoring in WY18 |
RPP_AY09 | RPP, Resolution R5-2010-9001, Dec 31st 2009, AY09 | Rice Pesticide Program Monitoring Under Resolution R5-2010-9001, December 31st 2009 Submittal, Annual Year 2009, Sampling Dates Apr-Jun 2009 |
RPP_AY10 | RPP, Resolution R5-2010-9001, Dec 31st 2010, AY10 | Rice Pesticide Program Monitoring Under Resolution R5-2010-9001, December 31st 2010 Submittal, Annual Year 2010, Sampling Dates May-Aug 2010 |
RPP_AY11 | RPP, Resolution R5-2010-9001, Dec 31st 2011, AY11 | Rice Pesticide Program Monitoring Under Resolution R5-2010-9001, December 31st 2011 Submittal, Annual Year 2011, Sampling Dates May-Jul 2011 |
RPP_AY12 | RPP, Resolution R5-2010-9001, Dec 31st 2012, AY12 | Rice Pesticide Program Monitoring Under Resolution R5-2010-9001, December 31st 2012 Submittal, Annual Year 2012, Sampling Dates May-Jul 2012 |
RPP_AY13 | RPP, Resolution R5-2010-9001, Dec 31st 2013, AY13 | Rice Pesticide Program Monitoring Under Resolution R5-2010-9001, December 31st 2013 Submittal, Annual Year 2013, Sampling Dates May-Jul 2013 |
RPP_AY14 | RPP, Resolution R5-2010-9001, Dec 31st 2014, AY14 | Rice Pesticide Program Monitoring Under Resolution R5-2010-9001, December 31st 2014 Submittal, Annual Year 2014, Sampling Dates May-Jul 2014 |
RPP_AY15 | RPP, Resolution R5-2010-9001, Dec 31st 2015, AY15 | Rice Pesticide Program Monitoring Under Resolution R5-2010-9001, December 31st 2015 Submittal, Annual Year 2015, Sampling Dates May-Jul 2015 |
RPP_AY16 | RPP, Resolution R5-2010-9001, Dec 31st 2016, AY16 | Rice Pesticide Program Monitoring Under Resolution R5-2010-9001, December 31st 2016 Submittal, Annual Year 2016, Sampling Dates May-Jul 2016 |
RWB2_RiBay_Bacti_2011 | RWB2 Richardson Bay Bacteria TMDL Monitoring 2011 | 2011 Richardson Bay Bacteria TMDL Monitoring |
RWB2_RiBay_Bacti_2012 | RWB2 Richardson Bay Bacteria TMDL Monitoring 2012 | 2012 Richardson Bay Bacteria TMDL Monitoring |
RWB2_RiBay_Bacti_2013 | RWB2 Richardson Bay Bacteria TMDL Monitoring 2013 | 2013 Richardson Bay Bacteria TMDL Monitoring |
RWB2_RiBay_Bacti_2014 | RWB2 Richardson Bay Bacteria TMDL Monitoring 2014 | 2014 Richardson Bay Bacteria TMDL Monitoring |
RWB2_RiBay_Bacti_2015 | RWB2 Richardson Bay Bacteria TMDL Monitoring 2015 | 2015 Richardson Bay Bacteria TMDL Monitoring |
RWB2_RiBay_Bacti_2016 | RWB2 Richardson Bay Bacteria TMDL Monitoring 2016 | 2016 Richardson Bay Bacteria TMDL Monitoring |
RWB2_RiBay_Bacti_2017 | RWB2 Richardson Bay Bacteria TMDL Monitoring 2017 | 2017 Richardson Bay Bacteria TMDL Monitoring |
RWB2_Zone7_BA_2013 | RWB2 Zone 7 Bioassessment monitoring - 2013 | RWB2 Zone 7 Bioassessment monitoring - 2013 |
RWB3_CC | CCAMP Coastal Confluences | CCAMP Coastal Confluences |
RWB3_CC_2012_CWQ3 | CCAMP Coastal Confluences 2012 CWQ3 | CCAMP Coastal Confluences 2012 Conventional Water Quality Third Quarter July-Sept |
RWB3_CC_2012_CWQ4 | CCAMP Coastal Confluences 2012 CWQ4 | CCAMP Coastal Confluences 2012 Conventional Water Quality Fourth Quarter Oct-Dec |
RWB3_CC_2013_CWQ1 | CCAMP Coastal Confluences 2013 CWQ1 | CCAMP Coastal Confluences 2013 Conventional Water Quality First Quarter Jan -March |
RWB3_CC_2013_CWQ2 | CCAMP Coastal Confluences 2013 CWQ2 | CCAMP Coastal Confluences 2013 Conventional Water Quality Second Quarter April-June |
RWB3_CC_2013_CWQ3 | CCAMP Coastal Confluences 2013 CWQ3 | CCAMP Coastal Confluences 2013 Conventional Water Quality Third Quarter July-Sept |
RWB3_CC_2013_CWQ4 | CCAMP Coastal Confluences 2013 CWQ4 | CCAMP Coastal Confluences 2013 Conventional Water Quality Fourth Quarter Oct-Dec |
RWB3_CC_2014_CWQ1 | CCAMP Coastal Confluences 2014 CWQ1 | CCAMP Coastal Confluences 2014 Conventional Water Quality First Quarter Jan -March |
RWB3_CC_2014_CWQ2 | CCAMP Coastal Confluences 2014 CWQ2 | CCAMP Coastal Confluences 2014 Conventional Water Quality Second Quarter April-June |
RWB3_CC_2014_CWQ3 | CCAMP Coastal Confluences 2014 CWQ3 | CCAMP Coastal Confluences 2014 Conventional Water Quality Third Quarter July-Sept |
RWB3_CC_2014_CWQ4 | CCAMP Coastal Confluences 2014 CWQ4 | CCAMP Coastal Confluences 2014 Conventional Water Quality Fourth Quarter Oct-Dec |
RWB3_CC_2015 | CCAMP Coastal Confluences 2015 | CCAMP Coastal Confluences 2015 |
RWB3_CC_2015_CWQ1 | CCAMP Coastal Confluences 2015 CWQ1 | CCAMP Coastal Confluences 2015 Conventional Water Quality First Quarter Jan- March |
RWB3_CC_2015_CWQ2 | CCAMP Coastal Confluences 2015 CWQ2 | CCAMP Coastal Confluences 2015 Conventional Water Quality Second Quarter April-June |
RWB3_CC_2015_CWQ3 | CCAMP Coastal Confluences 2015 CWQ3 | CCAMP Coastal Confluences 2015 Conventional Water Quality Third Quarter July-Sept |
RWB3_CC_2015_CWQ4 | CCAMP Coastal Confluences 2015 CWQ4 | CCAMP Coastal Confluences 2015 Conventional Water Quality Fourth Quarter Oct-Dec |
RWB3_CC_2024 | CCAMP Coastal Confluence 2024 | CCAMP Coastal Confluence 2024 |
RWB3_CCAMP_RipRAM | CCAMP RipRAM Monitoring | CCAMP RipRAM Monitoring |
RWB3_ClearCreek_HG | RWB3 Clear Creek Hg TMDL | Clear Creek TMDL Planning and Assessment |
RWB3_CMP | RWB 3 Cooperative Monitoring Program | Regional Water Board 3 Cooperative Monitoring Program |
RWB3_CMP-BA | RWB 3 Cooperative Monitoring Program-BA | Regional Water Board 3 Cooperative Monitoring Program-BA temp |
RWB3_DO | CCAMP Dissolved Oxygen Study | CCAMP Dissolved Oxygen Study |
RWB3_Lakes_BGA | RWB3 - Lakes_Blue Gree Algae | RWB3 - Lakes_Blue Gree Algae |
RWB3_Pajaro | CCAMP Pajaro and Santa Cruz Area Rotation | CCAMP Pajaro and Santa Cruz Area Rotation |
RWB3_PajaroSedTMDL_2013 | RWB3 TMDL Pajaro Sed 2013 | RWB3 TMDL Pajaro Sed 2013 |
RWB3_Salinas | CCAMP Salinas Rotation | CCAMP Salinas Rotation Conventional Water Quality |
RWB3_Salinas_2012_CWQ3 | CCAMP Salinas Rotation 2012 CWQ3 | CCAMP Salinas Rotation 2012 Conventional Water Quality Third Quarter July-Sept |
RWB3_Salinas_2012_CWQ4 | CCAMP Salinas Rotation 2012 CWQ4 | CCAMP Salinas Rotation 2012 Conventional Water Quality Fourth Quarter Oct-Dec |
RWB3_Salinas_Storm | RWB3 Salinas Stormwater Project | Regional Water Board 3 Salinas Stormwater Project |
RWB3_Salinas_Storm_17-22 | Salinas Stormwater Program 2017-2022 | City of Salinas Stormwater Monitoring and Reporting Program under Order R3-2012-0005, Permit Term 2017 - 2022, Year 1, Phase II |
RWB3_SantaBarb | CCAMP Santa Barbara Rotation | CCAMP Santa Barbara Watershed Rotation Area |
RWB3_SantaBarb_2014_CWQ1 | CCAMP Santa Barbara 2014 CWQ1 | CCAMP Santa Barbara 2014 Conventional Water Quality First Quarter Jan -March |
RWB3_SantaBarb_2014_CWQ2 | CCAMP Santa Barbara 2014 CWQ2 | CCAMP Santa Barbara 2014 Conventional Water Quality Second Quarter April-June |
RWB3_SantaBarb_2014_CWQ3 | CCAMP Santa Barbara 2014 CWQ3 | CCAMP Santa Barbara 2014 Conventional Water Quality Third Quarter July-Sept |
RWB3_SantaLucia | CCAMP Santa Lucia Rotation | CCAMP Santa Lucia Watershed Rotation Area |
RWB3_SantaLucia_2015 | CCAMP Santa Lucia 2015 | CCAMP Santa Lucia Watershed Rotation Area 2015 |
RWB3_SantaLucia_2015_CWQ1 | CCAMP Santa Lucia 2015 CWQ1 | CCAMP Santa Lucia 2015 Conventional Water Quality First Quarter Jan-March |
RWB3_SantaLucia_2015_CWQ2 | CCAMP Santa Lucia 2015 CWQ2 | CCAMP Santa Lucia 2015 Conventional Water Quality Second Quarter April-June |
RWB3_SantaLucia_2015_CWQ3 | CCAMP Santa Lucia 2015 CWQ3 | CCAMP Santa Lucia 2015 Conventional Water Quality Third Quarter July-Sept |
RWB3_SantaLucia_2015_CWQ4 | CCAMP Santa Lucia 2015 CWQ4 | CCAMP Santa Lucia 2015 Conventional Water Quality Fourth Quarter Oct-Dec |
RWB3_SantaLucia_2024 | CCAMP Santa Lucia Rotation 2024 | CCAMP Santa Lucia Rotation 2024 |
RWB3_SantaMaria | CCAMP Santa Maria Rotation | CCAMP Santa Maria Watershed Rotation Area |
RWB3_SantaMaria_2013_CWQ1 | CCAMP Santa Maria Rotation 2013 CWQ1 | CCAMP Santa Maria Rotation 2013 Conventional Water Quality First Quarter Jan-March |
RWB3_SantaMaria_2013_CWQ2 | CCAMP Santa Maria Rotation 2013 CWQ2 | CCAMP Santa Maria Rotation 2013 Conventional Water Quality Second Quarter April-June |
RWB3_SantaMaria_2013_CWQ3 | CCAMP Santa Maria Rotation 2013 CWQ3 | CCAMP Santa Maria Rotation 2013 Conventional Water Quality Third Quarter July-Sept |
RWB3_SantaMaria_2013_CWQ4 | CCAMP Santa Maria Rotation 2013 CWQ4 | CCAMP Santa Maria Rotation 2013 Conventional Water Quality Fourth Quarter Oct-Dec |
RWB3_TMDL_2018 | RWB3 TMDL Salinas 2018 | RWB3 TMDL Salinas 2018 |
RWB6_BACT_Monitoring_2008 | RWB6 Lahontan Bacteria Sampling 2008 | RWB6 Lahontan Bacteria Sampling |
RWB6_BACT_Monitoring_2009 | RWB6 Lahontan Bacteria Sampling 2009 | RWB6 Lahontan Bacteria Sampling |
RWB6_BACT_Monitoring_2014 | RWB6 Lahontan Bacteria Sampling 2014 | RWB6 Lahontan Bacteria Sampling |
RWB6_BACT_Monitoring_2015 | RWB6 Lahontan Bacteria Sampling 2015 | RWB6 Lahontan Bacteria Sampling |
RWB6_BACT_Monitoring_2016 | RWB6 Lahontan Bacteria Sampling 2016 | RWB6 Lahontan Bacteria Sampling |
RWB6_Fish_Contract_2016_2019 | RWB6 Fish Tissue 2016-2019 | |
RWB6_SusRivHg_2016 | Susan River Mercury 2016 | Susan River Mercury 2016 |
RWB6_Trend_2017_Q2 | RWB6 Trend Monitoring CY2017 Q2 | Samples collected for Trend Monitoring Second Quarter Apr-June during the 2017 calendar year |
RWB6V_BishopCreek | RWB6V_Bishop Creek Enforcement | Samples collected from Bishop Creek to determine water quality impacts discharges to land and/or surface water |
RWB6V_Hudson Creek | RWB6V_Hudson Creek Enforcement | Samples collected from Hudson Creek to determine water quality impacts from construction or discharges to land and/or surface water |
RWB6V_LakeGregory | RWB6V_Lake Gregory Enforcement | Samples collected from Lake Gregory to determine water quality impacts from discharges to land and/or surface water |
RWB6V_LeeViining_2014 | RWB6V_Lee Vining Enforcement_September 2014 | Samples collected upstream and downstream from the project site to determine water quality impacts caused by construction and maintenance activities within and near surface water |
RWB7_TMDL_2011 | TMDL Imperial Valley Project | TMDL Imperial Valley Project |
RWB7_TMDL_2012 | RWB7 TMDL Augment CY2012 | RWB7 Fish Tissue TMDL & Trend Monitoring during the 2012 calendar year |
RWB7_TMDL_2015_2016 | TMDL Imperial Valley Project 2015-2016 | TMDL Imperial Valley Project 2015-2016 |
RWB9_Eelgrass_BA_2024 | Southern CA Eelgrass Bioassessment Pilot | Southern CA Eelgrass Bioassessment Pilot |
RWB9_SDLobster_2015 | RWB9 San Diego Lobster Study 2015 | RWB9 San Diego Lobster Study 2015 |
SanDieguito_BacteriaTMDL | San Dieguito Bacteria TMDL | San Dieguito Bacteria TMDL |
SanMarcos_Special_Study | San Marcos Dry Weather Special Study | Targeted Dry Weather MS4 Outfall Special Study Field Screening and Discharge Monitoring |
SAR RMP | Santa Ana River Regional Monitoring Program | Santa Ana River Regional Monitoring Program |
SAR_GM | Santa Ana River General Monitoring | Santa Ana Region General Monitoring |
SARDA_2018 | Santa Ana River Dischargers Association 2018 | 2018 collection and analysis of fish, fish tissue, macroinvertebrate, algae, and habitat data in support of SARDA's discharge permits. |
SARDA_2019 | Santa Ana River Dischargers Association 2019 | 2019 collection and analysis of fish, fish tissue, macroinvertebrate, algae, and habitat data in support of SARDA's discharge permits. |
SB_MST | MST in the Santa Barbara Region | Microbial Source Tracking in the Santa Barbara Region |
SBarbC_303D | SBarbC_ NPDES_303D_Monitoring | Required monitoring for City of Santa Barbara NPDES Permit, under 303d Monitoring |
SBCK_ST_CMW | Carpinteria Marsh Watershed Stream Team | |
SBCK_ST_GVW | Goleta Valley Watershed Stream Team | |
SBCK_ST_VRW | Ventura River Watershed Stream Team | |
SBCO_UrbanSWMonitor | Santa Barbara County MS4 permit Urban Stormwater M | |
SBOO | South Bay Ocean Outfall Monitoring | Water Quality Monitoring of receiving waters by the City of San Diego South Bay |
SCPD_PreDredge | SCPD Predredge Sediment Sampling | Santa Cruz Port District Predredge Sediment Sampling |
SCVURPPP_CSM_WY2017 | SCVURPPP Creek Status Monitoring in WY2017 | SCVURPPP Creek Status Monitoring in WY2017 |
SCVURPPP_CSM_WY2018 | SCVURPPP Creek Status Monitoring in WY2018 | SCVURPPP Creek Status Monitoring in WY2018 |
SCVURPPP_CSM_WY2019 | SCVURPPP Creek Status Monitoring in WY2019 | |
SCVURPPP_CSM_WY2020 | SCVURPPP Creek Status Monitoring in WY2020 | SCVURPPP Creek Status Monitoring in WY2020 |
SCVURPPP_CSM_WY2021 | SCVURPPP Creek Status Monitoring in WY2021 | SCVURPPP Creek Status Monitoring in WY2021 |
SCVURPPP_CSM_WY2022 | SCVURPPP Creek Status Monitoring in WY2022 | SCVURPPP Creek Status Monitoring in WY2022 |
SCVURPPP_LID | SCVURPPP Low Impact Development Monitoring | |
SCVURPPP_LID_WY2024 | SCVURPPP Low Impact Development Monitoring WY2024 | SCVURPPP Low Impact Development Monitoring WY2024 |
SCVURPPP_LID_WY2025 | SCVURPPP Low Impact Development Monitoring WY2025 | SCVURPPP Low Impact Development Monitoring WY2025 |
SCVURPPP_P&T_WY2017 | SCVURPPP Pesticides and Toxicity Monitoring WY2017 | SCVURPPP Pesticides and Toxicity Monitoring in WY2017 |
SCVURPPP_P&T_WY2018 | SCVURPPP Pesticides and Toxicity Monitoring WY2018 | SCVURPPP Pesticides and Toxicity Monitoring in WY2018 |
SCVURPPP_P&T_WY2019 | SCVURPPP Pesticides and Toxicity Monitoring in WY2 | |
SCVURPPP_P&T_WY2020 | SCVURPPP Pesticides and Toxicity Monitoring WY2020 | SCVURPPP Pesticides and Toxicity Monitoring WY2020 |
SCVURPPP_P&T_WY2021 | SCVURPPP Pesticides and Toxicity Monitoring WY2021 | SCVURPPP Pesticides and Toxicity Monitoring in WY2021 |
SCVURPPP_P&T_WY2022 | SCVURPPP Pesticides and Toxicity Monitoring WY2022 | SCVURPPP Pesticides and Toxicity Monitoring in WY2022 |
SCVURPPP_P&T_WY2023 | SCVURPPP Pesticides and Toxicity Monitoring WY2023 | SCVURPPP Pesticides and Toxicity Monitoring in WY2023 |
SCVURPPP_POC_WY2017 | SCVURPPP Pollutants of Concern Monitoring WY2017 | SCVURPPP Pollutants of Concern Monitoring in WY2017 |
SCVURPPP_POC_WY2018 | SCVURPPP Pollutants of Concern Monitoring WY2018 | SCVURPPP Pollutants of Concern Monitoring in WY2018 |
SCVURPPP_POC_WY2019 | SCVURPPP Pollutants of Concern Monitoring in WY201 | |
SCVURPPP_POC_WY2021 | SCVURPPP Pollutants of Concern Monitoring WY2021 | SCVURPPP Pollutants of Concern Monitoring in WY2021 |
SCVURPPP_POC_WY2023 | SCVURPPP Pollutants of Concern Monitoring WY2023 | SCVURPPP Pollutants of Concern Monitoring in WY2023 |
SCVURPPP_RWL | SCVURPPP Receiving Water Limitations | |
SCVURPPP_SSID_COY_TOX | SCVURPPP Stressor Source ID Monitoring Coyote Ck | SCVURPPP Stressor Source ID Monitoring in Coyote Creek |
SCVURPPP_SSID_LS_CSCI | Lower Silver Creek CSCI SSID Project | SCVURPPP Stressor Source ID project evaluating low CSCI Scores |
SCVURPPP_SSID_UPE_BA | Upper Penitencia Creek Stressor Source ID Project | Upper Penitencia Creek Stressor Source ID Project |
SCWQP_Alder_HgChar_PreDev | SCWQP Alder Ck Pre-Development Hg Characterization | Baseline monitoring prior to major land development project |
SDC_FC_DW_PH1_2017 | 2017 Forester Creek Phase I Monitoring | |
SDC_FC_DW_PH2_2017 | 2017 Forester Creek Phase II Monitoring | |
SDC_LosCoches_MST_DW | Los Coches Creek Dry Weather MST | Los Coches Creek Dry Weather MST |
SDC_LosCoches_MST_WW | Los Coches Creek Wet Weather MST | Los Coches Creek Wet Weather MST |
SDIA_WW | San Diego International Airport Wet Weather Mon. | Wet weather monitoring to assess progress towards Focused Priority Condition goals under the 2015 WQIP. Includes field and analytical data for stormwater discharge. Compliance with 2013 NPDES permit. |
SDR HF183 Outfall Screening | Dry Weather HF183 in the San Diego River WMA | Dry Weather HF183 Monitoring and Source Investigation in the San Diego River WMA |
SDR_Green_Infrastructure | Green Infrastructure Pre-Construction Monitoring | Water quality monitoring to characterize wet weather runoff in the San Diego River watershed prior to installation of green infrastructure components. |
SDR_WMA_RW_Optional | SDR WMA Receiving Water Optional Monitoring | San Diego River (SDR) Watershed Management Area (WMA) optional receiving water monitoring upstream and downstream of MS4 outfalls on the San Diego River |
SDRMST_2018 | 2018 SDR MS4 Investigation | 2018 San Diego River MS4 Investigation |
SDRPF_DO_CHEM_WQ | SDRPF Dissolved Oxygen Project | SDRPF Dissolved Oxygen Project |
SDRPF_RW_WQ | RiverWatch Water Quality Monitoring | Monthly water quality assessments of various sections of the San Diego River |
SGRRMP-2009 | SGRRMP-2009 | |
SGRRMP-2010 | SGRRMP-2010 | |
SGRRMP-2011 | SGRRMP-2011 | |
SGRRMP-2012 | SGRRMP-2012 | |
SGRRMP-2013 | SGRRMP-2013 | |
SGRRMP-2014 | SGRRMP-2014 | |
SGRRMP-2015 | SGRRMP-2015 | |
SGRRMP-2016 | SGRRMP-2016 | |
SGRRMP-2017 | SGRRMP-2017 | |
SGRRMP-2018 | SGRRMP-2018 | |
Shasta Tailwater Reduction_2010 | Shasta Tailwater Reduction_2010 | Shasta Tailwater Reduction_2010 |
ShelterIsland_CuTMDL_MS4 | Shelter Island Copper TMDL | Shelter Island Copper TMDL |
SISP_TMDL | Shelter Island Shoreline Park TMDL | Shelter Island Shoreline Park TMDL |
Sites_Reservoir_BA_2023 | Sites Reservoir Bioassessment Monitoring - 2023 | |
Sites_Reservoir_BA_2024 | Sites Reservoir Bioassessment Monitoring - 2024 | |
SJC_AY09 | SJC, Order R5-2008-0005, Mar 1st 2010, AY09 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2010 Submittal, Annual Year 2009, Sampling Dates Oct08-Dec09 |
SJC_AY10 | SJC, Order R5-2008-0005, Mar 1st 2011, AY10 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2011 Submittal, Annual Year 2010, Sampling Dates Jan-Dec 2010 |
SJC_AY11 | SJC, Order R5-2008-0005, Mar 1st 2012, AY11 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2012 Submittal, Annual Year 2011, Sampling Dates Jan-Dec 2011 |
SJC_AY12 | SJC, Order R5-2008-0005, Mar 1st 2013, AY12 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2013 Submittal, Annual Year 2012, Sampling Dates Jan-Dec 2012 |
SJC_AY13 | SJC, Order R5-2008-0005, Mar 1st 2014, AY13 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2014 Submittal, Annual Year 2013, Sampling Dates Jan-Dec 2013 |
SJC_Historical | SJC, Order R5-2003-0105, R5-2005-0833, 2004-2008 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2003-0826, R5-2006-0053, Sampling Dates Aug04-Sep08 |
SJC_NNL_SW_WY19 | NNL, Nitrate Management Plan Monitoring WY 2019 | Norman's Nursery Linden Nitrate Management Plan Monitoring, Surface Water, Water Year 2019, Sampling Dates Oct 2018 - Sept 2019 |
SJC_NNL_SW_WY20 | NNL, Nitrate Management Plan Monitoring WY 2020 | Norman's Nursery Linden Nitrate Management Plan Monitoring, Surface Water, Water Year 2020, Sampling Dates Oct 2019 - Sept 2020 |
SJC_NNL_SW_WY21 | NNL, Nitrate Management Plan Monitoring WY 2021 | Norman's Nursery Linden Nitrate Management Plan Monitoring, Surface Water, Water Year 2021, Sampling Dates Oct 2020 - Sept 2021 |
SJC_NNL_SW_WY22 | NNL, Nitrate Management Plan Monitoring WY 2022 | Norman's Nursery Linden Nitrate Management Plan Monitoring, Surface Water, Water Year 2022, Sampling Dates Oct 2021 - Sept 2022 |
SJC_NNL_SW_WY23 | NNL, Nitrate Management Plan Monitoring WY 2023 | Norman's Nursery Linden Nitrate Management Plan Monitoring, Surface Water, Water Year 2023, Sampling Dates Oct 2022 - Sept 2023 |
SJC_WY14_Q2 | SJC, Order R5-2014-0029, Sep 1st 2014, WY14, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2014 Submittal, Water Year 2014, Quarter 2, Sampling Dates Jan-Mar 2014 |
SJC_WY14_Q3 | SJC, Order R5-2014-0029, Dec 1st 2014, WY14, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2014 Submittal, Water Year 2014, Quarter 3, Sampling Dates Apr-Jun 2014 |
SJC_WY14_Q4 | SJC, Order R5-2014-0029, Mar 1st 2015, WY14, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2015 Submittal, Water Year 2014, Quarter 4, Sampling Dates Jul-Sep 2014 |
SJC_WY15_Q1 | SJC, Order R5-2014-0029, Jun 1st 2015, WY15, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2015 Submittal, Water Year 2015, Quarter 1, Sampling Dates Oct-Dec 2014 |
SJC_WY15_Q2 | SJC, Order R5-2014-0029, Sep 1st 2015, WY14, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2015 Submittal, Water Year 2015, Quarter 2, Sampling Dates Jan-Mar 2015 |
SJC_WY15_Q3 | SJC, Order R5-2014-0029, Dec 1st 2015, WY14, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2015 Submittal, Water Year 2015, Quarter 3, Sampling Dates Apr-Jun 20145 |
SJC_WY15_Q4 | SJC, Order R5-2014-0029, Mar 1st 2016, WY14, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2016 Submittal, Water Year 2015, Quarter 4, Sampling Dates Jul-Sep 2015 |
SJC_WY16_Q1 | SJC, Order R5-2014-0029, Jun 1st 2016, WY16, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2016 Submittal, Water Year 2016, Quarter 1, Sampling Dates Oct Dec 2015 |
SJC_WY16_Q2 | SJC, Order R5-2014-0029, Sep 1st 2016, WY16, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2016 Submittal, Water Year 2016, Quarter 2, Sampling Dates Jan-Mar 2016 |
SJC_WY16_Q3 | SJC, Order R5-2014-0029, Dec 1st 2016, WY16, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2016 Submittal, Water Year 2016, Quarter 3, Sampling Dates Apr-Jun 2016 |
SJC_WY16_Q4 | SJC, Order R5-2014-0029, Mar 1st 2017, WY16, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2017 Submittal, Water Year 2016, Quarter 4, Sampling Dates Jul-Sep 2016 |
SJC_WY17_Q1 | SJC, Order R5-2014-0029, Jun 1st 2017, WY17, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2017 Submittal, Water Year 2017, Quarter 1, Sampling Dates Oct Dec 2016 |
SJC_WY17_Q2 | SJC, Order R5-2014-0029, Sept 1st 2017, WY17, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2017 Submittal, Water Year 2017, Quarter 2, Sampling Dates Jan-Mar 2017 |
SJC_WY17_Q3 | SJC, Order R5-2014-0029, Dec 1st 2017, WY17, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2017 Submittal, Water Year 2017, Quarter 3, Sampling Dates Apr-Jun 2017 |
SJC_WY17_Q4 | SJC, Order R5-2014-0029, Mar 1st 2018, WY17, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2018 Submittal, Water Year 2017, Quarter 4, Sampling Dates Jul-Sep 2017 |
SJC_WY18_Q1 | SJC, Order R5-2014-0029, Jun 1st 2018, WY18, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2018 Submittal, Water Year 2018, Quarter 1, Sampling Dates Oct- Dec 2017 |
SJC_WY18_Q2 | SJC, Order R5-2014-0029, Sep 1st 2018, WY18, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2018 Submittal, Water Year 2018, Quarter 2, Sampling Dates Jan-Mar 2018 |
SJC_WY18_Q3 | SJC, Order R5-2014-0029, Dec 1st 2018, WY18, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2018 Submittal, Water Year 2018, Quarter 3, Sampling Dates Apr-Jun 2018 |
SJC_WY18_Q4 | SJC, Order R5-2014-0029, Mar 1st 2019, WY18, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2019 Submittal, Water Year 2018, Quarter 4, Sampling Dates Jul-Sep 2018 |
SJC_WY19_Q1 | SJC, Order R5-2014-0029, Jun 1st 2019, WY19, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2019 Submittal, Water Year 2019, Quarter 1, Sampling Dates Oct- Dec 2018 |
SJC_WY19_Q2 | SJC, Order R5-2014-0029, Sep 1st 2019, WY19, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2019 Submittal, Water Year 2019, Quarter 2, Sampling Dates Jan-Mar 2019 |
SJC_WY19_Q3 | SJC, Order R5-2014-0029, Dec 1st 2019, WY19, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2019 Submittal, Water Year 2019, Quarter 3, Sampling Dates Apr-Jun 2019 |
SJC_WY19_Q4 | SJC, Order R5-2014-0029, Mar 1st 2020, WY19, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2020 Submittal, Water Year 2019, Quarter 4, Sampling Dates Jul-Sep 2019 |
SJC_WY20_Q1 | SJC, Order R5-2014-0029, Jun 1st 2020, WY20, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2020 Submittal, Water Year 2020, Quarter 1, Sampling Dates Oct- Dec 2019 |
SJC_WY20_Q2 | SJC, Order R5-2014-0029, Sep 1st 2020, WY20, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2020 Submittal, Water Year 2020, Quarter 2, Sampling Dates Jan-Mar 2020 |
SJC_WY20_Q3 | SJC, Order R5-2014-0029, Dec 1st 2020, WY20, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2020 Submittal, Water Year 2020, Quarter 3, Sampling Dates Apr-Jun 2020 |
SJC_WY20_Q4 | SJC, Order R5-2014-0029, Mar 1st 2021, WY20, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2021 Submittal, Water Year 2020, Quarter 4, Sampling Dates Jul-Sep 2020 |
SJC_WY21_Q1 | SJC, Order R5-2014-0029, Jun 1st 2021, WY21, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2021 Submittal, Water Year 2021, Quarter 1, Sampling Dates Oct- Dec 2020 |
SJC_WY21_Q2 | SJC, Order R5-2014-0029, Sep 1st 2021, WY21, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2021 Submittal, Water Year 2021, Quarter 2, Sampling Dates Jan-Mar 2021 |
SJC_WY21_Q3 | SJC, Order R5-2014-0029, Dec 1st 2021, WY21, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2021 Submittal, Water Year 2021, Quarter 3, Sampling Dates Apr-Jun 2021 |
SJC_WY21_Q4 | SJC, Order R5-2014-0029, Mar 1st 2022, WY21, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2022 Submittal, Water Year 2021, Quarter 4, Sampling Dates Jul-Sep 2021 |
SJC_WY22_Q1 | SJC, Order R5-2014-0029, Jun 1st 2022, WY22, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2022 Submittal, Water Year 2022, Quarter 1, Sampling Dates Oct- Dec 2021 |
SJC_WY22_Q2 | SJC, Order R5-2014-0029, Sep 1st 2022, WY22, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2022 Submittal, Water Year 2022, Quarter 2, Sampling Dates Jan-Mar 2022 |
SJC_WY22_Q3 | SJC, Order R5-2014-0029, Dec 1st 2022, WY22, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2022 Submittal, Water Year 2022, Quarter 3, Sampling Dates Apr-Jun 2022 |
SJC_WY22_Q4 | SJC, Order R5-2014-0029, Mar 1st 2023, WY22, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2023 Submittal, Water Year 2022, Quarter 4, Sampling Dates Jul-Sep 2022 |
SJC_WY23_Q1 | SJC, Order R5-2014-0029, Jun 1st 2023, WY23, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2023 Submittal, Water Year 2023, Quarter 1, Sampling Dates Oct-Dec 2022 |
SJC_WY23_Q2 | SJC, Order R5-2014-0029, Sep 1st 2023, WY23, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2023 Submittal, Water Year 2023, Quarter 2, Sampling Dates Jan-Mar 2023 |
SJC_WY23_Q3 | SJC, Order R5-2014-0029, Dec 1st 2023, WY23, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2023 Submittal, Water Year 2023, Quarter 3, Sampling Dates Apr-Jun 2023 |
SJC_WY23_Q4 | SJC, Order R5-2014-0029, Mar 1st 2024, WY23, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2024 Submittal, Water Year 2023, Quarter 4, Sampling Dates Jul-Sep 2023 |
SJC_WY24_Q1 | SJC, Order R5-2014-0029, Jun 1st 2024, WY24, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2024 Submittal, Water Year 2024, Quarter 1, Sampling Dates Oct- Dec 2023 |
SJC_WY24_Q2 | SJC, Order R5-2014-0029, Sep 1st 2024, WY24, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2024 Submittal, Water Year 2024, Quarter 2, Sampling Dates Jan-Mar 2024 |
SJC_WY24_Q3 | SJC, Order R5-2014-0029, Dec 1st 2024, WY24, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2024 Submittal, Water Year 2024, Quarter 3, Sampling Dates Apr-Jun 2024 |
SJC_WY24_Q4 | SJC, Order R5-2014-0029, Mar 1st 2025, WY24, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2025 Submittal, Water Year 2024, Quarter 4, Sampling Dates Jul-Sep 2024 |
SJC_WY25_Q1 | SJC, Order R5-2014-0029, Jun 1st 2025, WY25, Q1 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2025 Submittal, Water Year 2025, Quarter 1, Sampling Dates Oct- Dec 2024 |
SJC_WY25_Q2 | SJC, Order R5-2014-0029, Sep 1st 2025, WY25, Q2 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2014-0029, September 1st 2025 Submittal, Water Year 2024, Quarter 2, Sampling Dates Jan-Mar 2025 |
SJC_WY25_Q3 | SJC, Order R5-2014-0029, Dec 1st 2025, WY25, Q3 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2014-0029, December 1st 2025 Submittal, Water Year 2025, Quarter 3, Sampling Dates Apr-Jun 2025 |
SJC_WY25_Q4 | SJC, Order R5-2014-0029, Mar 1st 2026, WY25, Q4 | San Joaquin County and Delta Water Quality Coalition Monitoring Under ILRP Order R5-2014-0029, March 1st 2026 Submittal, Water Year 2025, Quarter 4, Sampling Dates Jul-Sep 2025 |
SJCDWQC_BactSourceStudy | SJCDWQC Special Study - Bacteria Sourcing | San Joaquin County and Delta Water Quality Coalition Special Study - Bacteria Sourcing |
SLOCO_Mines | San Luis Obispo County Mines | Monitoring of Coastal San Luis Obispo County watersheds with mines (historic data) |
SLR HF183 Outfall Screening | Dry Weather HF183 in the San Luis Rey WMA | Dry Weather HF183 Monitoring and Source Investigation in the San Luis Rey WMA |
SLR_MST_PhaseI | SLRR Bacteria Source ID WW Monitoring - Phase I | San Luis Rey River Bacteria Source Identification Study Wet Weather Monitoring - Phase I |
SLRLR_WQIP_BactMon | San Luis Rey River Lower River WQIP Goals Bacteria | Bacteria monitoring to assess progress towards WQIP-based goals for bacteria in the Lower San Luis Rey River. |
SLRMST_2018 | 2018 SLR MS4 Investigation | 2018 San Luis Rey River MS4 Investigation |
SLRTMDL | San Lorenzo River TMDL | Mandated monitoring of coliforms, enterococcus bacteria and trace organic chemicals of potential human sources along San Lorenzo River and Branciforte and tributaries within Santa Cruz City Limits |
SMBBB_Shoreline | SMBBB Coordinated Shoreline Monitoring Program | Coordinated Integrated Monitoring Program (CIMP) for the Beach Cities Watershed Management Group |
SMC_SCCWRP | SMC Regional Watershed Monitoring SCCWRP | SMC Regional Watershed Monitoring SCCWRP |
SMCARM_2011 | San Mateo Creek Aquatic Resource Monitoring - 2011 | San Mateo Creek Aquatic Resource Monitoring - 2011 |
SMCARM_2012 | San Mateo Creek Aquatic Resource Monitoring - 2012 | San Mateo Creek Aquatic Resource Monitoring - 2012 |
SMCARM_2013 | San Mateo Creek Aquatic Resource Monitoring - 2013 | San Mateo Creek Aquatic Resource Monitoring - 2013 |
SMCARM_2014 | San Mateo Creek Aquatic Resource Monitoring - 2014 | San Mateo Creek Aquatic Resource Monitoring - 2014 |
SMCARM_2015 | San Mateo Creek Aquatic Resource Monitoring - 2015 | San Mateo Creek Aquatic Resource Monitoring - 2015 |
SMCARM_2016 | San Mateo Creek Aquatic Resource Monitoring - 2016 | San Mateo Creek Aquatic Resource Monitoring - 2016 |
SMCARM_2017 | San Mateo Creek Aquatic Resource Monitoring - 2017 | San Mateo Creek Aquatic Resource Monitoring - 2017 |
SMCARM_2018 | San Mateo Creek Aquatic Resource Monitoring - 2018 | San Mateo Creek Aquatic Resource Monitoring - 2018 |
SMCARM_2019 | San Mateo Creek Aquatic Resource Monitoring - 2019 | San Mateo Creek Aquatic Resource Monitoring - 2019 |
SMCARM_2020 | San Mateo Creek Aquatic Resource Monitoring - 2020 | San Mateo Creek Aquatic Resource Monitoring - 2020 |
SMCARM_2021 | San Mateo Creek Aquatic Resource Monitoring - 2021 | San Mateo Creek Aquatic Resource Monitoring - 2021 |
SMCARM_2022 | San Mateo Creek Aquatic Resource Monitoring - 2022 | San Mateo Creek Aquatic Resource Monitoring - 2022 |
SMCARM_2023 | San Mateo Creek Aquatic Resource Monitoring - 2023 | San Mateo Creek Aquatic Resource Monitoring - 2023 |
SMCRWM_2009 | SMC Regional Watershed Monitoring 2009 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2009 |
SMCRWM_2010 | SMC Regional Watershed Monitoring 2010 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2010 |
SMCRWM_2011 | SMC Regional Watershed Monitoring 2011 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2011 |
SMCRWM_2012 | SMC Regional Watershed Monitoring 2012 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2012 |
SMCRWM_2013 | SMC Regional Watershed Monitoring 2013 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2013 |
SMCRWM_2014 | SMC Regional Watershed Monitoring 2014 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2014 |
SMCRWM_2015 | SMC Regional Watershed Monitoring 2015 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2015 |
SMCRWM_2016 | SMC Regional Watershed Monitoring 2016 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2016 |
SMCRWM_2017 | SMC Regional Watershed Monitoring 2017 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2017 |
SMCRWM_2018 | SMC Regional Watershed Monitoring 2018 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2018 |
SMCRWM_2019 | SMC Regional Watershed Monitoring 2019 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2019 |
SMCRWM_2020 | SMC Regional Watershed Monitoring 2020 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2020 |
SMCRWM_2021 | SMC Regional Watershed Monitoring 2021 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2021 |
SMCRWM_2023 | SMC Regional Watershed Monitoring 2023 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2023 |
SMCRWM_2024 | SMC Regional Watershed Monitoring 2024 | Stormwater Monitoring Coalition Regional Watershed Monitoring 2024 |
SMCWPPP_CSM_WY2017 | SMCWPPP Creek Status Monitoring in WY2017 | SMCWPPP Creek Status Monitoring in WY2017 |
SMCWPPP_CSM_WY2018 | SMCWPPP Creek Status Monitoring in WY2018 | SMCWPPP Creek Status Monitoring in WY2018 |
SMCWPPP_CSM_WY2019 | SMCWPPP Creek Status Monitoring in WY2019 | |
SMCWPPP_CSM_WY2020 | SMCWPPP Creek Status Monitoring in WY2020 | SMCWPPP Creek Status Monitoring in WY2020 |
SMCWPPP_CSM_WY2021 | SMCWPPP Creek Status Monitoring in WY2021 | SMCWPPP Creek Status Monitoring in WY2021 |
SMCWPPP_CSM_WY2022 | SMCWPPP Creek Status Monitoring in WY2022 | SMCWPPP Creek Status Monitoring in WY2022 |
SMCWPPP_LID | SMCWPPP Low Impact Development Monitoring | |
SMCWPPP_LID_WY2024 | SMCWPPP Low Impact Development Monitoring WY2024 | SMCWPPP Low Impact Development Monitoring WY2024 |
SMCWPPP_LID_WY2025 | SMCWPPP Low Impact Development Monitoring WY2025 | SMCWPPP Low Impact Development Monitoring WY2025 |
SMCWPPP_P&T_WY2017 | SMCWPPP Pesticides and Toxicity Monitoring WY2017 | SMCWPPP Pesticides and Toxicity Monitoring in WY2017 |
SMCWPPP_P&T_WY2018 | SMCWPPP Pesticides and Toxicity Monitoring WY2018 | SMCWPPP Pesticides and Toxicity Monitoring in WY2018 |
SMCWPPP_P&T_WY2019 | SMCWPPP Pesticides and Toxicity Monitoring WY2019 | SMCWPPP Pesticides and Toxicity Monitoring in WY2019 |
SMCWPPP_P&T_WY2020 | SMCWPPP Pesticides and Toxicity Monitoring WY2020 | SMCWPPP Pesticides and Toxicity Monitoring in WY2020 |
SMCWPPP_P&T_WY2021 | SMCWPPP Pesticides and Toxicity Monitoring WY2021 | SMCWPPP Pesticides and Toxicity Monitoring in WY2021 |
SMCWPPP_P&T_WY2022 | SMCWPPP Pesticides and Toxicity Monitoring WY2022 | SMCWPPP Pesticides and Toxicity Monitoring in WY2022 |
SMCWPPP_P&T_WY2023 | SMCWPPP Pesticides and Toxicity Monitoring WY2023 | SMCWPPP Pesticides and Toxicity Monitoring WY2023 |
SMCWPPP_POC_WY2017 | SMCWPPP Pollutants of Concern Monitoring in WY2017 | SMCWPPP Pollutants of Concern Monitoring in WY2017 |
SMCWPPP_POC_WY2018 | SMCWPPP Pollutants of Concern Monitoring in WY2018 | SMCWPPP Pollutants of Concern Monitoring in WY2018 |
SMCWPPP_POC_WY2019 | SMCWPPP Pollutants of Concern Monitoring in WY2019 | |
SMCWPPP_POC_WY2020 | SMCWPPP Pollutants of Concern Monitoring in WY2020 | SMCWPPP Pollutants of Concern Monitoring in WY2020 |
SMCWPPP_POC_WY2021 | SMCWPPP Pollutants of Concern Monitoring WY2021 | SMCWPPP Pollutants of Concern Monitoring in WY2021 |
SMCWPPP_POC_WY2023 | SMCWPPP Pollutants of Concern Monitoring WY2023 | SMCWPPP Pollutants of Concern Monitoring in WY2023 |
SMCWPPP_RWL | SMCWPPP Receiving Water Limitations | |
SMCWPPP_SSID_PPH_FIB | Pillar Point Harbor Fecal Indicator Bacterial SSID | Pillar Point Harbor Fecal Indicator Bacterial SSID Project Stressor Source ID |
SMR_FS | Santa Margarita River Field Screening | SMR Field Screening |
SMR_GM | Santa Margarita River General Monitoring | SMR General Monitoring |
SNF_BAC_LS_2009 | Stanislaus Forest:Bacteria; Livestock 2009 | Impact of Livestock Grazing on Bacteria Contamination of Surface Waters in the Stanislaus National Forest, California: 2009 |
SNF_BAC_LS_2010-2015 | Stanislaus Forest:Bacteria; Livestock 2010-2015 | Impact of Livestock Grazing on Bacteria Contamination of Surface Waters in the Stanislaus National Forest, California: 2010-2015 |
SNF_BAC_LS_2016 | Stanislaus Forest:Bacteria; Livestock 2016 | Impact of Livestock Grazing on Bacteria Contamination of Surface Waters in the Stanislaus National Forest, California: 2016 |
SolanaBeach_Special_Study | Water Quality Monitoring in Solana beach | Water Quality Monitoring (Special Study) - in compliance with SD-RWQCB Order No. R9-2015-0001 and R9-2015-0100 |
SoSCCo_Bacteria_WY2021 | WY 2021 Bacteria Monit Pajaro Riv Watershed SSCC | Pajaro River Watershed Bacteria TMDL Monitoring in South Santa Clara County conducted in WY 2021 |
SoSCCo_Bacteria_WY2023 | WY 2023 Bacteria Monit Pajaro Riv Watershed SSCC | Pajaro River Watershed Bacteria TMDL Monitoring in South Santa Clara County conducted in WY 2023 |
SoSCCo_Bacteria_WY2024 | WY 2024 Bacteria Monit Pajaro Riv Watershed SSCC | Pajaro River Watershed Bacteria TMDL Monitoring in South Santa Clara County conducted in WY 2024 |
SPI_Research_2017 | Sierra Pacific Industries Research 2017 | Sierra Pacific Industries Research 2017 |
SPI_Research_2018 | Sierra Pacific Industries Research 2018 | Sierra Pacific Industries Research 2018 |
SPI_Research_2019 | Sierra Pacific Industries Research 2019 | Sierra Pacific Industries Research 2019 |
SPI_Research_2020 | Sierra Pacific Industries Research 2020 | Sierra Pacific Industries Research 2020 |
SPI_Research_2021 | Sierra Pacific Industries Research 2021 | Sierra Pacific Industries Research 2021 |
SPI_Research_2022 | Sierra Pacific Industries Research 2022 | Sierra Pacific Industries Research 2022 |
SPI_Research_2023 | Sierra Pacific Industries Research 2023 | Sierra Pacific Industries Research 2023 |
SPI_Research_2024 | Sierra Pacific Industries Research 2024 | Sierra Pacific Industries Research 2024 |
SPI_Research_WQ_2000 | SPI Research Water Quality Monitoring 2000 | SPI Research Water Quality Monitoring 2000 |
SPI_Research_WQ_2001 | SPI Research Water Quality Monitoring 2001 | SPI Research Water Quality Monitoring 2001 |
SPI_Research_WQ_2002 | SPI Research Water Quality Monitoring 2002 | SPI Research Water Quality Monitoring 2002 |
SPI_Research_WQ_2003 | SPI Research Water Quality Monitoring 2003 | SPI Research Water Quality Monitoring 2003 |
SPI_Research_WQ_2004 | SPI Research Water Quality Monitoring 2004 | SPI Research Water Quality Monitoring 2004 |
SPI_Research_WQ_2005 | SPI Research Water Quality Monitoring 2005 | SPI Research Water Quality Monitoring 2005 |
SPI_Research_WQ_2006 | SPI Research Water Quality Monitoring 2006 | SPI Research Water Quality Monitoring 2006 |
SPI_Research_WQ_2007 | SPI Research Water Quality Monitoring 2007 | SPI Research Water Quality Monitoring 2007 |
SPI_Research_WQ_2008 | SPI Research Water Quality Monitoring 2008 | SPI Research Water Quality Monitoring 2008 |
SPI_Research_WQ_2009 | SPI Research Water Quality Monitoring 2009 | SPI Research Water Quality Monitoring 2009 |
SPI_Research_WQ_2010 | SPI Research Water Quality Monitoring 2010 | SPI Research Water Quality Monitoring 2010 |
SPI_Research_WQ_2011 | SPI Research Water Quality Monitoring 2011 | SPI Research Water Quality Monitoring 2011 |
SPI_Research_WQ_2012 | SPI Research Water Quality Monitoring 2012 | SPI Research Water Quality Monitoring 2012 |
SPI_Research_WQ_2013 | SPI Research Water Quality Monitoring 2013 | SPI Research Water Quality Monitoring 2013 |
SPI_Research_WQ_2014 | SPI Research Water Quality Monitoring 2014 | SPI Research Water Quality Monitoring 2014 |
SPI_Research_WQ_2015 | SPI Research Water Quality Monitoring 2015 | SPI Research Water Quality Monitoring 2015 |
SPI_Research_WQ_2016 | SPI Research Water Quality Monitoring 2016 | SPI Research Water Quality Monitoring 2016 |
SPI_Research_WQ_2017 | SPI Research Water Quality Monitoring 2017 | SPI Research Water Quality Monitoring 2017 |
SPI_Research_WQ_2018 | SPI Research Water Quality Monitoring 2018 | SPI Research Water Quality Monitoring 2018 |
SPI_Research_WQ_2019 | SPI Research Water Quality Monitoring 2019 | SPI Research Water Quality Monitoring 2019 |
SPI_Research_WQ_2020 | SPI Research Water Quality Monitoring 2020 | SPI Research Water Quality Monitoring 2020 |
SPI_Research_WQ_2021 | SPI Research Water Quality Monitoring 2021 | SPI Research Water Quality Monitoring 2021 |
SPI_Research_WQ_2022 | SPI Research Water Quality Monitoring 2022 | SPI Research Water Quality Monitoring 2022 |
SPI_Research_WQ_2023 | SPI Research Water Quality Monitoring 2023 | SPI Research Water Quality Monitoring 2023 |
SPI_Research_WQ_2024 | SPI Research Water Quality Monitoring 2024 | SPI Research Water Quality Monitoring 2024 |
SR_CityHall_Monitoring | City Hall Plaza Garden and LID Monitoring | Construction of low water use demonstration garden at Santa Rosa City Hall and low impact retrofit to parking lot to increase storm water quality. |
SRRC_TMP_2008 | SSRC Temperature Monitoring 2008 | Long term water quality monitoring |
SS3_N | Special Study No. 3 -Nutrients | Special Study No. 3 Nutrient TMDL Compliance Monitoring |
SS3_PP | Special Study No. 3-OCPs_PCBs | Special Study No. 3 Pesticides and PCBs TMDL Monitoring |
SSA_LID | SSA Low Impact Development Monitoring | |
SSA_LID_WY2024 | SSA Low Impact Development Monitoring in WY2024 | SSA Low Impact Development Monitoring in WY2024 |
SSA_LID_WY2025 | SSA Low Impact Development Monitoring in WY2025 | SSA Low Impact Development Monitoring in WY2025 |
SSA_P&T_WY2023 | SSA Pesticides and Toxicity Monitoring in WY2023 | SSA Pesticides and Toxicity Monitoring in WY2023 |
SSJ_AY09_S1 | SSJ, Order R5-2008-0005, Jun 30 2009, AY09, SA1 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, June 30th 2009 Submittal, Semi Annual, Sampling Dates Nov08-Apr09 |
SSJ_AY09_S2 | SSJ, Order R5-2008-0005, Dec 31 2009, AY09, SA2 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, Dec. 31st 2009 Submittal, Semi Annual, Sampling Dates May-Oct 2009 |
SSJ_AY10_Q1 | SSJ, Order R5-2008-0005, Jun 1st 2010, AY10, Q1 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, June 1st 2010 Submittal, Annual Year 2010, Quarter 1, Sampling Dates Jan-Mar 2010 |
SSJ_AY10_Q2 | SSJ, Order R5-2008-0005, Sep 1st 2010, AY10, Q2 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, September 1st 2010 Submittal, Annual Year 2010, Quarter 2, Sampling Dates Apr-Jun 2010 |
SSJ_AY10_Q3 | SSJ, Order R5-2008-0005, Dec 1st 2010, AY10, Q3 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, December 1st 2010 Submittal, Annual Year 2010, Quarter 3, Sampling Dates Jul-Sept 2010 |
SSJ_AY10_Q4 | SSJ, Order R5-2008-0005, Mar 1st 2011, AY10, Q4 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, March 1st 2011 Submittal, Annual Year 2010, Quarter 4, Sampling Dates Oct-Dec 2010 |
SSJ_AY11_Q1 | SSJ, Order R5-2008-0005, Jun 1st 2011, AY11,Q1 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, June 1st 2011 Submittal, Annual Year 2011, Quarter 1, Sampling Dates Jan-Mar 2011 |
SSJ_AY11_Q2 | SSJ, Order R5-2008-0005, Sep 1st 2011, AY11, Q2 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, September 1st 2011 Submittal, Annual Year 2011, Quarter 2, Sampling Dates Apr-Jun 2011 |
SSJ_AY11_Q3 | SSJ, Order R5-2008-0005, Dec 1st 2011, AY11, Q3 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, December 1st 2011 Submittal, Annual Year 2011, Quarter 3, Sampling Dates Jul-Sep 2011 |
SSJ_AY11_Q4 | SSJ, Order R5-2008-0005, Mar 1st 2012, AY11, Q4 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, March 1st 2012 Submittal, Annual Year 2011, Quarter 4, Sampling Dates Oct-Dec 2011 |
SSJ_AY12_Q1 | SSJ, Order R5-2008-0005, Jun 1st 2012, AY12, Q1 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, June 1st 2012 Submittal, Annual Year 2012, Quarter 1, Sampling Dates Jan-Mar 2012 |
SSJ_AY12_Q2 | SSJ, Order R5-2008-0005, Sep 1st 2012, AY12, Q2 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, September 1st 2012 Submittal, Annual Year 2012, Quarter 2, Sampling Dates Apr-Jun 2012 |
SSJ_AY12_Q3 | SSJ, Order R5-2008-0005, Dec 1st 2012, AY12, Q3 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, December 1st 2012 Submittal, Annual Year 2012, Quarter 3, Sampling Dates Jul-Sep 2012 |
SSJ_AY12_Q4 | SSJ, Order R5-2008-0005, Mar 1st 2013, AY12, Q4 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, March 1st 2013 Submittal, Annual Year 2012, Quarter 4, Sampling Dates Oct-Dec 2012 |
SSJ_AY13_Q1 | SSJ, Order R5-2008-0005, Jun 1st 2013, AY13, Q1 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, June 1st 2013 Submittal, Annual Year 2013, Quarter 1, Sampling Dates Jan-Mar 2013 |
SSJ_AY13_Q2 | SSJ, Order R5-2008-0005, Sep 1st 2013, AY13, Q2 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, September 1st 2013 Submittal, Annual Year 2013, Quarter 2, Sampling Dates Apr-Jun 2013 |
SSJ_AY13_Q3 | SSJ, Order R5-2008-0005, Dec 1st 2013, AY13, Q3 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2008-0005, December 1st 2013 Submittal, Annual Year 2013, Quarter 3, Sampling Dates Jul-Sep 2013 |
SSJ_AY13_Q4 | SSJ, Order R5-2013-0120, Mar 1st 2014, AY13, Q4 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2013-0120, March 1st 2014 Submittal, Annual Year 2013, Quarter 4, Sampling Dates Oct-Dec 2013 |
SSJ_Historical | SSJ, Order R5-2003-0105, R5-2005-0833, 2004-2008 | Southern San Joaquin Water Quality CoalitionMonitoring Under ILRP Order R5-2003-0826, R5-2006-0053, Sampling Dates 2003-2008 |
SSJID_Historical | SSJID, Order R5-2003-0827, 2004-2008 | South San Joaquin Irrigation District Monitoring Under ILRP Order R5-2003-0827, Sampling Dates Sep 2004-Sep 2008 |
SSQP_2022 | Sacramento SW Quality Partnership Monitoring 2022 | Sacramento Stormwater 2022 |
Stk_SjCo_Rec_16-17 | City of Stk and SJCo Rec Water Monitoring 2016-17 | City of Stockton and San Joaquin County Stormwater Program receiving water monitoring 2016-2017 |
Stk_SjCo_Rec_17-18 | City of Stk and SJCo Rec Water Monitoring 2017-18 | City of Stockton and San Joaquin County Stormwater Program receiving water monitoring 2017-2018 |
Stk_SjCo_Rec_18-19 | City of Stk and SJCo Rec Water Monitoring 2018-19 | City of Stockton and San Joaquin County Stormwater Program receiving water monitoring 2018-2019 |
Stk_SjCo_Rec_19-20 | City of Stk and SJCo Rec Water Monitoring 2019-20 | City of Stockton and San Joaquin County Stormwater Program receiving water monitoring 2019-2020 |
Stk_SjCo_Rec_20-21 | City of Stk and SJCo Rec Water Monitoring 2020-21 | City of Stockton and San Joaquin County Stormwater Program receiving water monitoring 2020-2021 |
Stk_SjCo_Rec_21-22 | City of Stk and SJCo Rec Water Monitoring 2021-22 | City of Stockton and San Joaquin County Stormwater Program receiving water monitoring 2021-2022 |
SUN_MTV_FIB | Sunnyvale Mountain View FIB Monitoring | City of Sunnyvale and City of Mountain View Fecal Indicator Bacteria (FIB) Monitoring |
SVC_Historical | SVC, Order R5-2003-0105, R5-2005-0833, 2003-2008 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2003-0826, R5-2006-0053, Sampling Dates 2003-2008 |
SVC_WY09_Q2 | SVC, Order R5-2008-0005, June1st 2009, WY09, Q2 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, June 1st 2009 Submittal, Water Year 2009, Quarter 2, Sampling Dates Dec08-Mar09 |
SVC_WY09_Q3 | SVC, Order R5-2008-0005, Sep 1st 2009, WY09, Q3 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, Sep. 1st 2009 Submittal, Water Year 2009, Quarter 3, Sampling Dates Apr-Jun 2009 |
SVC_WY09_Q4 | SVC, Order R5-2008-0005, Dec 1st 2009, WY09, Q4 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, December 1st 2009 Submittal, Water Year 2009, Quarter 4, Sampling Dates Jul-Sep 2009 |
SVC_WY10_Q1 | SVC, Order R5-2008-0005, Mar 1st 2010, WY10, Q1 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, March 1st 2010 Submittal, Water Year 2010, Quarter 1, Sampling Dates Oct-Dec 2009 |
SVC_WY10_Q2 | SVC, Order R5-2008-0005, Jun 1st 2010, WY10, Q2 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, June 1st 2010 Submittal, Water Year 2010, Quarter 2, Sampling Dates Jan-Mar 2010 |
SVC_WY10_Q3 | SVC, Order R5-2008-0005, Sep 1st 2010, WY10, Q3 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, September 1st 2010 Submittal, Water Year 2010, Quarter 3, Sampling Dates Apr-Jun 2010 |
SVC_WY10_Q4 | SVC, Order R5-2008-0005, Dec 1st 2010, WY10, Q4 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, December 1st 2010 Submittal, Water Year 2010, Quarter 4, Sampling Dates Jul-Sep 2010 |
SVC_WY11_Q1 | SVC, Order R5-2008-0005, Mar 1st 2011, WY11, Q1 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, March 1st 2011 Submittal, Water Year 2011, Quarter 1, Sampling Dates Oct-Dec 2010 |
SVC_WY11_Q2 | SVC, Order R5-2008-0005, Jun 1st 2011, WY11, Q2 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, June 1st 2011 Submittal, Water Year 2011, Quarter 2, Sampling Dates Jan-Mar 2011 |
SVC_WY11_Q3 | SVC, Order R5-2008-0005, Sep 1st 2011, WY11, Q3 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, Sept 1st 2011 Submittal, Water Year 2011, Quarter 3, Sampling Dates Apr-Jun 2011 |
SVC_WY11_Q4 | SVC, Order R5-2008-0005, Dec 1st 2011, WY11, Q4 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, December 1st 2011 Submittal , Water Year 2011, Quarter 4, Sampling Dates Jul-Sep 2011 |
SVC_WY12_Q1 | SVC, Order R5-2008-0005, Mar 1st 2012, WY12, Q1 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, March 1st 2012 Submittal, Water Year 2012, Quarter 1, Sampling Dates Oct-Dec 2011 |
SVC_WY12_Q2 | SVC, Order R5-2008-0005, Jun 1st 2012, WY12, Q2 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, June 1st 2012 Submittal, Water Year 2012, Quarter 2, Sampling Dates Jan-Mar 2012 |
SVC_WY12_Q3 | SVC, Order R5-2008-0005, Sep 1st 2012, WY12, Q3 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, Sept 1st 2012 Submittal, Water Year 2012, Quarter 3, Sampling Dates Apr-Jun 2012 |
SVC_WY12_Q4 | SVC, Order R5-2008-0005, Dec 1st 2012, WY12, Q4 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, December 1st 2012 Submittal , Water Year 2012, Quarter 4, Sampling Dates Jul-Sep 2012 |
SVC_WY13_Q1 | SVC, Order R5-2008-0005, Mar 1st 2013, WY13, Q1 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, March 1st 2013 Submittal, Water Year 2013, Quarter 1, Sampling Dates Oct-Dec 2012 |
SVC_WY13_Q2 | SVC, Order R5-2008-0005, Jun 1st 2013, WY13, Q2 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, June 1st 2013 Submittal, Water Year 2013, Quarter 2, Sampling Dates Jan-Mar 2013 |
SVC_WY13_Q3 | SVC, Order R5-2008-0005, Sep 1st 2013, WY13, Q3 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, Sept 1st 2013 Submittal, Water Year 2013, Quarter 3, Sampling Dates Apr-Jun 2013 |
SVC_WY13_Q4 | SVC, Order R5-2008-0005, Dec 1st 2013, WY13, Q4 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2008-0005, December 1st 2013 Submittal , Water Year 2013, Quarter 4, Sampling Dates Jul-Sep 2013 |
SVC_WY14_Q1 | SVC, Order R5-2014-0030, Jun 1st 2014, WY14, Q1 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, June 1st 2014 Submittal, Water Year 2014, Quarter 1, Sampling Dates Oct-Dec 2013 |
SVC_WY14_Q2 | SVC, Order R5-2014-0030, Sep 1st 2014, WY14, Q2 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, September 1st 2014 Submittal, Water Year 2014, Quarter 2, Sampling Dates Jan-Mar 2014 |
SVC_WY14_Q3 | SVC, Order R5-2014-0030, Dec 1st 2014, WY14, Q3 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, December 1st 2014 Submittal, Water Year 2014, Quarter 3, Sampling Dates Apr-Jun 2014 |
SVC_WY14_Q4 | SVC, Order R5-2014-0030, Mar 1st 2015, WY14, Q4 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, March1st 2015 Submittal, Water Year 2014, Quarter 4, Sampling Dates Jul-Sep 2014 |
SVC_WY15_Q1 | SVC, Order R5-2014-0030, Jun 1st 2015, WY15, Q1 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, June 1st 2015 Submittal, Water Year 2015, Quarter 1, Sampling Dates Oct-Dec 2014 |
SVC_WY15_Q2 | SVC, Order R5-2014-0030, Sep 1st 2015, WY15, Q2 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, September 1st 2015 Submittal, Water Year 2015, Quarter 2, Sampling Dates Jan-Mar 2015 |
SVC_WY15_Q3 | SVC, Order R5-2014-0030, Dec 1st 2015, WY15, Q3 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, December 1st 2015 Submittal, Water Year 2015, Quarter 3, Sampling Dates Apr-Jun 2015 |
SVC_WY15_Q4 | SVC, Order R5-2014-0030, Mar 1st 2015, WY15, Q4 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, March 1st 2015 Submittal, Water Year 2015, Quarter 4, Sampling Dates Jul-Sep 2015 |
SVC_WY16_Q1 | SVC, Order R5-2014-0030, Jun 1st 2016, WY16, Q1 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, June 1st 2016 Submittal, Water Year 2016, Quarter 1, Sampling Dates Oct-Dec 2015 |
SVC_WY16_Q2 | SVC, Order R5-2014-0030, Sep 1st 2016, WY16, Q2 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, September 1st 2016 Submittal, Water Year 2016, Quarter 2, Sampling Dates Jan-Mar 2016 |
SVC_WY16_Q3 | SVC, Order R5-2014-0030, Dec 1st 2016, WY16, Q3 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, December 1st 2016 Submittal, Water Year 2016, Quarter 3, Sampling Dates Apr-Jun 2016 |
SVC_WY16_Q4 | SVC, Order R5-2014-0030, Mar 1st 2017, WY16, Q4 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, March 1st 2017 Submittal, Water Year 2016, Quarter 4, Sampling Dates Jul-Sep 2016 |
SVC_WY17_Q1 | SVC, Order R5-2014-0030, Jun 1st 2017, WY17, Q1 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, June 1st 2017 Submittal, Water Year 2017, Quarter 1, Sampling Dates Oct-Dec 2016 |
SVC_WY17_Q2 | SVC, Order R5-2014-0030, Sep 1st 2017, WY17, Q2 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, September 1st 2017 Submittal, Water Year 2017, Quarter 2, Sampling Dates Jan-Mar 2017 |
SVC_WY17_Q3 | SVC, Order R5-2014-0030, Dec 1st 2017, WY17, Q3 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, December 1st 2017 Submittal, Water Year 2017, Quarter 3, Sampling Dates Apr-Jun 2017 |
SVC_WY17_Q4 | SVC, Order R5-2014-0030, Mar 1st 2018, WY17, Q4 | Sacramento Valley Water Quality Coalition Monitoring Under ILRP Order R5-2014-0030, March 1st 2018 Submittal, Water Year 2017, Quarter 4, Sampling Dates Jul-Sep 2017 |
SWtoSSCCRP-P1-GP | SWtoSSCCRP-Phase1 Garrison Park 2014-2015 | Stormwater to Sanitary Sewer Cross Connection Removal Project -Phase 1 Garrison Park 2014-2015 |
SYRCL-RMP-2000 | SYRCL 2000 Monitoring Program | |
SYRCL-RMP-2001 | SYRCL 2001 Monitoring Program | |
SYRCL-RMP-2002 | SYRCL 2002 Monitoring Program | |
SYRCL-RMP-2003 | SYRCL 2003 Monitoring Program | |
SYRCL-RMP-2004 | SYRCL 2004 Monitoring Program | |
SYRCL-RMP-2005 | SYRCL 2005 Monitoring Program | |
SYRCL-RMP-2006 | SYRCL 2006 Monitoring Program | |
SYRCL-RMP-2007 | SYRCL 2007 Monitoring Program | |
SYRCL-RMP-2008 | SYRCL 2008 Monitoring Program | |
SYRCL-RMP-2009 | SYRCL 2009 Monitoring Program | |
SYRCL-RMP-2010 | SYRCL 2010 Monitoring Program | |
SYRCL-RMP-2011 | SYRCL 2011 Monitoring Program | |
SYRCL-RMP-2012 | SYRCL 2012 Monitoring Program | |
SYRCL-RMP-2013 | SYRCL 2013 Monitoring Program | |
SYRCL-RMP-2014 | SYRCL 2014 Monitoring Program | |
SYRCL-RMP-2015 | SYRCL 2015 Monitoring Program | |
SYRCL-RMP-2016 | SYRCL 2016 Monitoring Program | |
SYRCL-RMP-2017 | SYRCL 2017 Monitoring Program | |
SYRCL-RMP-2018 | SYRCL 2018 Monitoring Program | |
SYRCL-RMP-2019 | SYRCL 2019 Monitoring Program | |
SYSM_NUTR_LOAD_18-19 | Santa Ysabel Santa Maria Crk Nutr Load 18-19 | 2018-2019 Santa Ysabel and Santa Maria Nutrient Loading Study |
Tahoe Ambient | Tahoe Ambient Bioassessment | TRPA Annual Basinwide Bioassessment Sampling |
TAMT_IO | Tenth Avenue Marine Terminal Investigative Order | Tenth Avenue Marine Terminal Investigative Order |
TecoloteCreek_Source_Investigation | Tecolote Creek Source Investigation Study | Tecolote Creek Source Investigation Study |
Test | Test | Test |
TID_Historical | TID, Order R5-2003-0827, 2004-2008 | Turlock Irrigation District Monitoring Under ILRP Order R5-2003-0827, Sampling Dates Jul 2004-Jul 2008 |
TIJUANA_RIVER_NUTR_LOAD | Upper Tijuana River Nutrient Load | Estimate relative loadings of nutrients from County MS4 and from the Cottonwood and Pine Valley Creeks to the Barrett and Morena reservoirs during dry and wet weather. |
TMDL_ESJ_SJR_OP_WY15 | San Joaquin River OP TMDL Monitoring WY 2015 | San Joaquin River Chlorpyrifos and Diazinon TMDL 2015 Annual Monitoring Report: Oct. 2014 through September 2015 Sampling Data |
TMDL_ESJ_SJR_OP_WY16 | San Joaquin River OP TMDL Monitoring WY 2016 | San Joaquin River Chlorpyrifos and Diazinon TMDL 2016 Annual Monitoring Report: Oct. 2015 through September 2016 Sampling Data |
TMDL_ESJ_SJR_OP_WY17 | San Joaquin River OP TMDL Monitoring WY 2017 | San Joaquin River Chlorpyrifos and Diazinon TMDL 2017 Annual Monitoring Report: Oct. 2016 through September 2017 Sampling Data |
TMDL_ESJ_SJR_OP_WY18 | San Joaquin River OP TMDL Monitoring WY 2018 | San Joaquin River Chlorpyrifos and Diazinon TMDL 2018 Annual Monitoring Report: Oct. 2016 through September 2018 Sampling Data |
TMDL_ESJ_SJR_OP_WY19 | San Joaquin River OP TMDL Monitoring WY 2019 | San Joaquin River Chlorpyrifos and Diazinon TMDL 2019 Annual Monitoring Report: Oct. 2018 through September 2019 Sampling Data |
TMDL_ESJ_SJR_OP_WY20 | San Joaquin River OP TMDL Monitoring WY 2020 | San Joaquin River Chlorpyrifos and Diazinon TMDL 2020 Annual Monitoring Report: Oct. 2019 through September 2020 Sampling Data |
TMDL_ESJ_SJR_OP_WY21 | San Joaquin River OP TMDL Monitoring WY 2021 | San Joaquin River Chlorpyrifos and Diazinon TMDL 2021 Annual Monitoring Report: Oct. 2020 through September 2021 Sampling Data |
TMDL_ESJWQC | San Joaquin River OP TMDL monitoring | Organophosphate, Chlorpyrifos and Diazinon Total Maximum Daily Load Quarterly monitoring for the San Joaquin River |
TMDL_IR | TMDL Intergrated Report Special Study | Monitoring 303(d) listed waterbodies to verify appropriateness of SSOs for constits like TDS, TSS, and nutrients. Monthly sampling of 303(d) listed WBs to determine if existing SSOs, should be revised to reflect seasonal variability of pollutant levels. |
TMDL_RB5 | TMDL RWQCB5 | Organophosphate Total Maximum Daily Load monitoring for the San Joaquin River (Region 5) |
TMDL_RWB6_SusanRiver_Tox | RWQCB6 Susan River Toxicity TMDL Monitoring | Lahontan Regional Water Board Susan River Toxicity Total Maximum Daily Load Monitoring |
TMDLI-H | TMDL Implementation Project Homewood | Total Maximum Daily Load Implementation Project Homewood |
TNC_WRD_07-10 | Williamson River Delta Monitoring 2007-2010 | Williamson River Delta Monitoring 2007-2010 Long term water quality monitoring |
Tourmaline_SI | Tourmaline Source Investigation Study | Tourmaline Source Investigation Study |
TRWC_AS_2001 | Truckee River Watershed Council: Adopt a Stream 01 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2001 |
TRWC_AS_2002 | Truckee River Watershed Council: Adopt a Stream 02 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2002 |
TRWC_AS_2003 | Truckee River Watershed Council: Adopt a Stream 03 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2003 |
TRWC_AS_2004 | Truckee River Watershed Council: Adopt a Stream 04 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2004 |
TRWC_AS_2005 | Truckee River Watershed Council: Adopt a Stream 05 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2005 |
TRWC_AS_2006 | Truckee River Watershed Council: Adopt a Stream 06 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2006 |
TRWC_AS_2007 | Truckee River Watershed Council: Adopt a Stream 07 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2007 |
TRWC_AS_2008 | Truckee River Watershed Council: Adopt a Stream 08 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2008 |
TRWC_AS_2009 | Truckee River Watershed Council: Adopt a Stream 09 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2009 |
TRWC_AS_2010 | Truckee River Watershed Council: Adopt a Stream 10 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2010 |
TRWC_AS_2011 | Truckee River Watershed Council: Adopt a Stream 11 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2011 |
TRWC_AS_2012 | Truckee River Watershed Council: Adopt a Stream 12 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2012 |
TRWC_AS_2013 | Truckee River Watershed Council: Adopt a Stream 13 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2013 |
TRWC_AS_2014 | Truckee River Watershed Council: Adopt a Stream 14 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2014 |
TRWC_AS_2015 | Truckee River Watershed Council: Adopt a Stream 15 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2015 |
TRWC_AS_2016 | Truckee River Watershed Council: Adopt a Stream 16 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2016 |
TRWC_AS_2017 | Truckee River Watershed Council: Adopt a Stream 17 | Truckee River Watershed Council: Adopt a Stream ambient monitoring data 2017 |
TRWC_TRAM_2008 | Truckee River WC: Truckee River Aquatic Monitor 08 | Truckee River Watershed Council: Truckee River Aquatic Monitors bioassessment data 2008 |
TRWC_TRAM_2010 | Truckee River WC: Truckee River Aquatic Monitor 10 | Truckee River Watershed Council: Truckee River Aquatic Monitors bioassessment data 2010 |
TRWC_TRAM_2011 | Truckee River WC: Truckee River Aquatic Monitor 11 | Truckee River Watershed Council: Truckee River Aquatic Monitors bioassessment data 2011 |
TRWC_TRAM_2012 | Truckee River WC: Truckee River Aquatic Monitor 12 | Truckee River Watershed Council: Truckee River Aquatic Monitors bioassessment data 2012 |
TRWC_TRAM_2013 | Truckee River WC: Truckee River Aquatic Monitor 13 | Truckee River Watershed Council: Truckee River Aquatic Monitors bioassessment data 2013 |
TRWC_TRAM_2014 | Truckee River WC: Truckee River Aquatic Monitor 14 | Truckee River Watershed Council: Truckee River Aquatic Monitors bioassessment data 2014 |
TRWC_TRAM_2016 | Truckee River WC: Truckee River Aquatic Monitor 16 | Truckee River Watershed Council: Truckee River Aquatic Monitors bioassessment data 2016 |
TRWC_TRAM_2017 | Truckee River WC: Truckee River Aquatic Monitor 17 | Truckee River Watershed Council: Truckee River Aquatic Monitors bioassessment data 2017 |
TRWC_TRAM_2018 | Truckee River WC: Truckee River Aquatic Monitor 18 | Truckee River Watershed Council: Truckee River Aquatic Monitors bioassessment data 2017 |
TRWQMP_PC_2010-2013 | TRWQMP Placer County 2010-2013 | Truckee River Water Quality Monitoring Plan, Placer County 2010-2013 |
TRWQMP_PC_2014 | TRWQMP Placer County 2014 | Truckee River Water Quality Monitoring Plan, Placer County 2014 |
TRWQMP_PC_2015 | TRWQMP Placer County 2015 | Truckee River Water Quality Monitoring Plan, Placer County 2015 |
TRWQMP_PC_2016 | TRWQMP Placer County 2016 | Truckee River Water Quality Monitoring Plan, Placer County 2016 |
TRWQMP_PC_2018 | TRWQMP Placer County 2018 | Truckee River Water Quality Monitoring Plan, Placer County 2018 |
TRWQMP_PC_2020 | TRWQMP Placer County 2020 | Truckee River Water Quality Monitoring Plan, Placer County 2020 |
TRWQMP_PC_2023 | TRWQMP Placer County 2023 | Truckee River Water Quality Monitoring Plan, Placer County 2023 |
TRWQMP_SquawCk_BA_2010 | TRWQMP Squaw Creek Bioassessment - 2010 | Truckee River Water Quality Monitoring Plan Squaw Creek Bioassessment - 2010 |
TRWQMP_SquawCk_BA_2012 | TRWQMP Squaw Creek Bioassessment - 2012 | Truckee River Water Quality Monitoring Plan Squaw Creek Bioassessment - 2012 |
TRWQMP_SquawCk_BA_2014 | TRWQMP Squaw Creek Bioassessment - 2014 | Truckee River Water Quality Monitoring Plan Squaw Creek Bioassessment - 2014 |
TRWQMP_SquawCk_BA_2016 | TRWQMP Squaw Creek Bioassessment - 2016 | Truckee River Water Quality Monitoring Plan Squaw Creek Bioassessment - 2016 |
TRWQMP_SquawCk_BA_2018 | TRWQMP Squaw Creek Bioassessment - 2018 | Truckee River Water Quality Monitoring Plan Squaw Creek Bioassessment - 2018 |
TRWQMP_SquawCk_BA_2020 | TRWQMP Squaw Creek Bioassessment - 2020 | Truckee River Water Quality Monitoring Plan Squaw Creek Bioassessment - 2020 |
TRWQMP_TOT_2010-2013 | TRWQMP Town of Truckee 2010-2013 | Truckee River Water Quality Monitoring Plan, Town of Truckee 2010-2013 |
TRWQMP_WasheshuCk_BA_2023 | TRWQMP Washeshu Creek Bioassessment - 2023 | Truckee River Water Quality Monitoring Plan Washeshu Creek Bioassessment - 2023 |
TUL_AY14_Q1 | TUL, Order R5-2013-0120, Jun 1st 2014, AY14, Q1 | Tule Basin Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, June 1st 2014 Submittal, Annual Year 2014, Quarter 1, Sampling Dates Jan-Mar 2014 |
TUL_AY14_Q2 | TUL, Order R5-2013-0120, Sep 1st 2014, AY14, Q2 | Tule Basin Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, September 1st 2014 Submittal, Annual Year 2014, Quarter 2, Sampling Dates Apr-June 2014 |
TUL_AY14_Q3 | TUL, Order R5-2013-0120, Dec 1st 2014, AY14, Q3 | Tule Basin Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, December 1st 2014 Submittal, Annual Year 2014, Quarter 3, Sampling Dates July-Sept 2014 |
TUL_AY14_Q4 | TUL, Order R5-2013-0120, Mar 1st 2015, AY14, Q4 | Tule Basin Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, March 1st 2015 Submittal, Annual Year 2014, Quarter 4, Sampling Dates Oct-Dec 2014 |
TUL_AY15_Q1 | TUL, Order R5-2013-0120, Jun 1st 2015, AY15, Q1 | Tule Basin Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, June 1st 2015 Submittal, Annual Year 2015, Quarter 1, Sampling Dates Jan-Mar 2015 |
TUL_AY15_Q2 | TUL, Order R5-2013-0120, Sep 1st 2015, AY15, Q2 | Tule Basin Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, September 1st 2015 Submittal, Annual Year 2015, Quarter 2, Sampling Dates Apr-Jun 2015 |
TUL_AY15_Q3 | TUL, Order R5-2013-0120, Dec 1st 2015, AY15, Q3 | Tule Basin Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, December 1st 2015 Submittal, Annual Year 2015, Quarter 3, Sampling Dates Jul-Sep 2015 |
TUL_AY15_Q4 | TUL, Order R5-2013-0120, Mar 1st 2016, AY15, Q4 | Tule Basin Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, March 1st 2016 Submittal, Annual Year 2015 Quarter 4, Sampling Dates Oct-Dec 2015 |
TUL_AY16_Q1 | TUL, Order R5-2013-0120, Jun 1st 2016, AY16, Q1 | Tule Basin Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, June 1st 2016 Submittal, Annual Year 2016, Quarter 1, Sampling Dates Jan-Mar 2016 |
TUL_AY16_Q2 | TUL, Order R5-2013-0120, Sep 1st 2016, AY16, Q2 | Tule Basin Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, September 1st 2016 Submittal, Annual Year 2016, Quarter 2, Sampling Dates Apr-Jun 2016 |
UORWQP-2012 | Upper Owens River Water Quality Project 2012 | Upper Owens River Water Quality Project 2012 |
UORWQP-2013 | Upper Owens River Water Quality Project 2013 | Upper Owens River Water Quality Project 2013 |
Upper_SanMarcos | Upper San Marcos Creek Monitoring | Upper San Marcos Creek Monitoring |
UpperSaltSlough_2014 | Upper Salt Slough Special Monitoring Project 2014 | Upper Salt Slough Special Monitoring Project July 2014 |
USGS_SuBay_2011-2012 | USGS Suisun Bay Monitoring Project 2011-2012 | Dissolved Pesticide Concentrations in the Sacramento-San Joaquin Delta and Grizzly Bay, California, 201112, Data Series 779, U.S. Depart of the Interior, USGS, Prepared in cooperation with SLDMWA |
UTRBCP_2010-2012 | Upper Truckee River and Blackwood Creek Project | Grant from the Bureau of Reclamation through the Tahoe Wetlands Grant (Sampling 2010-2012) |
Vallejo_CSM_WY2017 | Vallejo Creek Status Monitoring in WY2017 | City of Vallejo and Vallejo Sanition and Flood Control District Creek Status Monitoring in WY2017 |
Vallejo_CSM_WY2019 | Vallejo Creek Status Monitoring in WY2019 | City of Vallejo and Vallejo Sanition and Flood Control District Creek Status Monitoring in WY2019 |
VCAILG | Ventura County Agriculture Irrigated Lands Group | Ventura County Agriculture Irrigated Lands Group (Ag Waiver) |
VCSQMP | Ventura Countywide Stormwater Quality Mgmt Program | Ventura Countywide Stormwater Quality Mgmt Program |
Vta_Algae_TMDL | Ventura River Watershed Algae TMDL | |
Washburn_2010 | Washburn_2010 | Washburn March 2010 |
WC_PC_2013-2016 | Wolf Creek: Peabody Creek 2013-2016 | Wolf Creek: Peabody Creek 2013-2016 |
WC_PC_2017-2020 | Wolf Creek: Peabody Creek 2017-2020 | Wolf Creek: Peabody Creek 2017-2020 |
WES_Historical | WES, Order R5-2003-0105, R5-2005-0833, 2003-2008 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2003-0826, R5-2006-0053, Sampling Dates 2003-2008 |
WES_Mar09-Aug09 | WES Order R5-2008-0005, Nov 30th 2009, Mar09-Aug09 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2008-005, November 30th 2009 Submittal, Semi Annual, Sample Dates Mar09-Aug09 |
WES_Mar10-Aug10 | WES, Order R5-2008-0005, Nov 30th 2010, Mar10-Aug1 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2008-005, November 30th 2010 Submittal , Semi Annual, Sample Dates Mar10-Aug10 |
WES_Mar11-Aug11 | WES Order R5-2008-0005, Nov 30th 2011, Mar11-Aug11 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2008-005, November 30th 2011 Submittal , Semi Annual, Sample Dates Mar11-Aug11 |
WES_Mar12-Aug12 | WES Order R5-2008-0005, Nov 30th 2012, Mar12-Aug12 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2008-005, November 30th 2012 Submittal , Semi Annual, Sample Dates Mar12-Aug12 |
WES_Mar13-Aug13 | WES Order R5-2008-0005, Nov 30th 2013, Mar13-Aug13 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2008-005, November 30th 2013 Submittal , Semi Annual, Sample Dates Mar13-Aug13 |
WES_Mar14-Aug14 | WES Order R5-2014-0002, Nov 30th 2014, Mar14-Aug14 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2014 Submittal , Semi Annual, Sample Dates Mar14-Aug14 |
WES_Mar15-Aug15 | WES Order R5-2014-0002, Nov 30th 2015, Mar15-Aug15 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2015 Submittal , Semi Annual, Sample Dates Mar15-Aug15 |
WES_Mar16-Aug16 | WES Order R5-2014-0002, Nov 30th 2016, Mar16-Aug16 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2016 Submittal , Semi Annual, Sample Dates Mar16-Aug16 |
WES_Mar17-Aug17 | WES Order R5-2014-0002, Nov 30th 2017, Mar17-Aug17 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2017 Submittal , Semi Annual, Sample Dates Mar17-Aug17 |
WES_Mar18-Aug18 | WES Order R5-2014-0002, Nov 30th 2018, Mar18-Aug18 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2018 Submittal , Semi Annual, Sample Dates Mar18-Aug18 |
WES_Mar19-Aug19 | WES Order R5-2014-0002, Nov 30th 2019, Mar19-Aug19 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2019 Submittal , Semi Annual, Sample Dates Mar19-Aug19 |
WES_Mar20-Aug20 | WES Order R5-2014-0002, Nov 30th 2020, Mar20-Aug20 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2020 Submittal , Semi Annual, Sample Dates Mar20-Aug20 |
WES_Mar21-Aug21 | WES Order R5-2014-0002, Nov 30th 2021, Mar21-Aug21 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2021 Submittal , Semi Annual, Sample Dates Mar21-Aug21 |
WES_Mar22-Aug22 | WES Order R5-2014-0002, Nov 30th 2022, Mar22-Aug22 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2022 Submittal , Semi Annual, Sample Dates Mar22-Aug22 |
WES_Mar23-Aug23 | WES Order R5-2014-0002, Nov 30th 2023, Mar23-Aug23 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2023 Submittal, Semi Annual, Sample Dates Mar23-Aug23 |
WES_Mar24-Aug24 | WES Order R5-2014-0002, Nov 30th 2024, Mar24-Aug24 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, November 30th 2024 Submittal, Semi Annual, Sample Dates Mar24-Aug24 |
WES_Sep08-Feb09 | WES Order R5-2008-0005, Jun 15th 2009, Sep08-Feb09 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2008-005, June 15th 2009 Submittal , Semi Annual, Sample Dates Sep08-Feb09 |
WES_Sep09-Feb10 | WES, Order R5-2008-0005, Jun 15th 2010, Sep09-Feb1 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2008-005, June 15th 2010 Submittal, Semi Annual, Sample Dates Sep09-Feb10 |
WES_Sep10-Feb11 | WES Order R5-2008-0005, Jun 15th 2011, Sep10-Feb11 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2008-005, June 15th 2011 Submittal , Semi Annual, Sample Dates Sep10-Feb11 |
WES_Sep11-Feb12 | WES Order R5-2008-0005, Jun 15th 2012, Sep11-Feb12 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2008-005, June 15th 2012 Submittal , Semi Annual, Sample Dates Sep11-Feb12 |
WES_Sep12-Feb13 | WES Order R5-2008-0005, Jun 15th 2013, Sep12-Feb13 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2008-005, June 15th 2013 Submittal , Semi Annual, Sample Dates Sep12-Feb13 |
WES_Sep13-Feb14 | WES Order R5-2014-0002, Jun 15th 2014, Sep13-Feb14 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2014 Submittal , Semi Annual, Sample Dates Sep13- Feb14 |
WES_Sep14-Feb15 | WES Order R5-2014-0002, Jun 15th 2015, Sep14-Feb15 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2015 Submittal , Semi Annual, Sample Dates Sep14- Feb15 |
WES_Sep15-Feb16 | WES Order R5-2014-0002, Jun 15th 2016, Sep15-Feb16 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2016 Submittal , Semi Annual, Sample Dates Sep15- Feb16 |
WES_Sep16-Feb17 | WES Order R5-2014-0002, Jun 15th 2017, Sep16-Feb17 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2017 Submittal , Semi Annual, Sample Dates Sep16- Feb17 |
WES_Sep17-Feb18 | WES Order R5-2014-0002, Jun 15th 2018, Sep17-Feb18 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2018 Submittal , Semi Annual, Sample Dates Sep17- Feb18 |
WES_Sep18-Feb19 | WES Order R5-2014-0002, Jun 15th 2019, Sep18-Feb19 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2019 Submittal , Semi Annual, Sample Dates Sep18- Feb19 |
WES_Sep19-Feb20 | WES Order R5-2014-0002, Jun 15th 2020, Sep19-Feb20 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2020 Submittal , Semi Annual, Sample Dates Sep19- Feb20 |
WES_Sep20-Feb21 | WES Order R5-2014-0002, Jun 15th 2021, Sep20-Feb21 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2021 Submittal , Semi Annual, Sample Dates Sep21- Feb21 |
WES_Sep21-Feb22 | WES Order R5-2014-0002, Jun 15th 2022, Sep21-Feb22 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2022 Submittal , Semi Annual, Sample Dates Sep21- Feb22 |
WES_Sep22-Feb23 | WES Order R5-2014-0002, Jun 15th 2023, Sep22-Feb23 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2023 Submittal , Semi Annual, Sample Dates Sep22- Feb23 |
WES_Sep23-Feb24 | WES Order R5-2014-0002, Jun 15th 2024, Sep23-Feb24 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2024 Submittal, Semi Annual, Sample Dates Sep23- Feb24 |
WES_Sep24-Feb25 | WES Order R5-2014-0002, Jun 15th 2025, Sep24-Feb25 | Westside San Joaquin River Watershed Coalition Monitoring Under ILRP Order R5-2014-0002, June 15th 2025 Submittal, Semi Annual, Sample Dates Sep24-Feb25 |
Weston_2004 | Weston_2004S | Aquatic Toxicity Due to Residential Use of Pyrethroid Insecticides 2004. Weston 2004 |
WFTMDL | Windset Farms TMDL Monitoring | |
Willits_BA_Monit_2010 | Willits Bioassessment Monitoring - 2010 | Willits Bioassessment Monitoring - 2010 |
Willits_BA_Monit_Spr_2021 | Willits Bioassessment Monitoring - Spring 2021 | Willits Bioassessment Monitoring - Spring 2021 |
Willits_BA_Monit_Spr_2022 | Willits Bioassessment Monitoring - Spring 2022 | Willits Bioassessment Monitoring - Spring 2022 |
Willits_BA_Monit_Spring_2011 | Willits Bioassessment Monitoring - Spring 2011 | Willits Bioassessment Monitoring - Spring 2011 |
Willits_BA_Monit_Spring_2017 | Willits Bioassessment Monitoring - Spring 2017 | Willits Bioassessment Monitoring - Spring 2017 |
Willits_BA_Monit_Spring_2018 | Willits Bioassessment Monitoring - Spring 2018 | Willits Bioassessment Monitoring - Spring 2018 |
Willits_BA_Monit_Sum_2021 | Willits Bioassessment Monitoring - Summer 2021 | Willits Bioassessment Monitoring - Summer 2021 |
Willits_BA_Monit_Sum_2022 | Willits Bioassessment Monitoring - Summer 2022 | Willits Bioassessment Monitoring - Summer 2022 |
Willits_BA_Monit_Summer_2011 | Willits Bioassessment Monitoring - Summer 2011 | Willits Bioassessment Monitoring - Summer 2011 |
Willits_BA_Monit_Summer_2017 | Willits Bioassessment Monitoring - Summer 2017 | Willits Bioassessment Monitoring - Summer 2017 |
Willits_BA_Monit_Summer_2018 | Willits Bioassessment Monitoring - Summer 2018 | Willits Bioassessment Monitoring - Summer 2018 |
Willits_WQ_Monit_BAES | Willits SWQMP - Bypass Alignment Event Sampling | Willits Surface Water Quality Monitoring Program - Bypass Alignment Event Sampling |
Willits_WQ_Monit_BAMS | Willits SWQMP - Bypass Alignment Monthly Sampling | Willits Surface Water Quality Monitoring Program - Mitigation Lands Monthly Sampling |
Willits_WQ_Monit_MLES | Willits SWQMP - Mitigation Lands Event Sampling | Willits Surface Water Quality Monitoring Program - Mitigation Lands Event Sampling |
Willits_WQ_Monit_MLMS | Willits SWQMP - Mitigation Lands Monthly Sampling | Willits Surface Water Quality Monitoring Program - Mitigation Lands Monthly Sampling |
WQMP | Water Quality Monitoring Program | Forest-wide water quality monitoring program |
WQRT_Investigations | Water Quality Response Team Source Investigations | Water Quality Response Team Source Investigations |
WSC_AY09_Q1 | WSC, Order R5-2008-0005, Jun 1st 2010, AY09, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2003-0826, R5-2006-0053, June 30th 2009, Annual Year 2009, Quarter, Sampling Dates Nov08-July09 |
WSC_AY09_Q2 | WSC, Order R5-2008-0005, Sep 1st 2010, AY09, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, June 30th 2009 Submittal, Annual Year 2009, Quarter 2, Sampling Dates Nov08-Jul09 |
WSC_AY09_Q3 | WSC, Order R5-2008-0005, Dec 1st 2010, AY09, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, December 31st 2009 Submittal, Annual Year 2009, Quarter, Sampling Dates Jul-Sep 2009 |
WSC_AY09_Q4 | WSC, Order R5-2008-0005, Mar 1st 2010, AY09, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2010 Submittal, Annual Year 2009, Quarter 4, Sampling Dates Oct-Jan 2009 |
WSC_AY10_Q1 | WSC, Order R5-2008-0005, Jun 1st 2010, AY10, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2010 Submittal, Annual Year 2010, Quarter 1, Sampling Dates Jan-Mar 2010 |
WSC_AY10_Q2 | WSC, Order R5-2008-0005, Sep 1st 2010, AY10, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2010 Submittal, Annual Year 2010, Quarter 2, Sampling Dates Apr-Jun 2010 |
WSC_AY10_Q3 | WSC, Order R5-2008-0005, Dec 1st 2010, AY10, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2010 Submittal, Annual Year 2010, Quarter 3, Sampling Dates Jul-Sep 2010 |
WSC_AY10_Q4 | WSC, Order R5-2008-0005, Mar 1st 2011, AY10, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2011 Submittal, Annual Year 2010, Quarter 4, Sampling Dates Oct10-Jan11 |
WSC_AY11_Q1 | WSC, Order R5-2008-0005, Jun 1st 2011, AY11, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2011 Submittal, Annual Year 2011, Quarter 1, Sampling Dates Jan-Mar 2011 |
WSC_AY11_Q2 | WSC, Order R5-2008-0005, Sep 1st 2011, AY11, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2011 Submittal, Annual Year 2011, Quarter 2, Sampling Dates Apr-Aug 2011 |
WSC_AY11_Q3 | WSC, Order R5-2008-0005, Dec 1st 2011, AY11, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2011 Submittal, Annual Year 2011, Quarter 3, Sampling Dates Aug-Oct 2011 |
WSC_AY11_Q4 | WSC, Order R5-2008-0005, Mar 1st 2012, AY11, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2012 Submittal, Annual Year 2011, Quarter 4, Sampling Dates Nov11-Jan12 |
WSC_AY12_Q1 | WSC, Order R5-2008-0005, Jun 1st 2012, AY12, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2012 Submittal, Annual Year 2012, Quarter 1, Sampling Dates Feb-Apr 2012 |
WSC_AY12_Q2 | WSC, Order R5-2008-0005, Sep 1st 2012, AY12, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2012 Submittal, Annual Year 2012, Quarter 2, Sampling Dates Apr-Jul 2012 |
WSC_AY12_Q3 | WSC, Order R5-2008-0005, Dec 1st 2012, AY12, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2012 Submittal, Annual Year 2012, Quarter 3, Sampling Dates Jul-Sep 2012 |
WSC_AY12_Q4 | WSC, Order R5-2008-0005, Mar 1st 2013, AY12, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, March 1st 2013 Submittal, Annual Year 2012, Quarter 4, Sampling Dates Oct-Dec 2012 |
WSC_AY13_Q1 | WSC, Order R5-2008-0005, Jun 1st 2013, AY13, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, June 1st 2013 Submittal, Annual Year 2013, Quarter 1, Sampling Dates Jan-Apr 2013 |
WSC_AY13_Q2 | WSC, Order R5-2008-0005, Sep 1st 2013, AY13, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, September 1st 2013 Submittal, Annual Year 2013, Quarter 2, Sampling Dates Apr-Jul 2013 |
WSC_AY13_Q3 | WSC, Order R5-2008-0005, Dec 1st 2013, AY13, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2008-005, December 1st 2013 Submittal, Annual Year 2013, Quarter 3, Sampling Dates Jul-Sep 2013 |
WSC_AY13_Q4 | WSC, Order R5-2013-0120, Mar 1st 2014, AY13, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, March 1st 2014 Submittal, Annual Year 2013, Quarter 4, Sampling Dates Oct-Dec 2013 |
WSC_AY14_Q1 | WSC, Order R5-2013-0120, Jun 1st 2014, AY14, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, June 1st 2014 Submittal, Annual Year 2014 , Quarter 1, Sampling Dates Jan-Mar 2014 |
WSC_AY14_Q2 | WSC, Order R5-2013-0120, Sep 1st 2014, AY14, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, September 1st 2014 Submittal, Annual Year 2014 , Quarter 2, Sampling Dates Apr-Jun 2014 |
WSC_AY14_Q3 | WSC, Order R5-2013-0120, Dec 1st 2014, AY14, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, December 1st 2014 Submittal, Annual Year 2014 , Quarter 3, Sampling Dates Jul-Sep 2014 |
WSC_AY14_Q4 | WSC, Order R5-2013-0120, Mar 1st 2015, AY14, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, Mar 1st 2015 Submittal, Annual Year 2014 , Quarter 4, Sampling Dates Oct-Dec 2014 |
WSC_AY15_Q1 | WSC, Order R5-2013-0120, Jun 1st 2015, AY15, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, June 1st 2015 Submittal, Annual Year 2015 , Quarter 1, Sampling Dates Jan-Mar 2015 |
WSC_AY15_Q2 | WSC, Order R5-2013-0120, Sep 1st 2015, AY15, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, September 1st 2015 Submittal, Annual Year 2015 , Quarter 2, Sampling Dates Apr-Jun 2015 |
WSC_AY15_Q3 | WSC, Order R5-2013-0120, Dec 1st 2015, AY15, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, December 1st 2015 Submittal, Annual Year 2015 , Quarter 3, Sampling Dates Jul-Sep 2015 |
WSC_AY15_Q4 | WSC, Order R5-2013-0120, Mar 1st 2016, AY15, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, March 1st 2016 Submittal, Annual Year 2015 , Quarter 4, Sampling Dates Oct-Dec 2015 |
WSC_AY16_Q1 | WSC, Order R5-2013-0120, Jun 1st 2016, AY16, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, June 1st 2016 Submittal, Annual Year 2016 , Quarter 1, Sampling Dates Jan-Mar 2016 |
WSC_AY16_Q2 | WSC, Order R5-2013-0120, Sep 1st 2016, AY16, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, September 1st 2016 Submittal, Annual Year 2016 , Quarter 2, Sampling Dates Apr-Jun 2016 |
WSC_Historical | WSC, Order R5-2008-0005, 2006-2008 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2003-0826, R5-2008-0005, Sampling Dates Mar-Apr 2006 and Jan-Feb 2008 |
WSC_WY17_Q1 | WSC, Order R5-2014-0001, Mar 1st 2017, WY17, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, March 1st 2017 Submittal, Water Year 2017, Quarter 1, Sampling Dates Oct-Dec 2016 |
WSC_WY17_Q2 | WSC, Order R5-2014-0001, June 1st 2017, WY17, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, June 1st 2017 Submittal, Water Year 2017, Quarter 2, Sampling Dates Jan-Mar 2017 |
WSC_WY17_Q3 | WSC, Order R5-2014-0001, Sept 1st 2017, WY17, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, September 1st 2017 Submittal, Water Year 2017, Quarter 3, Sampling Dates Apr-Jun 2017 |
WSC_WY17_Q4 | WSC, Order R5-2014-0001, Dec 1st 2017, WY17, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, December 1st 2017 Submittal, Water Year 2017, Quarter 4, Sampling Dates Jul-Sep 2017 |
WSC_WY18_Q1 | WSC, Order R5-2014-0001, Mar 1st 2018, WY18, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, March 1st 2018 Submittal, Water Year 2018, Quarter 1, Sampling Dates Oct-Dec 2017 |
WSC_WY18_Q2 | WSC, Order R5-2014-0001, June 1st 2018, WY18, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, June 1st 2018 Submittal, Water Year 2018, Quarter 2, Sampling Dates Jan-Mar 2018 |
WSC_WY18_Q3 | WSC, Order R5-2014-0001, Sept 1st 2018, WY18, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, September 1st 2018 Submittal, Water Year 2018, Quarter 3, Sampling Dates Apr-Jun 2018 |
WSC_WY18_Q4 | WSC, Order R5-2014-0001, Dec 1st 2018, WY18, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, December 1st 2018 Submittal, Water Year 2018, Quarter 4, Sampling Dates Jul-Sep 2018 |
WSC_WY19_Q1 | WSC, Order R5-2014-0001, Mar 1st 2019, WY19, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, March 1st 2019 Submittal, Water Year 2019, Quarter 1, Sampling Dates Oct-Dec 2018 |
WSC_WY19_Q2 | WSC, Order R5-2014-0001, June 1st 2019, WY19, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, June 1st 2019 Submittal, Water Year 2019, Quarter 2, Sampling Dates Jan-Mar 2019 |
WSC_WY19_Q3 | WSC, Order R5-2014-0001, Sept 1st 2019, WY19, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001, September 1st 2019 Submittal, Water Year 2019, Quarter 3, Sampling Dates Apr-Jun 2019 |
WSC_WY19_Q4 | WSC, Order R5-2014-0001-06, Mar 1st 2020, WY19, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-06, March 1st 2020 Submittal, Water Year 2019, Quarter 4, Sampling Dates Jul-Sep 19 |
WSC_WY20_Q1 | WSC, Order R5-2014-0001-06, Jun 1st 2020, WY20, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-06, June 1st 2020 Submittal, Water Year 2020, Quarter 1, Sampling Dates Oct-Dec 2019 |
WSC_WY20_Q2 | WSC, Order R5-2014-0001-07, Sep 1st 2020, WY20, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-07, September 1st 2020 Submittal, Water Year 2020, Quarter 2, Sampling Dates Jan-Mar 2020 |
WSC_WY20_Q3 | WSC, Order R5-2014-0001-07, Dec 1st 2020, WY20, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-07, December 1st 2020 Submittal, Water Year 2020, Quarter 3, Sampling Dates Apr-Jun 2020 |
WSC_WY20_Q4 | WSC, Order R5-2014-0001-07, Mar 1st 2021, WY20, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-07, March 1st 2021 Submittal, Water Year 2020, Quarter 4, Sampling Dates Jul-Sep 2020 |
WSC_WY21_Q1 | WSC, Order R5-2014-0001-07, Jun 1st 2021, WY21, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-07, June 1st 2021 Submittal, Water Year 2021, Quarter 1, Sampling Dates Oct-Dec 2020 |
WSC_WY21_Q2 | WSC, Order R5-2014-0001-07, Sep 1st 2021, WY21, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-07, September 1st 2021 Submittal, Water Year 2021, Quarter 2, Sampling Dates Jan-Mar 2021 |
WSC_WY21_Q3 | WSC, Order R5-2014-0001-08, Dec 1st 2021, WY21, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, December 1st 2021 Submittal, Water Year 2021, Quarter 3, Sampling Dates Apr-Jun 2021 |
WSC_WY21_Q4 | WSC, Order R5-2014-0001-08, Mar 1st 2022, WY21, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, March 1st 2022 Submittal, Water Year 2021, Quarter 4, Sampling Dates Jul-Sep 2021 |
WSC_WY22_Q1 | WSC, Order R5-2014-0001-08, Jun 1st 2022, WY22, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, June 1st 2022 Submittal, Water Year 2022, Quarter 1, Sampling Dates Oct-Dec 2021 |
WSC_WY22_Q2 | WSC, Order R5-2014-0001-08, Sep 1st 2022, WY22, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, September 1st 2022 Submittal, Water Year 2022, Quarter 2, Sampling Dates Jan-Mar 2022 |
WSC_WY22_Q3 | WSC, Order R5-2014-0001-08, Dec 1st 2022, WY22, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, December 1st 2022 Submittal, Water Year 2022, Quarter 3, Sampling Dates Apr-Jun 2022 |
WSC_WY22_Q4 | WSC, Order R5-2014-0001-08, Mar 1st 2023, WY22, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, March 1st 2023 Submittal, Water Year 2022, Quarter 4, Sampling Dates Jul-Sep 2022 |
WSC_WY23_Q1 | WSC, Order R5-2014-0001-08, Jun 1st 2023, WY23, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, June 1st 2023 Submittal, Water Year 2023, Quarter 1, Sampling Dates Oct-Dec 2022 |
WSC_WY23_Q2 | WSC, Order R5-2014-0001-08, Sep 1st 2023, WY23, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, September 1st 2023 Submittal, Water Year 2023, Quarter 2, Sampling Dates Jan-Mar 2023 |
WSC_WY23_Q3 | WSC, Order R5-2014-0001-08, Dec 1st 2023, WY23, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, December 1st 2023 Submittal, Water Year 2023, Quarter 3, Sampling Dates Apr-Jun 2023 |
WSC_WY23_Q4 | WSC, Order R5-2014-0001-08, Mar 1st 2024, WY23, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, March 1st 2023 Submittal, Water Year 2023, Quarter 4, Sampling Dates Jul-Sep 2023 |
WSC_WY24_Q1 | WSC, Order R5-2014-0001-08, Jun 1st 2024, WY24, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, June 1st 2024 Submittal, Water Year 2024, Quarter 1, Sampling Dates Oct-Dec 2023 |
WSC_WY24_Q2 | WSC, Order R5-2014-0001-08, Sep 1st 2024, WY24, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, September 1st 2024 Submittal, Water Year 2024, Quarter 2, Sampling Dates Jan-Mar 2024 |
WSC_WY24_Q3 | WSC, Order R5-2014-0001-08, Dec 1st 2024, WY24, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, December 1st 2024 Submittal, Water Year 2024, Quarter 3, Sampling Dates Apr-Jun 2024 |
WSC_WY24_Q4 | WSC, Order R5-2014-0001-08, Mar 1st 2025, WY24, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, March 1st 2025 Submittal, Water Year 2024, Quarter 4, Sampling Dates Jul-Sep 2024 |
WSC_WY25_Q1 | WSC, Order R5-2014-0001-08, Jun 1st 2025, WY25, Q1 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, June 1st 2025 Submittal, Water Year 2025, Quarter 1, Sampling Dates Oct-Dec 2024 |
WSC_WY25_Q2 | WSC, Order R5-2014-0001-08, Sep 1st 2025, WY25, Q2 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, September 1st 2025 Submittal, Water Year 2025, Quarter 2, Sampling Dates Jan-Mar 2025 |
WSC_WY25_Q3 | WSC, Order R5-2014-0001-08, Dec 1st 2025, WY25, Q3 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, December 1st 2025 Submittal, Water Year 2025, Quarter 3, Sampling Dates Apr-Jun 2025 |
WSC_WY25_Q4 | WSC, Order R5-2014-0001-08, Mar 1st 2026, WY25, Q4 | Westlands Stormwater Coalition Monitoring Under ILRP Order R5-2014-0001-08, March 1st 2026 Submittal, Water Year 2025, Quarter 4, Sampling Dates Jul-Sep 2025 |
WSJRWC_Weekly_HWY152 | WSJRWC Weekly Wetland Supply Channel Monitoring | WSJRWC Weekly Wetland Supply Channel Monitoring |
WSWQC_BactSourceStudy | WSWQC Special Study - Bacteria Sourcing | Agricultural Water Quality Monitoring under the Irrigated Lands Regulatory Program |
WWQ_AY14_Q1 | WWQ, Order R5-2013-0120, Jun 1st 2014, AY14, Q1 | Westside Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, June 1st 2014 Submittal, Annual Year 2014, Quarter 1, Sampling Dates Jan-Mar 2014 |
WWQ_AY14_Q2 | WWQ, Order R5-2013-0120, Sep 1st 2014, AY14, Q2 | Westside Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, September 1st 2014 Submittal, Annual Year 2014, Quarter 2, Sampling Dates Apr-June 2014 |
WWQ_AY14_Q3 | WWQ, Order R5-2013-0120, Dec 1st 2014, AY14, Q3 | Westside Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, December 1st 2014 Submittal, Annual Year 2014, Quarter 3, Sampling Dates Jul-Sep 2014 |
WWQ_AY14_Q4 | WWQ, Order R5-2013-0120, Mar 1st 2015, AY14, Q4 | Westside Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, March 1st 2015 Submittal, Annual Year 2014, Quarter 4, Sampling Dates Oct-Dec 2014 |
WWQ_AY15_Q1 | WWQ, Order R5-2013-0120, Jun 1st 2015, AY15, Q1 | Westside Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, June 1st 2015 Submittal, Annual Year 2015, Quarter 1, Sampling Dates Jan-Mar 2015 |
WWQ_AY15_Q2 | WWQ, Order R5-2013-0120, Sep 1st 2015, AY15, Q2 | Westside Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, September 1st 2015 Submittal, Annual Year 2015, Quarter 2, Sampling Dates Apr-Jun 2015 |
WWQ_AY15_Q3 | WWQ, Order R5-2013-0120, Dec 1st 2015, AY15, Q3 | Westside Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, December 1st 2015 Submittal, Annual Year 2015, Quarter 3, Sampling Dates Jul-Sep 2015 |
WWQ_AY15_Q4 | WWQ, Order R5-2013-0120, Mar 1st 2016, AY15, Q4 | Westside Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, March 1st 2016 Submittal, Annual Year 2015, Quarter 4, Sampling Dates Oct-Dec 2015 |
WWQ_AY16_Q1 | WWQ, Order R5-2013-0120, Jun 1st 2016, AY16, Q1 | Westside Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, June 1st 2016 Submittal, Annual Year 2016, Quarter 1, Sampling Dates Jan-Mar 2016 |
WWQ_AY16_Q2 | WWQ, Order R5-2013-0120, Sep 1st 2016, AY16, Q2 | Westside Water Quality Coalition Monitoring Under ILRP Order R5-2013-0120, September 1st 2016 Submittal, Annual Year 2016, Quarter 2, Sampling Dates Apr-Jun 2016 |
Yolo_PEST_2015-2016 | SFCWA YoloBypassFoodWeb PEST 2015-2016 | Yolo Bypass Food Web Pasticide Sample Collection 2015-2016 |